United Nations Children's Fund (UNICEF) / unicef-bangladesh
OUTPUT 7.5: PROGRAMME COORDINATION AND PMR
XM-DAC-41122-Bangladesh-5070/A0/06/880/005
USD 53.27mdeclared budget
USD 10.75mdisbursed and spent, 163 of 535 transactions
Pipelinestatus
31 Dec 2027planned end, was 31 Dec 2026
Budget over time
- Reporting organisation
- UNICEF
- Start
- 01 Jan 2022
- Countries
- Bangladesh 100%
- Sectors
- 55-12-03 · publisher's own 37.5%; 55-01-03 · publisher's own 62.5%; Relief co-ordination and support services (72050) 62.5%; Administrative costs (non-sector allocable) (91010) 37.5%; 17 · SDG goal 100%
- Funded by
- Bangladesh; European Commission / ECHO; Bureau for Humanitarian Assistance; SIDA - Sweden; Austrian Committee for UNICEF; Norwegian Committee for UNICEF and 47 more
- Participating
- Bangladesh (funding); European Commission / ECHO (funding); Bureau for Humanitarian Assistance (funding); SIDA - Sweden (funding); Austrian Committee for UNICEF (funding); Norwegian Committee for UNICEF (funding); CIVIL SURGEON BANDARBAN (implementing); USAID/Food for Peace (funding) and 50 more
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-09-28 02:30 UTC
Changes
- 2026-09-28Budget changed+6 more
For UNICEF's "OUTPUT 7.5: PROGRAMME COORDINATION AND PMR", the budget increased by 59.70% to USD 53,267,440.00, the planned end date was extended to 2027-12-31, and transactions were restated, as part of a bulk correction of 28 projects.
- Budget changed: Budget USD 33.36m → USD 53.27m (+59.7%)
- Dates changed: planned end 2026-12-31 → 2027-12-31
- Transaction rewritten: 15 transactions restated as of 2026-08-31: total USD 96,823,992 → USD 90,673,395 (-6.4%)
- Transaction rewritten: 112 transactions re-dated (2026-07-31 → 2026-08-31), USD 35,366,553 unchanged
- Transactions added: 8 transactions added, USD 180k
- Organisations changed: 3 organisation(s) removed, 3 added
- Title changed: Title was “This activity will contribute to achieving results for the O”
OUTPUT 7.5: PROGRAMME COORDINATION AND PMR · compare ec61b578 → 7300da63
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2026-01-01 → 2026-12-31 | revised, indicative | USD 1.65m | current |
| 2025-01-01 → 2025-12-31 | revised, indicative | USD 9.95m | current |
| 2027-01-01 → 2027-12-31 | revised, indicative | USD 9.95m | new since 27 Sept 2026 |
| 2022-01-01 → 2022-12-31 | revised, indicative | USD 1.48m | current |
| 2023-01-01 → 2023-12-31 | revised, indicative | USD 1.48m | current |
| 2024-01-01 → 2024-12-31 | revised, indicative | USD 2.12m | current |
| 2026-01-01 → 2026-03-31 | revised, indicative | USD 413k | current |
| 2025-01-01 → 2025-03-31 | revised, indicative | USD 2.49m | current |
| 2027-01-01 → 2027-03-31 | revised, indicative | USD 2.49m | new since 27 Sept 2026 |
| 2022-01-01 → 2022-03-31 | revised, indicative | USD 370k | current |
| 2023-01-01 → 2023-03-31 | revised, indicative | USD 370k | current |
| 2024-01-01 → 2024-03-31 | revised, indicative | USD 531k | current |
| 2026-04-01 → 2026-06-30 | revised, indicative | USD 413k | current |
| 2025-04-01 → 2025-06-30 | revised, indicative | USD 2.49m | current |
| 2027-04-01 → 2027-06-30 | revised, indicative | USD 2.49m | new since 27 Sept 2026 |
| 2022-04-01 → 2022-06-30 | revised, indicative | USD 370k | current |
| 2023-04-01 → 2023-06-30 | revised, indicative | USD 370k | current |
| 2024-04-01 → 2024-06-30 | revised, indicative | USD 531k | current |
| 2026-07-01 → 2026-09-30 | revised, indicative | USD 413k | current |
| 2025-07-01 → 2025-09-30 | revised, indicative | USD 2.49m | current |
| 2027-07-01 → 2027-09-30 | revised, indicative | USD 2.49m | new since 27 Sept 2026 |
| 2022-07-01 → 2022-09-30 | revised, indicative | USD 370k | current |
| 2023-07-01 → 2023-09-30 | revised, indicative | USD 370k | current |
| 2024-07-01 → 2024-09-30 | revised, indicative | USD 531k | current |
| 2026-10-01 → 2026-12-31 | revised, indicative | USD 413k | current |
| 2025-10-01 → 2025-12-31 | revised, indicative | USD 2.49m | current |
| 2027-10-01 → 2027-12-31 | revised, indicative | USD 2.49m | new since 27 Sept 2026 |
| 2022-10-01 → 2022-12-31 | revised, indicative | USD 370k | current |
| 2023-10-01 → 2023-12-31 | revised, indicative | USD 370k | current |
| 2024-10-01 → 2024-12-31 | revised, indicative | USD 531k | current |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2026-03-31 | Expenditure | USD 57k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-08-31 | Expenditure | USD 52k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new | |
| 2025-04-30 | Expenditure | USD 12k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-08-31 | Expenditure | USD 39k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-09-30 | Expenditure | USD 4,960 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-04-30 | Expenditure | USD 1,982 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-08-31 | Expenditure | USD 12k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-12-31 | Expenditure | USD 269 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2022-12-31 | Expenditure | USD 110k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-10-31 | Expenditure | USD 23k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-08-31 | Expenditure | USD 67k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new | |
| 2025-12-31 | Expenditure | USD 32k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-03-31 | Expenditure | USD 2,930 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-05-31 | Expenditure | USD 11k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-04-30 | Expenditure | USD 33k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-03-31 | Expenditure | USD 15k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-03-31 | Expenditure | USD 52k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 19k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-07-31 | Expenditure | USD 9,083 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-09-30 | Expenditure | USD 42k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-09-30 | Expenditure | USD 12k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-02-28 | Expenditure | USD 53k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-10-31 | Expenditure | USD 57k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-02-28 | Expenditure | USD 31k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-07-31 | Expenditure | USD 60k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-03-31 | Expenditure | USD 796 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-12-31 | Expenditure | USD -6 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 30 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD 97k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2023-12-31 | Expenditure | USD 1.54m | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2022-12-31 | Expenditure | USD 159k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2023-12-31 | Expenditure | USD 105k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2022-12-31 | Expenditure | USD 602k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD -30 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD 9,199 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 60k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-12-31 | Expenditure | USD 10k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-11-30 | Expenditure | USD 15k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-02-28 | Expenditure | USD 47k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-04-30 | Expenditure | USD 2,184 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-07-31 | Expenditure | USD 18k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 41k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-06-30 | Expenditure | USD 49k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-07-31 | Expenditure | USD 1,205 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-05-31 | Expenditure | USD 49k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-07-31 | Expenditure | USD 14k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-06-30 | Expenditure | USD 49k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-06-30 | Expenditure | USD 7,608 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-10-31 | Expenditure | USD 4,411 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-07-31 | Expenditure | USD 1,346 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-06-30 | Expenditure | USD 5,583 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-08-31 | Expenditure | USD 9,083 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new | |
