The World Bank / worldbank-389
Eastern Caribbean Energy Regulatory Authority (ECERA)
44000-P101414
USD 5.74mdeclared budget
USD 2.73mdisbursed and spent, 18 of 97 transactions
Finalisationstatus
30 Nov 2018actual end
Budget over time
- Reporting organisation
- World Bank
- Start
- 16 Jun 2011
- Countries
- —
- Sectors
- Energy sector policy, planning and administration (23111) 100%; LP · publisher's own 100.000000%; 000212 · publisher's own 50%; 000014 · publisher's own 50%
- Funded by
- International Development Association
- Participating
- International Development Association (funding); Government of Grenada (accountable); Government of Grenada (accountable); Government of Grenada (accountable); Government of Saint Lucia (accountable); Government of Saint Lucia (accountable); Government of Saint Lucia (accountable); International Development Association (extending) and 1 more
- Versions seen
- 3 since 26 Sept 2026 · last checked 2026-10-04 04:31 UTC
Changes
- 2026-10-04Transactions removed+2 more
94 transactions removed, USD 2.16m
- Budget changed: Budget USD 12.44m → USD 5.74m (-53.9%)
- Transactions added: 94 transactions added, USD 2.16m
Eastern Caribbean Energy Regulatory Authority (ECERA) · compare b6799268 → ebf28d20
- 2026-10-02Other edit
Content edited
Eastern Caribbean Energy Regulatory Authority (ECERA) · compare d676076e → b6799268
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2016-12-01 → 2018-11-30 | revised, indicative | USD 2.87m | current |
| 2016-12-01 → 2018-11-30 | original, indicative | USD 2.87m | current |
| 2011-06-01 → 2011-06-30 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2011-07-01 → 2011-07-31 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-08-01 → 2011-08-31 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-09-01 → 2011-09-30 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-10-01 → 2011-10-31 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-11-01 → 2011-11-30 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-12-01 → 2011-12-31 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-01-01 → 2012-01-31 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-02-01 → 2012-02-29 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-03-01 → 2012-03-31 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-04-01 → 2012-04-30 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-05-01 → 2012-05-31 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-06-01 → 2012-06-30 | original | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-07-01 → 2012-07-31 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2012-08-01 → 2012-08-31 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2012-09-01 → 2012-09-30 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2012-10-01 → 2012-10-31 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2012-11-01 → 2012-11-30 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2012-12-01 → 2012-12-31 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2013-01-01 → 2013-01-31 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2013-02-01 → 2013-02-28 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2013-03-01 → 2013-03-31 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2013-04-01 → 2013-04-30 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2013-05-01 → 2013-05-31 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2013-06-01 → 2013-06-30 | original | USD 167k | superseded, last seen 03 Oct 2026 |
| 2013-07-01 → 2013-07-31 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2013-08-01 → 2013-08-31 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2013-09-01 → 2013-09-30 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2013-10-01 → 2013-10-31 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2013-11-01 → 2013-11-30 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2013-12-01 → 2013-12-31 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2014-01-01 → 2014-01-31 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2014-02-01 → 2014-02-28 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2014-03-01 → 2014-03-31 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2014-04-01 → 2014-04-30 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2014-05-01 → 2014-05-31 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2014-06-01 → 2014-06-30 | original | USD 92k | superseded, last seen 03 Oct 2026 |
| 2014-07-01 → 2014-07-31 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2014-08-01 → 2014-08-31 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2014-09-01 → 2014-09-30 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2014-10-01 → 2014-10-31 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2014-11-01 → 2014-11-30 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2014-12-01 → 2014-12-31 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2015-01-01 → 2015-01-31 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2015-02-01 → 2015-02-28 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2015-03-01 → 2015-03-31 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2015-04-01 → 2015-04-30 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2015-05-01 → 2015-05-31 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2015-06-01 → 2015-06-30 | original | USD 83k | superseded, last seen 03 Oct 2026 |
| 2015-07-01 → 2015-07-31 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2015-08-01 → 2015-08-31 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2015-09-01 → 2015-09-30 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2015-10-01 → 2015-10-31 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2015-11-01 → 2015-11-30 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2015-12-01 → 2015-12-31 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2016-01-01 → 2016-01-31 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2016-02-01 → 2016-02-29 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2016-03-01 → 2016-03-31 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2016-04-01 → 2016-04-30 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2016-05-01 → 2016-05-31 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2016-06-01 → 2016-06-30 | original | USD 42k | superseded, last seen 03 Oct 2026 |
