  1. 2026-09-28
    Transaction rewritten

    For the project "OUTPUT 5.10: TECHNICAL ASSISTANCE & SUPPORT", transactions changed by 53.10% from USD 40,119.00 (date 2026-07-31) to USD 61,434.00 (date 2026-08-31), 22 transactions totaling USD 5,184,525.

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 40,119 → USD 61,434 (+53.1%)

    OUTPUT 5.10: TECHNICAL ASSISTANCE & SUPPORT · United Nations Children's Fund (UNICEF) · compare 3d6b5e4f → 5522a521

  2. 2026-09-28
    Transaction rewritten

    For the project "OUTPUT 5.3: ACCOUNTABLE AND SUSTAINABLEEDUCATION SYSTEM", transactions increased by 83.00% from USD 526,554.24 (dating to 2026-07-31) to USD 963,840.61 (dating to 2026-08-31), alongside multiple data updates in a bulk publisher correction.

    • Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 526,554.24 → USD 963,840.61 (+83.0%)

    OUTPUT 5.3: ACCOUNTABLE AND SUSTAINABLEEDUCATION SYSTEM · United Nations Children's Fund (UNICEF) · compare 3d6b5e4f → 5522a521

  3. 2026-09-28
    Transaction rewritten

    For project "OUTPUT 5.2: QUALITY BLENDED TEACHING AND LEARNING", total transactions increased by 15.20% from USD 18,472,822.31 to USD 21,281,428.37, dates were extended from 2026-07-31 to 2026-08-31, and the title was changed,

    • Transaction rewritten: 10 transactions restated as of 2026-08-31: total USD 18,472,822.31 → USD 21,281,428.37 (+15.2%)

    OUTPUT 5.2: QUALITY BLENDED TEACHING AND LEARNING · United Nations Children's Fund (UNICEF) · compare 3d6b5e4f → 5522a521

  4. 2026-09-28
    Transaction rewritten

    For the project "OUTPUT 3.1: POLICY, LEGISLATION, COORDINATION FOR HIV & ADAP", a transaction was restated from USD 111,428.17 to USD 149,369.37 with its date changed from 2026-07-31 to 2026-08-31, a new transaction of USD 298.00

    • Transaction rewritten: 1 transaction restated as of 2026-08-31: total USD 111,428.17 → USD 149,369.37 (+34.0%)

    OUTPUT 3.1: POLICY, LEGISLATION, COORDINATION FOR HIV & ADAP · United Nations Children's Fund (UNICEF) · compare 3d6b5e4f → 5522a521

  5. 2026-09-28
    Transaction rewritten

    For "OUTP 2.10: TECHNICAL ASSISTANCE & SUPPORT", transactions restated from USD 1,557,051.00 ending 2026-07-31 to USD 1,912,500.00 ending 2026-08-31, 25 transactions changed, 2 transactions totaling USD 38,875.00 were

    • Transaction rewritten: 9 transactions restated as of 2026-08-31: total USD 1,557,051 → USD 1,912,500 (+22.8%)

    OUTP 2.10: TECHNICAL ASSISTANCE & SUPPORT · United Nations Children's Fund (UNICEF) · compare 3d6b5e4f → 5522a521

  6. 2026-09-28
    Transaction rewritten

    For the United Nations Children's Fund (UNICEF) project "OUTPUT 2.2: NUTRITION SERVICES AND PRACTICES", restated transaction totals decreased by 32.30% from USD 364,868.33 to USD 247,059.51 with dates shifting from 2026-07-31 to 2026-08-31, and

    • Transaction rewritten: 4 transactions restated as of 2026-08-31: total USD 364,868.33 → USD 247,059.51 (-32.3%)

    OUTPUT 2.2: NUTRITION SERVICES AND PRACTICES · United Nations Children's Fund (UNICEF) · compare 3d6b5e4f → 5522a521

  7. 2026-09-28
    Transaction rewritten

    For project "OUTPUT 2.1: NUTRITION POLICY, LEGISLATION & EVIDENCE", transactions increased by 93.20% from USD 925,428.00 to USD 1,787,949.00 with dates moved from 2026-07-31 to 2026-08-31, alongside title and description updates, as part of a

    • Transaction rewritten: 9 transactions restated as of 2026-08-31: total USD 925,428 → USD 1,787,949 (+93.2%)

    OUTPUT 2.1: NUTRITION POLICY, LEGISLATION & EVIDENCE · United Nations Children's Fund (UNICEF) · compare 3d6b5e4f → 5522a521

  8. 2026-09-28
    Transaction rewritten

    For the project "OUTPUT 1.3: SOCIAL BEHAVIOR CHANGE AND HEALTH PROMOTION", transactions decreased by 25.90% from USD 160,440.00 to USD 118,875.00 for the period ending August 31, 2026, alongside title and description updates as part of a bulk correction.

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 160,440 → USD 118,875 (-25.9%)

    OUTPUT 1.3: SOCIAL BEHAVIOR CHANGE AND HEALTH PROMOTION · United Nations Children's Fund (UNICEF) · compare 3d6b5e4f → 5522a521

  9. 2026-09-28
    Transactions removed
    +1 more

    In project "OPERATIONS SUPPORT", 27 transactions totaling USD 4,239,885.00 were restated to USD 3,234,084.00, six transactions totaling USD 48,651.00 were removed, six transactions totaling USD 158,440.00 were added, and 46 transactions were updated.