| 2026-06-30 | Expenditure | USD 12k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-02-28 | Expenditure | USD 43 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-06-30 | Expenditure | USD 2,112 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2022-12-31 | Expenditure | USD 304k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD 183k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-06-30 | Expenditure | USD 9,126 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-02-28 | Expenditure | USD 39k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-09-30 | Expenditure | USD 29k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-07-31 | Expenditure | USD 44k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-08-31 | Expenditure | USD 426 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-11-30 | Expenditure | USD 4,411 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-10-31 | Expenditure | USD 5,287 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-03-31 | Expenditure | USD 7,938 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-03-31 | Expenditure | USD 25k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-10-31 | Expenditure | USD 3,399 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD 908k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD 177k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2023-12-31 | Expenditure | USD 590k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 2,096 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 30k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-05-31 | Expenditure | USD 66k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-09-30 | Expenditure | USD 263 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-06-30 | Expenditure | USD 40k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-04-30 | Expenditure | USD 23k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-07-31 | Expenditure | USD 39k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-02-28 | Expenditure | USD 19k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-05-31 | Expenditure | USD 23k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-08-31 | Expenditure | USD 15k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 15 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-12-31 | Expenditure | USD 497 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 88 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2023-12-31 | Expenditure | USD 41k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2022-12-31 | Expenditure | USD 87k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD 4,722 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2023-12-31 | Expenditure | USD 1,153 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-05-31 | Expenditure | USD 51k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-07-31 | Expenditure | USD 9,391 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-08-31 | Expenditure | USD 5,058 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new | |
| 2025-08-31 | Expenditure | USD 16k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-05-31 | Expenditure | USD 31k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-09-30 | Expenditure | USD 26k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-12-31 | Expenditure | USD 203 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-02-28 | Expenditure | USD 508 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-06-30 | Expenditure | USD 23k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 38k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-05-31 | Expenditure | USD 12k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-04-30 | Expenditure | USD 49k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-04-30 | Expenditure | USD 39k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 31k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-09-30 | Expenditure | USD 18k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-12-31 | Expenditure | USD 69k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-08-31 | Expenditure | USD 2,095 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new | |
| 2026-04-30 | Expenditure | USD -501 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 6 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-05-31 | Expenditure | USD 256 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-06-30 | Expenditure | USD 14k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 36k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-03-31 | Expenditure | USD 59k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-04-30 | Expenditure | USD 89k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-02-28 | Expenditure | USD 53k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-06-30 | Expenditure | USD 80k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-04-30 | Expenditure | USD 5,845 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-08-31 | Expenditure | USD 45k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-03-31 | Expenditure | USD 8,257 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-08-31 | Expenditure | USD 21k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new | |
| 2022-12-31 | Expenditure | USD 52k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2022-12-31 | Expenditure | USD 1,449 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-05-31 | Expenditure | USD 3,493 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-02-28 | Expenditure | USD 38k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-08-31 | Expenditure | USD 7,400 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-07-31 | Expenditure | USD 20k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-03-31 | Expenditure | USD 23k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 10k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-03-31 | Expenditure | USD 40k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-04-30 | Expenditure | USD 18k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 666 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-11-30 | Expenditure | USD 53k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 7 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-02-28 | Expenditure | USD 3,985 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-09-30 | Expenditure | USD 445 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-01-31 | Expenditure | USD 602 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2023-12-31 | Expenditure | USD 208k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2022-12-31 | Expenditure | USD 1.43m | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD 371k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-11-30 | Expenditure | USD 28k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-07-31 | Expenditure | USD 63k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-07-31 | Expenditure | USD 63k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 51k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-12-31 | Expenditure | USD 4,411 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-05-31 | Expenditure | USD 7,573 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-07-31 | Expenditure | USD 7,451 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-07-31 | Expenditure | USD 11k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-05-31 | Expenditure | USD 38k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-08-31 | Expenditure | USD 15k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new | |