| 2016-07-01 → 2016-07-31 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2016-08-01 → 2016-08-31 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2016-09-01 → 2016-09-30 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2016-10-01 → 2016-10-31 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2016-11-01 → 2016-11-30 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2016-12-01 → 2016-12-31 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2017-01-01 → 2017-01-31 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2017-02-01 → 2017-02-28 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2017-03-01 → 2017-03-31 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2017-04-01 → 2017-04-30 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2017-05-01 → 2017-05-31 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2017-06-01 → 2017-06-30 | original | USD 33k | superseded, last seen 03 Oct 2026 |
| 2017-07-01 → 2017-07-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-08-01 → 2017-08-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-09-01 → 2017-09-30 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-10-01 → 2017-10-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-11-01 → 2017-11-30 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-12-01 → 2017-12-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-01-01 → 2018-01-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-02-01 → 2018-02-28 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-03-01 → 2018-03-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-04-01 → 2018-04-30 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-05-01 → 2018-05-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-06-01 → 2018-06-30 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-09-01 → 2018-09-30 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-10-01 → 2018-10-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-11-01 → 2018-11-30 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-12-01 → 2018-12-31 | original | USD 0 | superseded, last seen 03 Oct 2026 |
| 2011-06-01 → 2011-06-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2011-07-01 → 2011-07-31 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-08-01 → 2011-08-31 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-09-01 → 2011-09-30 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-10-01 → 2011-10-31 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-11-01 → 2011-11-30 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2011-12-01 → 2011-12-31 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-01-01 → 2012-01-31 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-02-01 → 2012-02-29 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-03-01 → 2012-03-31 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-04-01 → 2012-04-30 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-05-01 → 2012-05-31 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-06-01 → 2012-06-30 | revised | USD 50k | superseded, last seen 03 Oct 2026 |
| 2012-07-01 → 2012-07-31 | revised | USD 167k | superseded, last seen 03 Oct 2026 |
| 2012-08-01 → 2012-08-31 | revised | USD 167k | superseded, last seen 03 Oct 2026 |
| 2012-09-01 → 2012-09-30 | revised | USD 167k | superseded, last seen 03 Oct 2026 |
| 2012-10-01 → 2012-10-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2012-11-01 → 2012-11-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2012-12-01 → 2012-12-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-01-01 → 2013-01-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-02-01 → 2013-02-28 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-03-01 → 2013-03-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-04-01 → 2013-04-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-05-01 → 2013-05-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-06-01 → 2013-06-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-07-01 → 2013-07-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-08-01 → 2013-08-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-09-01 → 2013-09-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-10-01 → 2013-10-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-11-01 → 2013-11-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2013-12-01 → 2013-12-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-01-01 → 2014-01-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-02-01 → 2014-02-28 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-03-01 → 2014-03-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-04-01 → 2014-04-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-05-01 → 2014-05-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-06-01 → 2014-06-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-07-01 → 2014-07-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-08-01 → 2014-08-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-09-01 → 2014-09-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-10-01 → 2014-10-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-11-01 → 2014-11-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2014-12-01 → 2014-12-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-01-01 → 2015-01-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-02-01 → 2015-02-28 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-03-01 → 2015-03-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-04-01 → 2015-04-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-05-01 → 2015-05-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-06-01 → 2015-06-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-07-01 → 