    • Transactions removed: 6 transactions removed, USD 49k
    • Transaction rewritten: 27 transactions restated as of 2026-08-31: total USD 4,239,885 → USD 3,234,084 (-23.7%)

    OPERATIONS SUPPORT · United Nations Children's Fund (UNICEF) · compare aa421e88 → f7eca23e

  10. 2026-09-28
    Transactions removed

    For the project "PLANNING, MONITORING AND EVALUATION", 46 transactions totaling USD 3,538,263.00 were changed, 21 transactions were restated from USD 365,946.00 to USD 365,538.00 (-0.10%), 4 transactions totaling USD 79,490.00 were added, and 3 transactions

    • Transactions removed: 3 transactions removed, USD 2,778

    PLANNING, MONITORING AND EVALUATION · United Nations Children's Fund (UNICEF) · compare aa421e88 → f7eca23e

  11. 2026-09-28
    Transaction rewritten

    For the project "DEP REP'S OFFICE", transaction totals decreased by 81.80% from USD 11,655,225.00 to USD 2,119,599.00 with dates updated from 2026-07-31 to 2026-08-31, 37 transactions were modified, 7 transactions totaling USD 82,

    • Transaction rewritten: 21 transactions restated as of 2026-08-31: total USD 11,655,225 → USD 2,119,599 (-81.8%)

    DEP REP'S OFFICE · United Nations Children's Fund (UNICEF) · compare aa421e88 → f7eca23e

  12. 2026-09-28
    Transaction rewritten

    In the project "INCLUSIVE AND SUSTAINABLE SOCIAL PROTECTION", total transactions decreased by 24.90% from USD 9,303,634.23 to USD 6,988,946.59 with end dates updated from 2026-07-31 to 2026-08-31, and the title was shortened from a descriptive phrase.

    • Transaction rewritten: 13 transactions restated as of 2026-08-31: total USD 9,303,634.23 → USD 6,988,946.59 (-24.9%)

    INCLUSIVE AND SUSTAINABLE SOCIAL PROTECTION · United Nations Children's Fund (UNICEF) · compare aa421e88 → f7eca23e

  13. 2026-09-28
    Transaction rewritten

    For the project "PREVENTION OF VIOLENCE AND HARMFUL PRACTICES", total transactions increased by 21.80% from USD 3,979,167.00 to USD 4,845,636.00 with dates extended to 2026-08-31, 16 transactions were modified, 10 new transactions totaling USD 104,265

    • Transaction rewritten: 12 transactions restated as of 2026-08-31: total USD 3,979,167 → USD 4,845,636 (+21.8%)

    PREVENTION OF VIOLENCE AND HARMFUL PRACTICES · United Nations Children's Fund (UNICEF) · compare aa421e88 → f7eca23e

  14. 2026-09-28
    Transaction rewritten

    In the project "(CLOSED) ENABLING ENVIRONMENT", transactions decreased by $897.00 (from $903.00 to $6.00) with dates extended from 2026-07-31 to 2026-08-31, and the title was shortened.

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 903 → USD 6 (-99.3%)

    (CLOSED) ENABLING ENVIRONMENT · United Nations Children's Fund (UNICEF) · compare aa421e88 → f7eca23e

  15. 2026-09-28
    Transaction rewritten

    For "(CLOSED) LEARNING QUALITY AND SYSTEM DEVELOPMENT", transactions decreased by USD 40,479.00 to a total of USD -40,479.00 with dates moved from 2026-07-31 to 2026-08-31, new transactions totaling USD 75,492.00 were added, and the title was updated.

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 2,490 → USD -40,479 (-1725.7%)

    (CLOSED) LEARNING QUALITY AND SYSTEM DEVELOPMENT · United Nations Children's Fund (UNICEF) · compare aa421e88 → f7eca23e

  16. 2026-09-28
    Transaction rewritten

    For project "3.5 TECHNICAL ASSISTANCE OF CP", transactions increased by 146.10% from USD 1,262,838.00 to USD 3,107,838.00 with dates moving from July 31, 2026, to August 31, 2026, alongside added transactions and organization updates, likely as part of a bulk correction.

    • Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 1,262,838 → USD 3,107,838 (+146.1%)

    3.5 TECHNICAL ASSISTANCE OF CP · United Nations Children's Fund (UNICEF) · compare 96184dea → 29512631

  17. 2026-09-28
    Transaction rewritten

    For the project "3.3 CHILD FRIENDLY JUSTICE", transactions decreased by 14.20% from USD 12,094,482.82 to USD 10,381,387.55 and transaction dates shifted from 2026-07-31 to 2026-08-31, as part of a bulk correction across 17 projects.

    • Transaction rewritten: 5 transactions restated as of 2026-08-31: total USD 12,094,482.82 → USD 10,381,387.55 (-14.2%)

    3.3 CHILD FRIENDLY JUSTICE · United Nations Children's Fund (UNICEF) · compare 96184dea → 29512631

  18. 2026-09-28
    Transaction rewritten

    For the project "3.1 CHILD PROTECTION LAW & POLICY", transactions decreased by 62.40% from USD 744,097.82 to USD 279,771.31 extending the date to 2026-08-31, alongside title and organization updates, likely as part of a bulk correction.

    • Transaction rewritten: 5 transactions restated as of 2026-08-31: total USD 744,097.82 → USD 279,771.31 (-62.4%)

    3.1 CHILD PROTECTION LAW & POLICY · United Nations Children's Fund (UNICEF) · compare 96184dea → 29512631

  19. 2026-09-28
    Transaction rewritten

    For the UNICEF project "PROGRAMME COORDINATION", the title was updated, four organizations were added and three removed, and a transaction was restated from USD 120,360.00 to USD 210,555.00 with its date changed from 2026-07-31 to 2026-08-31; this is likely part of a bulk correction of 17

    • Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 120,360 → USD 210,555 (+74.9%)

    PROGRAMME COORDINATION · United Nations Children's Fund (UNICEF) · compare 96184dea → 29512631

  20. 2026-09-28
    Transaction rewritten

    For project "OUTPUT 6.9 CROSS - SECTORAL SUPPORT", the budget decreased by 4.90% to USD 55,156,983.00, transactions decreased by 14.10% to USD 28,563,975.00, and the title was updated, as part of a bulk correction by the publisher.

    • Transaction rewritten: 18 transactions restated as of 2026-08-31: total USD 33,268,002 → USD 28,563,975 (-14.1%)

    OUTPUT 6.9 CROSS - SECTORAL SUPPORT · United Nations Children's Fund (UNICEF) · compare 2c6e7275 → 8c53f43b

  21. 2026-09-28
    Transactions removed
    +1 more

    For the United Nations Children's Fund (UNICEF) project "OUTPUT 6.8 OPERATIONAL SUPPORT TO PROGRAMMES", the budget decreased by 4.60% from USD 10,295,341.00 to USD 9,821,689.00, and transactions were updated, alongside 13 other projects in a bulk correction. The publisher updated the project description to "New Element".

    • Transactions removed: 3 transactions removed, USD 3,348
    • Transaction rewritten: 12 transactions restated as of 2026-08-31: total USD 3,385,485 → USD 2,573,586 (-24.0%)

    OUTPUT 6.8 OPERATIONAL SUPPORT TO PROGRAMMES · United Nations Children's Fund (UNICEF) · compare 2c6e7275 → 8c53f43b

  22. 2026-09-28
    Transaction rewritten

    For project "OUTPUT 6.3 COMMUNICATION AND ADVOCACY", transactions increased by 20.00% from USD 660,141.00 to USD 792,051.00 and the budget increased by 6.70% from USD 806,064.00 to USD 860,004.00, as part of a bulk correction by

    • Transaction rewritten: 15 transactions restated as of 2026-08-31: total USD 660,141 → USD 792,051 (+20.0%)

    OUTPUT 6.3 COMMUNICATION AND ADVOCACY · United Nations Children's Fund (UNICEF) · compare 2c6e7275 → 8c53f43b

  23. 2026-09-28
    Transaction rewritten

    In project "OUTPUT 4.2 VAC PREVENTION & RESPONSE", total transactions increased by 66.50% to USD 7,909,798.04, total budget increased by 4.40% to USD 6,594,011.00, and 17 new transactions totaling USD 299,936.71 were added, as part of a bulk correction.

    • Transaction rewritten: 28 transactions restated as of 2026-08-31: total USD 4,749,793.38 → USD 7,909,798.04 (+66.5%)

    OUTPUT 4.2 VAC PREVENTION & RESPONSE · United Nations Children's Fund (UNICEF) · compare 2c6e7275 → 8c53f43b

  24. 2026-09-28
    Transaction rewritten
    +1 more

    In project "OUTPUT 4.1 CP SYSTEMS STRENGTHENING", transactions restated to USD 1,667,246.15 with dates extended to 2026-08-31, and the total budget increased by 48.1% to USD 2,619,833.00, as part of a bulk correction.

    • Transaction rewritten: 10 transactions restated as of 2026-08-31: total USD 527,207.88 → USD 1,667,246.15 (+216.2%)
    • Budget changed: Budget USD 1.77m → USD 2.62m (+48.1%)

    OUTPUT 4.1 CP SYSTEMS STRENGTHENING · United Nations Children's Fund (UNICEF) · compare 2c6e7275 → 8c53f43b

  25. 2026-09-28
    Transaction rewritten

    For the project "OUTPUT 2.3 SKILLING", the restated transaction total increased by 29.10% to USD 18,547,185.05 with dates shifted from 2026-07-31 to 2026-08-31, the budget decreased by 0.20% to USD 28,299,627.0

    • Transaction rewritten: 8 transactions restated as of 2026-08-31: total USD 14,363,749.22 → USD 18,547,185.05 (+29.1%)

    OUTPUT 2.3 SKILLING · United Nations Children's Fund (UNICEF) · compare 2c6e7275 → 8c53f43b

  26. 2026-09-28
    Transaction rewritten
    +1 more

    In the project "OUTPUT 9.4: OPERATIONAL SUPPORT TO PROGRAMME DELIVERY", the total budget increased by 19.1% to USD 35,135,130.00, transactions increased by 32.5% to USD 7,332,348.00, and the planned end date moved from 2026-12-31 to 2027