2015-07-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-08-01 → 2015-08-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-09-01 → 2015-09-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-10-01 → 2015-10-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-11-01 → 2015-11-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2015-12-01 → 2015-12-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-01-01 → 2016-01-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-02-01 → 2016-02-29 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-03-01 → 2016-03-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-04-01 → 2016-04-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-05-01 → 2016-05-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-06-01 → 2016-06-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-07-01 → 2016-07-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-08-01 → 2016-08-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-09-01 → 2016-09-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-10-01 → 2016-10-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-11-01 → 2016-11-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2016-12-01 → 2016-12-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-01-01 → 2017-01-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-02-01 → 2017-02-28 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-03-01 → 2017-03-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-04-01 → 2017-04-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-05-01 → 2017-05-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-06-01 → 2017-06-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-07-01 → 2017-07-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-08-01 → 2017-08-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-09-01 → 2017-09-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-10-01 → 2017-10-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-11-01 → 2017-11-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2017-12-01 → 2017-12-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-01-01 → 2018-01-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-02-01 → 2018-02-28 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-03-01 → 2018-03-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-04-01 → 2018-04-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-05-01 → 2018-05-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-06-01 → 2018-06-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-09-01 → 2018-09-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-10-01 → 2018-10-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-11-01 → 2018-11-30 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
| 2018-12-01 → 2018-12-31 | revised | USD 0 | superseded, last seen 03 Oct 2026 |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2011-06-30 | Outgoing commitment | USD 2.80m | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Commitment in June Month of 2011 | new |
| 2011-06-30 | Outgoing commitment | USD 2.80m | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Commitment in June Month of 2011 | new |
| 2019-05-31 | Outgoing commitment | USD -1.13m | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Commitment Cancellations in May Month of 2019 | new |
| 2019-07-31 | Outgoing commitment | USD -1.24m | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Commitment Cancellations in July Month of 2019 | new |
| 2012-11-30 | Disbursement | USD 500k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in November Month of 2012 | new |
| 2013-01-31 | Disbursement | USD 500k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in January Month of 2013 | new |
| 2015-02-28 | Disbursement | USD 165k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in February Month of 2015 | new |
| 2015-02-28 | Disbursement | USD 165k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in February Month of 2015 | new |
| 2015-04-30 | Disbursement | USD 300k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in April Month of 2015 | new |
| 2015-04-30 | Disbursement | USD 300k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in April Month of 2015 | new |
| 2016-02-29 | Disbursement | USD 120k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in February Month of 2016 | new |
| 2016-03-31 | Disbursement | USD 200k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in March Month of 2016 | new |
| 2016-08-31 | Disbursement | USD 150k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in August Month of 2016 | new |
| 2016-12-31 | Disbursement | USD 25k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in December Month of 2016 | new |
| 2018-06-30 | Disbursement | USD 146k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in June Month of 2018 | new |
| 2018-08-31 | Disbursement | USD 438k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in August Month of 2018 | new |
| 2018-10-31 | Disbursement | USD 126k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in October Month of 2018 | new |
| 2018-12-31 | Disbursement | USD 58k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in December Month of 2018 | new |
| 2019-03-31 | Disbursement | USD -1,549 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in March Month of 2019 | new |
| 2019-04-30 | Disbursement | USD -20k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in April Month of 2019 | new |
| 2019-04-30 | Disbursement | USD -385k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in April Month of 2019 | new |
| 2019-06-30 | Disbursement | USD -54k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Disbursement in June Month of 2019 | new |
| 2013-05-31 | 5 | USD -791 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in May Month of 2013 | new |
| 2013-06-30 | 5 | USD -2,171 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2013 | new |
| 2013-10-31 | 5 | USD -6 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2013 | new |
| 2013-11-30 | 5 | USD -1,847 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in November Month of 2013 | new |
| 2013-12-31 | 5 | USD -1,904 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2013 | new |
| 2014-05-31 | 5 | USD -1,901 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in May Month of 2014 | new |
| 2014-06-30 | 5 | USD -1,908 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2014 | new |
| 2014-10-31 | 5 | USD -1,827 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2014 | new |
| 2014-12-31 | 5 | USD -1,795 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2014 | new |
| 2015-04-30 | 5 | USD -1,966 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2015 | new |
| 2015-06-30 | 5 | USD -2,459 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2015 | new |
| 2015-10-31 | 5 | USD -3,465 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2015 | new |
| 2015-12-31 | 5 | USD -3,523 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2015 | new |
| 2016-04-30 | 5 | USD -3,505 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2016 | new |
| 2016-06-30 | 5 | USD -3,765 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2016 | new |
| 2016-10-31 | 5 | USD -4,352 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2016 | new |
| 2016-12-31 | 5 | USD -3,770 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2016 | new |
| 2017-04-30 | 5 | USD -4,720 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2017 | new |
| 2017-06-30 | 5 | USD -3,914 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2017 | new |
| 2017-10-31 | 5 | USD -4,828 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2017 | new |
| 2017-12-31 | 5 | USD -4,146 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2017 | new |
| 2018-04-30 | 5 | USD -4,983 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2018 | new |
| 2018-06-30 | 5 | USD -4,070 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2018 | new |
| 2018-10-31 | 5 | USD -5,372 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2018 | new |
| 2018-12-31 | 5 | USD -4,568 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2018 | new |
| 2019-04-30 | 5 | USD -6,407 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2019 | new |
| 2019-06-30 | 5 | USD -5,255 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2019 | new |
| 2019-10-31 | 5 | USD -4,743 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2019 | new |
| 2019-12-31 | 5 | USD -5,078 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2019 | new |
| 2020-04-30 | 5 | USD -4,630 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2020 | new |
| 2020-06-30 | 5 | USD -5,112 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2020 | new |
| 2020-10-31 | 5 | USD -4,785 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2020 | new |
| 2020-12-31 | 5 | USD -5,295 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2020 | new |
| 2021-04-30 | 5 | USD -4,856 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2021 | new |
| 2021-06-30 | 5 | USD -5,391 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2021 | new |
| 2021-10-31 | 5 | USD -4,793 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2021 | new |
| 2021-12-31 | 5 | USD -5,213 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2021 | new |
| 2022-04-30 | 5 | USD -4,580 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2022 | new |
| 2022-06-30 | 5 | USD -4,873 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2022 | new |
| 2022-10-31 | 5 | USD -4,225 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2022 | new |
| 2022-12-31 | 5 | USD -3,909 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2022 | new |
| 2023-04-30 | 5 | USD -4,175 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2023 | new |
| 2023-06-30 | 5 | USD -5,696 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2023 | new |
| 2023-10-31 | 5 | USD -4,467 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2023 | new |
| 2023-12-31 | 5 | USD -4,230 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2023 | new |
| 2024-04-30 | 5 | USD -4,189 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2024 | new |
| 2024-06-30 | 5 | USD -5,038 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2024 | new |
| 2024-10-31 | 5 | USD -4,195 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2024 | new |
| 2024-12-31 | 5 | USD -4,513 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2024 | new |
| 2025-04-30 | 5 | USD -3,572 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2025 | new |
| 2025-06-30 | 5 | USD -4,449 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2025 | new |
| 2025-10-31 | 5 | USD -4,792 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2025 | new |
| 2025-12-31 | 5 | USD -4,650 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2025 | new |
| 2026-04-30 | 5 | USD -4,139 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2026 | new |
| 2026-06-30 | 5 | USD -4,571 | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2026 | new |
| 2021-10-31 | 6 | USD -16k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2021 | new |
| 2021-12-31 | 6 | USD -17k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2021 | new |
| 2022-04-30 | 6 | USD -15k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2022 | new |
| 2022-06-30 | 6 | USD -16k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2022 | new |
| 2022-10-31 | 6 | USD -14k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2022 | new |
| 2022-12-31 | 6 | USD -16k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2022 | new |
| 2023-04-30 | 6 | USD -15k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2023 | new |
| 2023-06-30 | 6 | USD -17k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2023 | new |
| 2023-10-31 | 6 | USD -15k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2023 | new |
| 2023-12-31 | 6 | USD -17k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2023 | new |