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 5,532,348 → USD 7,332,348 (+32.5%)
    • Budget changed: Budget USD 29.50m → USD 35.14m (+19.1%)

    OUTPUT 9.4: OPERATIONAL SUPPORT TO PROGRAMME DELIVERY · United Nations Children's Fund (UNICEF) · compare 7c00b677 → 68186974

  27. 2026-09-28
    Transaction rewritten
    +1 more

    For project "OUTPUT 5.4: TECHNICAL ASSISTANCE - CHILD PROTECTION", the budget increased by 26.90% to USD 12,409,242.00, transactions increased by USD 570,447.00, and the planned end date moved from 2026-12-31 to 2027-02-28, as part of a bulk

    • Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 272,493 → USD 570,447 (+109.3%)
    • Budget changed: Budget USD 9.78m → USD 12.41m (+26.9%)

    OUTPUT 5.4: TECHNICAL ASSISTANCE - CHILD PROTECTION · United Nations Children's Fund (UNICEF) · compare 7c00b677 → 68186974

  28. 2026-09-28
    Transaction rewritten
    +1 more

    For project "OUTPUT 5.3:COMMUNITY ACTION MOBILIZED AGAINST VAC", the budget increased by 13.5% to USD 28,802,184.00, transactions were restated to USD 1,813,353.00, and the planned end date was extended to February 28, 2027, as part of a bulk correction.

    • Transaction rewritten: 7 transactions restated as of 2026-08-31: total USD 1,469,451 → USD 1,813,353 (+23.4%)
    • Budget changed: Budget USD 25.37m → USD 28.80m (+13.5%)

    OUTPUT 5.3:COMMUNITY ACTION MOBILIZED AGAINST VAC · United Nations Children's Fund (UNICEF) · compare 7c00b677 → 68186974

  29. 2026-09-28
    Transaction rewritten

    For project "OUTPUT 5.2: CHILD PROTECTION SERVICES (XM-DAC-41122-Yemen-4920/A0/07/005/002)", the total budget increased by 1.30% to USD 55,249,516.00, transactions were restated to USD 1,121,727.08, and the planned

    • Transaction rewritten: 8 transactions restated as of 2026-08-31: total USD 915,488 → USD 1,121,727.08 (+22.5%)

    OUTPUT 5.2: CHILD PROTECTION SERVICES · United Nations Children's Fund (UNICEF) · compare 7c00b677 → 68186974

  30. 2026-09-28
    Budget changed

    For "OUTPUT 5.1:CHILD PROTECTION SYSTEM STRENGTHENING AT NATIONAL LEVEL" (XM-DAC-41122-Yemen-4920/A0/07/005/001), UNICEF increased the budget by 12.20% to USD 26,878,138.00, updated transactions, extended the planned end date to 2027-0

    • Budget changed: Budget USD 23.95m → USD 26.88m (+12.2%)

    OUTPUT 5.1:CHILD PROTECTION SYSTEM STRENGTHENING AT NATIONAL LEVEL · United Nations Children's Fund (UNICEF) · compare 7c00b677 → 68186974

  31. 2026-09-28
    Budget changed
    +1 more

    For project "CROSS SECTORAL OPERATIONS", the budget increased by 23.30% to USD 3,411,428.00 and the planned end date was extended to 2027-12-31, alongside other updates in a publisher bulk correction.

    • Budget changed: Budget USD 2.77m → USD 3.41m (+23.3%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    CROSS SECTORAL OPERATIONS · United Nations Children's Fund (UNICEF) · compare 0a6b5aeb → f6c51862

  32. 2026-09-28
    Transaction rewritten
    +1 more

    For the project "CHANGEMENT SOCIAL ET COMPORTEMENTAL", the budget increased by 1.00% to USD 19,472,940.00, the planned end date was extended to 2027-12-31, and transaction details and the publisher's description were updated, as part of a bulk correction.

    • Transaction rewritten: 4 transactions restated as of 2026-08-31: total USD 90,334.86 → USD 49,545.56 (-45.2%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    CHANGEMENT SOCIAL ET COMPORTEMENTAL · United Nations Children's Fund (UNICEF) · compare 0a6b5aeb → f6c51862

  33. 2026-09-28
    Budget changed
    +1 more

    For the UNICEF project "COMMUNICATION, PLAIDOYER ET PARTENARIATS", the budget increased by 26.80% to USD 937,572.00, the planned end date was extended to 2027-12-31, and transactions were updated, as part of a bulk correction by the publisher.

    • Budget changed: Budget USD 739k → USD 938k (+26.8%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    COMMUNICATION, PLAIDOYER ET PARTENARIATS · United Nations Children's Fund (UNICEF) · compare 0a6b5aeb → f6c51862

  34. 2026-09-28
    Transactions removed
    +3 more

    For the project "PLANIFICATION SUIVI EVALUATION", the total transaction value decreased by 36.30% from USD 3,887,286.00 to USD 2,476,260.00, the budget increased by 25.00% to USD 3,103,088.00, and the planned end date was extended to 2027-

    • Transactions removed: 9 transactions removed, USD 155k
    • Transaction rewritten: 9 transactions restated as of 2026-08-31: total USD 3,887,286 → USD 2,476,260 (-36.3%)
    • Budget changed: Budget USD 2.48m → USD 3.10m (+25.0%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    PLANIFICATION SUIVI EVALUATION · United Nations Children's Fund (UNICEF) · compare 0a6b5aeb → f6c51862