| 2024-04-30 | 6 | USD -15k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2024 | new |
| 2024-06-30 | 6 | USD -16k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2024 | new |
| 2024-10-31 | 6 | USD -15k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2024 | new |
| 2024-12-31 | 6 | USD -16k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2024 | new |
| 2025-04-30 | 6 | USD -15k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2025 | new |
| 2025-06-30 | 6 | USD -17k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2025 | new |
| 2025-10-31 | 6 | USD -15k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2025 | new |
| 2025-12-31 | 6 | USD -17k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2025 | new |
| 2026-04-30 | 6 | USD -16k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2026 | new |
| 2026-06-30 | 6 | USD -17k | Grenada Project Coordination Unit (PCU); Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2026 | new |
| 2011-06-30 | Outgoing commitment | USD 2.80m | Saint Lucia Project Coordination Unit | Total Commitment in June Month of 2011 | removed |
| 2011-06-30 | Outgoing commitment | USD 2.80m | Saint Lucia Project Coordination Unit | Total Commitment in June Month of 2011 | removed |
| 2019-05-31 | Outgoing commitment | USD -1.13m | Saint Lucia Project Coordination Unit | Total Commitment Cancellations in May Month of 2019 | removed |
| 2019-07-31 | Outgoing commitment | USD -1.24m | Saint Lucia Project Coordination Unit | Total Commitment Cancellations in July Month of 2019 | removed |
| 2012-11-30 | Disbursement | USD 500k | Saint Lucia Project Coordination Unit | Total Disbursement in November Month of 2012 | removed |
| 2013-01-31 | Disbursement | USD 500k | Saint Lucia Project Coordination Unit | Total Disbursement in January Month of 2013 | removed |
| 2015-02-28 | Disbursement | USD 165k | Saint Lucia Project Coordination Unit | Total Disbursement in February Month of 2015 | removed |
| 2015-02-28 | Disbursement | USD 165k | Saint Lucia Project Coordination Unit | Total Disbursement in February Month of 2015 | removed |
| 2015-04-30 | Disbursement | USD 300k | Saint Lucia Project Coordination Unit | Total Disbursement in April Month of 2015 | removed |
| 2015-04-30 | Disbursement | USD 300k | Saint Lucia Project Coordination Unit | Total Disbursement in April Month of 2015 | removed |
| 2016-02-29 | Disbursement | USD 120k | Saint Lucia Project Coordination Unit | Total Disbursement in February Month of 2016 | removed |
| 2016-03-31 | Disbursement | USD 200k | Saint Lucia Project Coordination Unit | Total Disbursement in March Month of 2016 | removed |
| 2016-08-31 | Disbursement | USD 150k | Saint Lucia Project Coordination Unit | Total Disbursement in August Month of 2016 | removed |
| 2016-12-31 | Disbursement | USD 25k | Saint Lucia Project Coordination Unit | Total Disbursement in December Month of 2016 | removed |
| 2018-06-30 | Disbursement | USD 146k | Saint Lucia Project Coordination Unit | Total Disbursement in June Month of 2018 | removed |
| 2018-08-31 | Disbursement | USD 438k | Saint Lucia Project Coordination Unit | Total Disbursement in August Month of 2018 | removed |
| 2018-10-31 | Disbursement | USD 126k | Saint Lucia Project Coordination Unit | Total Disbursement in October Month of 2018 | removed |
| 2018-12-31 | Disbursement | USD 58k | Saint Lucia Project Coordination Unit | Total Disbursement in December Month of 2018 | removed |
| 2019-03-31 | Disbursement | USD -1,549 | Saint Lucia Project Coordination Unit | Total Disbursement in March Month of 2019 | removed |
| 2019-04-30 | Disbursement | USD -385k | Saint Lucia Project Coordination Unit | Total Disbursement in April Month of 2019 | removed |
| 2019-04-30 | Disbursement | USD -20k | Saint Lucia Project Coordination Unit | Total Disbursement in April Month of 2019 | removed |
| 2019-06-30 | Disbursement | USD -54k | Saint Lucia Project Coordination Unit | Total Disbursement in June Month of 2019 | removed |
| 2013-05-31 | 5 | USD -791 | Saint Lucia Project Coordination Unit | Total Interest Repayment in May Month of 2013 | removed |
| 2013-06-30 | 5 | USD -2,171 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2013 | removed |
| 2013-10-31 | 5 | USD -6 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2013 | removed |
| 2013-11-30 | 5 | USD -1,847 | Saint Lucia Project Coordination Unit | Total Interest Repayment in November Month of 2013 | removed |
| 2013-12-31 | 5 | USD -1,904 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2013 | removed |
| 2014-05-31 | 5 | USD -1,901 | Saint Lucia Project Coordination Unit | Total Interest Repayment in May Month of 2014 | removed |
| 2014-06-30 | 5 | USD -1,908 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2014 | removed |
| 2014-10-31 | 5 | USD -1,827 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2014 | removed |
| 2014-12-31 | 5 | USD -1,795 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2014 | removed |
| 2015-04-30 | 5 | USD -1,966 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2015 | removed |
| 2015-06-30 | 5 | USD -2,459 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2015 | removed |
| 2015-10-31 | 5 | USD -3,465 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2015 | removed |
| 2015-12-31 | 5 | USD -3,523 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2015 | removed |
| 2016-04-30 | 5 | USD -3,505 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2016 | removed |
| 2016-06-30 | 5 | USD -3,765 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2016 | removed |
| 2016-10-31 | 5 | USD -4,352 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2016 | removed |
| 2016-12-31 | 5 | USD -3,770 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2016 | removed |
| 2017-04-30 | 5 | USD -4,720 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2017 | removed |
| 2017-06-30 | 5 | USD -3,914 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2017 | removed |