  35. 2026-09-28
    Transaction rewritten
    +2 more

    For the "JUSTICE POUR ENFANT ET ENREGISTREMENT DES NAISSANCES" project, the budget increased by 33.5% to USD 2,894,092.00, transactions were restated to USD 399,249.00, the planned end date was extended to December 31, 2027, and the title and description were updated. This update is part

    • Transaction rewritten: 9 transactions restated as of 2026-08-31: total USD 1,838,331 → USD 399,249 (-78.3%)
    • Budget changed: Budget USD 2.17m → USD 2.89m (+33.5%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    JUSTICE POUR ENFANT ET ENREGISTREMENT DES NAISSANCES · United Nations Children's Fund (UNICEF) · compare 0a6b5aeb → f6c51862

  36. 2026-09-28
    Transaction rewritten
    +2 more

    In project "ENGAGEMENT COMMUNAUTAIRE, PRATIQUES NÉFASTES", transactions decreased by 51.40% to USD 1,493,948.45, the budget increased by 35.40% to USD 3,502,236.00, and the planned end date was extended from 2026-12-31 to 2027

    • Transaction rewritten: 16 transactions restated as of 2026-08-31: total USD 3,073,058.53 → USD 1,493,948.45 (-51.4%)
    • Budget changed: Budget USD 2.59m → USD 3.50m (+35.4%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    ENGAGEMENT COMMUNAUTAIRE, PRATIQUES NÉFASTES · United Nations Children's Fund (UNICEF) · compare 0a6b5aeb → f6c51862

  37. 2026-09-28
    Transaction rewritten
    +1 more

    For the UNICEF project "RENFORCEMENT DU SYSTÈME" (XM-DAC-41122-Togo-4230/A0/07/733/001), the budget increased by 8.20% from USD 18,439,366.00 to USD 19,948,052.00, transactions were restated to USD

    • Transaction rewritten: 18 transactions restated as of 2026-08-31: total USD 4,804,317 → USD 3,631,815 (-24.4%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    RENFORCEMENT DU SYSTÈME · United Nations Children's Fund (UNICEF) · compare 0a6b5aeb → f6c51862

  38. 2026-09-28
    Transaction rewritten
    +2 more

    For UNICEF's "MEILLEUR ACCÈS AUX INTERVENTIONS À HAUTIMPACT TELLES QUE PCIME-C, SONU ET VIH", total transactions decreased by 48.10% to USD 3,660,521.15, budget increased by 15.00% to USD 36,898,112.00, and the planned end date was extended from

    • Transaction rewritten: 16 transactions restated as of 2026-08-31: total USD 7,054,116.02 → USD 3,660,521.15 (-48.1%)
    • Budget changed: Budget USD 32.08m → USD 36.90m (+15.0%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    MEILLEUR ACCÈS AUX INTERVENTIONS À HAUTIMPACT TELLES QUE PCIME-C, SONU ET VIH · United Nations Children's Fund (UNICEF) · compare 0a6b5aeb → f6c51862

  39. 2026-09-28
    Transaction rewritten

    For the project "CROSS SECTORAL APPROACHES (OPS)", eight transactions totaling USD 237,769.00 were added, restated transaction totals increased by 142.20% from USD 10,545.00 to USD 25,545.00, and the title and description were updated, likely as part of a bulk correction.

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 10,545 → USD 25,545 (+142.2%)

    CROSS SECTORAL APPROACHES (OPS) · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  40. 2026-09-28
    Transaction rewritten

    For project "SOCIAL AND BEHAVIOUR CHANGE AND GENDER", transactions increased by 48.30% from USD 13,225,243.80 to USD 19,610,064.99, with dates moving from 2026-07-31 to 2026-08-31, alongside title and organization updates in a bulk correction. This

    • Transaction rewritten: 12 transactions restated as of 2026-08-31: total USD 13,225,243.8 → USD 19,610,064.99 (+48.3%)

    SOCIAL AND BEHAVIOUR CHANGE AND GENDER · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  41. 2026-09-28
    Transaction rewritten

    For the project "EQUITABLE AND INCLUSIVE ACCESS TO EDU", transactions were restated increasing the total from USD 2,251,736.71 to USD 2,759,195.04 with dates updated from 2026-07-31 to 2026-08-31, eight transactions totaling USD 108,876.00 were added

    • Transaction rewritten: 8 transactions restated as of 2026-08-31: total USD 2,251,736.71 → USD 2,759,195.04 (+22.5%)

    EQUITABLE AND INCLUSIVE ACCESS TO EDU · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  42. 2026-09-28
    Transaction rewritten

    For the project "ADOPTION OF APPROPIATE NUTRITION PRACTICES", restated transactions decreased by 20.20% from USD 1,220,925.00 (ending 2026-07-31) to USD 974,655.00 (ending 2026-08-31), 7 new transactions totaling USD 114,5

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 1,220,925 → USD 974,655 (-20.2%)

    ADOPTION OF APPROPIATE NUTRITION PRACTICES · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  43. 2026-09-28
    Transaction rewritten

    For the project "QUALITY NUTRITION SERVICES", transactions increased by USD 458,475.32 (17.10%) to USD 3,134,513.28 with dates extended from 2026-07-31 to 2026-08-31, 17 new transactions totaling USD 691,487.71 were added,

    • Transaction rewritten: 10 transactions restated as of 2026-08-31: total USD 2,676,037.96 → USD 3,134,513.28 (+17.1%)

    QUALITY NUTRITION SERVICES · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  44. 2026-09-28
    Transaction rewritten

    For the project "SBCC CE ON HIV AND SRHR", transactions decreased by 55.60% (restated from USD 325,818.00 ending 2026-07-31 to USD 144,798.00 ending 2026-08-31), alongside other adjustments, as part of a bulk correction of 16 projects.

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 325,818 → USD 144,798 (-55.6%)

    SBCC CE ON HIV AND SRHR · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  45. 2026-09-28
    Transaction rewritten

    For the "HIV PREVENTION" project, transactions restated from July 31, 2026, to August 31, 2026, increased by USD 150,000.00 (14.40%) to USD 1,188,555.00, and the title was updated, in one of 16 project changes in this bulk correction.

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 1,038,555 → USD 1,188,555 (+14.4%)

    HIV PREVENTION · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  46. 2026-09-28
    Transaction rewritten

    For the project "QUALITY OF CARE", transactions totalling USD 872,586.00 with dates moved to 2026-08-31 changed by -29.40% (USD -364,200.00), and eight new transactions totalling USD 169,938.60 were added, as part of a bulk correction by the publisher.

    • Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 1,236,786 → USD 872,586 (-29.4%)

    QUALITY OF CARE · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  47. 2026-09-28
    Transaction rewritten

    For the "PRIMARY HEALTH CARE SYSTEMS READINESS" project, restated transactions increased by 40.90% from USD 1,880,826.67 to USD 2,649,422.34 and shifted to end on 2026-08-31, alongside added transactions and a title change, as part of a bulk correction.

    • Transaction rewritten: 7 transactions restated as of 2026-08-31: total USD 1,880,826.67 → USD 2,649,422.34 (+40.9%)

    PRIMARY HEALTH CARE SYSTEMS READINESS · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  48. 2026-09-28
    Transaction rewritten

    In project "COMMUNITY PRACTICES", transactions decreased by 53.40% from USD 610,971.00 to USD 284,478.00 with dates updated from 2026-07-31 to 2026-08-31, and the title was shortened, as part of a bulk correction by the publisher.

    • Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 610,971 → USD 284,478 (-53.4%)

    COMMUNITY PRACTICES · United Nations Children's Fund (UNICEF) · compare 2b4ffead → d7b42ae8

  49. 2026-09-28
    Transactions removed
    +2 more

    In project "OUTPUT 7.5: TECHNICAL SUPPORT (XM-DAC-41122-Syria-4140/A0/06/880/006)", the total transaction value decreased by 40.20% from USD 28,716,678.00 to USD 17,167,842.00, the budget increased by 2

    • Transactions removed: 6 transactions removed, USD 247k
    • Transaction rewritten: 33 transactions restated as of 2026-08-31: total USD 28,716,678 → USD 17,167,842 (-40.2%)
    • Budget changed: Budget USD 47.69m → USD 61.17m (+28.3%)

    OUTPUT 7.5: TECHNICAL SUPPORT · United Nations Children's Fund (UNICEF) · compare 0423922e → c3b9c441

  50. 2026-09-28
    Transactions removed
    +2 more

    For project "OUTPUT 8.7: TECHNICAL SUPPORT", the budget increased by 21.40% from USD 30,759,130.00 to USD 37,355,948.00, transactions decreased by 33.00% to USD 12,912,261.00, and the planned end date moved from 2026-

    • Transactions removed: 3 transactions removed, USD 315k
    • Transaction rewritten: 39 transactions restated as of 2026-08-31: total USD 19,268,022 → USD 12,912,261 (-33.0%)
    • Budget changed: Budget USD 30.76m → USD 37.36m (+21.4%)

    OUTPUT 8.7: TECHNICAL SUPPORT · United Nations Children's Fund (UNICEF) · compare 0423922e → c3b9c441

  51. 2026-09-28
    Budget changed

    For project "OUTPUT 8.4: OPERATIONAL SUPPORT", the budget increased by 21.00% to USD 71,694,798.00, restated transactions decreased by 0.20% to USD 13,297,614.00, and the planned end date moved from December 31, 2026, to February 28, 20

    • Budget changed: Budget USD 59.27m → USD 71.69m (+21.0%)

    OUTPUT 8.4: OPERATIONAL SUPPORT · United Nations Children's Fund (UNICEF) · compare 0423922e → c3b9c441

  52. 2026-09-28
    Transaction rewritten
    +1 more

    For the project "OUTPUT 4.5: TECHNICAL SUPPORT (XM-DAC-41122-Syria-4140/A0/06/400/005)", the total budget increased by 19.5% to USD 73,899,650.00 and the planned end date moved from 2026-12-31 to 2027

    • Transaction rewritten: 12 transactions restated as of 2026-08-31: total USD 13,122,042 → USD 5,669,919 (-56.8%)
    • Budget changed: Budget USD 61.82m → USD 73.90m (+19.5%)