| 2017-10-31 | 5 | USD -4,828 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2017 | removed |
| 2017-12-31 | 5 | USD -4,146 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2017 | removed |
| 2018-04-30 | 5 | USD -4,983 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2018 | removed |
| 2018-06-30 | 5 | USD -4,070 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2018 | removed |
| 2018-10-31 | 5 | USD -5,372 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2018 | removed |
| 2018-12-31 | 5 | USD -4,568 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2018 | removed |
| 2019-04-30 | 5 | USD -6,407 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2019 | removed |
| 2019-06-30 | 5 | USD -5,255 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2019 | removed |
| 2019-10-31 | 5 | USD -4,743 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2019 | removed |
| 2019-12-31 | 5 | USD -5,078 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2019 | removed |
| 2020-04-30 | 5 | USD -4,630 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2020 | removed |
| 2020-06-30 | 5 | USD -5,112 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2020 | removed |
| 2020-10-31 | 5 | USD -4,785 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2020 | removed |
| 2020-12-31 | 5 | USD -5,295 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2020 | removed |
| 2021-04-30 | 5 | USD -4,856 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2021 | removed |
| 2021-06-30 | 5 | USD -5,391 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2021 | removed |
| 2021-10-31 | 5 | USD -4,793 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2021 | removed |
| 2021-12-31 | 5 | USD -5,213 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2021 | removed |
| 2022-04-30 | 5 | USD -4,580 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2022 | removed |
| 2022-06-30 | 5 | USD -4,873 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2022 | removed |
| 2022-10-31 | 5 | USD -4,225 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2022 | removed |
| 2022-12-31 | 5 | USD -3,909 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2022 | removed |
| 2023-04-30 | 5 | USD -4,175 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2023 | removed |
| 2023-06-30 | 5 | USD -5,696 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2023 | removed |
| 2023-10-31 | 5 | USD -4,467 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2023 | removed |
| 2023-12-31 | 5 | USD -4,230 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2023 | removed |
| 2024-04-30 | 5 | USD -4,189 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2024 | removed |
| 2024-06-30 | 5 | USD -5,038 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2024 | removed |
| 2024-10-31 | 5 | USD -4,195 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2024 | removed |
| 2024-12-31 | 5 | USD -4,513 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2024 | removed |
| 2025-04-30 | 5 | USD -3,572 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2025 | removed |
| 2025-06-30 | 5 | USD -4,449 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2025 | removed |
| 2025-10-31 | 5 | USD -4,792 | Saint Lucia Project Coordination Unit | Total Interest Repayment in October Month of 2025 | removed |
| 2025-12-31 | 5 | USD -4,650 | Saint Lucia Project Coordination Unit | Total Interest Repayment in December Month of 2025 | removed |
| 2026-04-30 | 5 | USD -4,139 | Saint Lucia Project Coordination Unit | Total Interest Repayment in April Month of 2026 | removed |
| 2026-06-30 | 5 | USD -4,571 | Saint Lucia Project Coordination Unit | Total Interest Repayment in June Month of 2026 | removed |
| 2021-10-31 | 6 | USD -16k | Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2021 | removed |
| 2021-12-31 | 6 | USD -17k | Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2021 | removed |
| 2022-04-30 | 6 | USD -15k | Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2022 | removed |
| 2022-06-30 | 6 | USD -16k | Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2022 | removed |
| 2022-10-31 | 6 | USD -14k | Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2022 | removed |
| 2022-12-31 | 6 | USD -16k | Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2022 | removed |
| 2023-04-30 | 6 | USD -15k | Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2023 | removed |
| 2023-06-30 | 6 | USD -17k | Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2023 | removed |
| 2023-10-31 | 6 | USD -15k | Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2023 | removed |
| 2023-12-31 | 6 | USD -17k | Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2023 | removed |
| 2024-04-30 | 6 | USD -15k | Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2024 | removed |
| 2024-06-30 | 6 | USD -16k | Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2024 | removed |
| 2024-10-31 | 6 | USD -15k | Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2024 | removed |
| 2024-12-31 | 6 | USD -16k | Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2024 | removed |
| 2025-04-30 | 6 | USD -15k | Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2025 | removed |
| 2025-06-30 | 6 | USD -17k | Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2025 | removed |
| 2025-10-31 | 6 | USD -15k | Saint Lucia Project Coordination Unit | Total Loan Repayment in October Month of 2025 | removed |
| 2025-12-31 | 6 | USD -17k | Saint Lucia Project Coordination Unit | Total Loan Repayment in December Month of 2025 | removed |
| 2026-04-30 | 6 | USD -16k | Saint Lucia Project Coordination Unit | Total Loan Repayment in April Month of 2026 | removed |
| 2026-06-30 | 6 | USD -17k | Saint Lucia Project Coordination Unit | Total Loan Repayment in June Month of 2026 | removed |
Struck-through rows were in the previous version, last seen 2026-10-03 02:42 UTC, and are not in the current file.