    OUTPUT 4.5: TECHNICAL SUPPORT · United Nations Children's Fund (UNICEF) · compare 0423922e → c3b9c441

  53. 2026-09-28
    Transactions removed
    +2 more

    For the project "OUTPUT 4.2: RESTORED Water, Sanitation, and Hygiene (WASH) SYSTEMS", the budget increased by 24.2% to $406,730,454.00, transactions were updated, and the planned end date moved from 2026-12-31 to 2027-02-28, as part of a bulk correction by the publisher

    • Transactions removed: 3 transactions removed, USD 945k
    • Transaction rewritten: 24 transactions restated as of 2026-08-31: total USD 169,071,027 → USD 137,688,981 (-18.6%)
    • Budget changed: Budget USD 327.55m → USD 406.73m (+24.2%)

    OUTPUT 4.2: RESTORED Water, Sanitation, and Hygiene (WASH) SYSTEMS · United Nations Children's Fund (UNICEF) · compare 0423922e → c3b9c441

  54. 2026-09-28
    Transaction rewritten

    For project "CROSS-SECTORAL", total restated transactions decreased by 14.00% from USD 15,121,734.00 (dates: 2026-07-31) to USD 13,009,323.00 (dates: 2026-08-31), and budgets decreased by 8.80% to USD

    • Transaction rewritten: 36 transactions restated as of 2026-08-31: total USD 15,121,734 → USD 13,009,323 (-14.0%)

    CROSS-SECTORAL · United Nations Children's Fund (UNICEF) · compare e260c1fb → c9f6a648

  55. 2026-09-28
    Transaction rewritten
    +1 more

    In project "SBC INCLUDING AAP", total transactions increased by 58.30% to USD 27,075,461.51 and the budget increased by 34.50% to USD 21,088,990.00, as part of a bulk correction by the publisher.

    • Transaction rewritten: 26 transactions restated as of 2026-08-31: total USD 17,107,916 → USD 27,075,461.51 (+58.3%)
    • Budget changed: Budget USD 15.68m → USD 21.09m (+34.5%)

    SBC INCLUDING AAP · United Nations Children's Fund (UNICEF) · compare e260c1fb → c9f6a648

  56. 2026-09-28
    Transactions removed

    For project "FIELD OPERATIONS & EMERGENCY", total transactions decreased by $371,555.00 to $18,477,395.96 and the budget increased by 1.50% to $13,310,428.00; this change is part of a bulk correction affecting 18 projects in the same file update.

    • Transactions removed: 3 transactions removed, USD 363

    FIELD OPERATIONS & EMERGENCY · United Nations Children's Fund (UNICEF) · compare e260c1fb → c9f6a648

  57. 2026-09-28
    Transaction rewritten
    +1 more

    For the project "HARMFUL PRACTICES PREVENTION & RESPONSE", transactions decreased by 28.9% to USD 2,177,367.00 and the budget decreased by 15.8% to USD 2,236,360.00; this is likely part of a bulk correction.

    • Transaction rewritten: 9 transactions restated as of 2026-08-31: total USD 3,063,459 → USD 2,177,367 (-28.9%)
    • Budget changed: Budget USD 2.66m → USD 2.24m (-15.8%)

    HARMFUL PRACTICES PREVENTION & RESPONSE · United Nations Children's Fund (UNICEF) · compare e260c1fb → c9f6a648

  58. 2026-09-28
    Transaction rewritten
    +1 more

    For the project "TECHNICAL OPERATIONS SUPPORT TO PROG DEL", total transactions increased by 15.50% from USD 27,129,906.00 to USD 31,344,162.00, and the budget increased by 14.60% to USD 23,057,074.00, as part of a bulk correction by the publisher. According

    • Transaction rewritten: 48 transactions restated as of 2026-08-31: total USD 27,129,906 → USD 31,344,162 (+15.5%)
    • Budget changed: Budget USD 20.12m → USD 23.06m (+14.6%)

    TECHNICAL OPERATIONS SUPPORT TO PROG DEL · United Nations Children's Fund (UNICEF) · compare e260c1fb → c9f6a648

  59. 2026-09-28
    Transaction rewritten

    For the "OUTOUT 4.4 STAFF SALARIES" project, transactions were restated increasing the total by 20.10% from USD 98,748.00 on 2026-07-31 to USD 118,623.00 on 2026-08-31, alongside title and organization updates, in a file update covering 18 projects.

    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 98,748 → USD 118,623 (+20.1%)

    OUTOUT 4.4 STAFF SALARIES · United Nations Children's Fund (UNICEF) · compare e260c1fb → c9f6a648

  60. 2026-09-28
    Transactions removed

    In the project "ADVOCACY & EXTERNAL RELATIONS", 25 transactions totaling USD 248,994.00 were changed, 3 transactions totaling USD 6.00 were removed, 2 transactions totaling USD -101.00 were added, 4 organizations were added and 4 removed, and the title was updated. This change is part of a bulk correction involving 18 projects from the same publisher.

    • Transactions removed: 3 transactions removed, USD 6

    ADVOCACY & EXTERNAL RELATIONS · United Nations Children's Fund (UNICEF) · compare e260c1fb → c9f6a648

  61. 2026-09-28
    Transaction rewritten

    In project "TECHNICAL (STAFF) COSTS -OPERATIONAL EFFECTIVENESS", transaction totals decreased by 41.50% from USD 2,595,717.00 (ending 2026-07-31) to USD 1,518,210.00 (ending 2026-08-31), title and publisher descriptions were updated, and this is likely

    • Transaction rewritten: 9 transactions restated as of 2026-08-31: total USD 2,595,717 → USD 1,518,210 (-41.5%)

    TECHNICAL (STAFF) COSTS -OPERATIONAL EFFECTIVENESS · United Nations Children's Fund (UNICEF) · compare e260c1fb → c9f6a648

  62. 2026-09-28
    Budget changed
    +1 more

    For the project "5.1 CHILD PROTECTION SYSTEMS ENHANCEMENT ACTIVITIES", the budget increased by 30.70% from USD 14,518,052.00 to USD 18,978,740.00, the planned end date was extended from December 31, 2026 to December 31, 2027, and the title was updated. This

    • Budget changed: Budget USD 14.52m → USD 18.98m (+30.7%)
    • Dates changed: planned end 2026-12-31 → 2027-12-31

    5.1 CHILD PROTECTION SYSTEMS ENHANCEMENT ACTIVITIES · United Nations Children's Fund (UNICEF) · compare b6c53678 → 107fb35e

  63. 2026-09-28
    Transaction rewritten

    For the project "PREVENT & RESPOND TO VIOLENCE AGAINST CHILDREN IN SCHOOLS, COMMUNITIES, ONLINE.", a transaction's total was restated from USD 541,356.00 to USD 229,266.00 with its date changed from 2026-07-31 to 2026-08-31, four new transactions totaling USD 55,

    • Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 541,356 → USD 229,266 (-57.6%)

    PREVENT & RESPOND TO VIOLENCE AGAINST CHILDREN IN SCHOOLS, COMMUNITIES, ONLINE. · United Nations Children's Fund (UNICEF) · compare bc3cd898 → 69722ad0

  64. 2026-09-28
    Transactions removed
    +1 more

    For the project "OUTPUT 4.4 CLIMATE CHANGE AND CLIMATE ACTION", transactions totaling USD 72,000.00 were updated and six transactions removed, while nine transactions and the project title were changed, as part of a bulk correction by the publisher.

    • Transactions removed: 6 transactions removed, USD 36k
    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 45,000 → USD 72,000 (+60.0%)

    OUTPUT 4.4 CLIMATE CHANGE AND CLIMATE ACTION · United Nations Children's Fund (UNICEF) · compare 84a962f5 → 970e6c41

  65. 2026-09-28
    Transactions removed
    +1 more

    In project "OUTPUT 4.2: Water, Sanitation, and Hygiene (WASH) ACCESS AND QUALITY", transactions totaling USD 1,800,000.07 were removed, three transactions were restated from July 31, 2026, to August 31, 2026, five transactions were added, and two organizations were added, as part of a bulk correction by the publisher.

    • Transactions removed: 3 transactions removed, USD 13k
    • Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 5,537,442 → USD 3,737,442 (-32.5%)

    OUTPUT 4.2: Water, Sanitation, and Hygiene (WASH) ACCESS AND QUALITY · United Nations Children's Fund (UNICEF) · compare 84a962f5 → 970e6c41

  66. 2026-09-28
    Transaction rewritten

    For project "OUTPUT 3.3: CHILD PROTECTION PRACTICES AND BEHAVIOURS", transactions increased by 40.40% to USD 1,375,434.00 and dates moved from 2026-07-31 to 2026-08-31, alongside twelve transaction updates and a title change, in a bulk correction by the publisher.

    • Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 979,434 → USD 1,375,434 (+40.4%)

    OUTPUT 3.3: CHILD PROTECTION PRACTICES AND BEHAVIOURS · United Nations Children's Fund (UNICEF) · compare 84a962f5 → 970e6c41

  67. 2026-09-28
    Transaction rewritten

    In project "OUTPUT 3.2: PREVENTIVE AND RESPONSIVE CP SERVICES", the restated transaction total increased by 15.00% from USD 1,013,174.03 to USD 1,164,695.72 with dates shifted from 2026-07-31 to 2026-08-31, and the title and description

    • Transaction rewritten: 5 transactions restated as of 2026-08-31: total USD 1,013,174.03 → USD 1,164,695.72 (+15.0%)

    OUTPUT 3.2: PREVENTIVE AND RESPONSIVE CP SERVICES · United Nations Children's Fund (UNICEF) · compare 84a962f5 → 970e6c41

  68. 2026-09-28
    Transaction rewritten

    For the project "OUTPUT 1.3: HEALTH AND NUTRITION PRACTICES AND BEHAVIOURS", transactions increased by 40.50% from USD 2,509,455.00 to USD 3,524,895.00, dates shifted from 2026-07-31 to 2026-08-31, and the title and description

    • Transaction rewritten: 15 transactions restated as of 2026-08-31: total USD 2,509,455 → USD 3,524,895 (+40.5%)

    OUTPUT 1.3: HEALTH AND NUTRITION PRACTICES AND BEHAVIOURS · United Nations Children's Fund (UNICEF) · compare 84a962f5 → 970e6c41

Who they fund

UNITED NATIONS DEVELOPMENT PROGRAMME · OpenAid Ledger