| 2026-01-31 | Expenditure | USD 222 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-01-31 | Expenditure | USD 16 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-12-31 | Expenditure | USD -16 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-03-31 | Expenditure | USD 635 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD 534k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2023-12-31 | Expenditure | USD 143k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2024-12-31 | Expenditure | USD -88 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-05-31 | Expenditure | USD 6,955 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-02-28 | Expenditure | USD 2,096 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-04-30 | Expenditure | USD 53k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-02-28 | Expenditure | USD 29k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2026-08-31 | Expenditure | USD 9,391 | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new | |
| 2026-06-30 | Expenditure | USD 61k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-10-31 | Expenditure | USD 18k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-03-31 | Expenditure | USD 43k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2025-05-31 | Expenditure | USD 20k | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | ||
| 2023-12-31 | Incoming commitment | USD 1.07m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 1,129 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 14k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2024-12-31 | Incoming commitment | USD 1,284 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 6,688 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 44k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 180k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2025-12-31 | Incoming commitment | USD 118k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 9 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 2,750 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2024-12-31 | Incoming commitment | USD 37k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 16k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 17k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 50k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 338k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 40k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 5,298 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2025-12-31 | Incoming commitment | USD 36k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 28k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 28k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 170k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2023-12-31 | Incoming commitment | USD 437 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 36k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2023-12-31 | Incoming commitment | USD 41k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 16k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 143k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 160k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 7,846 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 7.73m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 84k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2024-12-31 | Incoming commitment | USD 544k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 16k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 195k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 21k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2023-12-31 | Incoming commitment | USD 9,804 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 533 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 296k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 1.28m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2023-12-31 | Incoming commitment | USD 589k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 13k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 95k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 14k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 1 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 1,148 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 5.03m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2023-12-31 | Incoming commitment | USD 9,334 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 1 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 615k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 46k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2024-12-31 | Incoming commitment | USD 6,600 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 19k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 8,404 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 8,121 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 14k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 73 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 237k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 297k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2023-12-31 | Incoming commitment | USD 7,051 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 24k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 59k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2023-12-31 | Incoming commitment | USD 131k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 530k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 103k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 1,032 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 323 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 4 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 79k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 26k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 31k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 83k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 3,005 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 27k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2023-12-31 | Incoming commitment | USD 39k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 42k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 19k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2025-12-31 | Incoming commitment | USD 133 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 72k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 50k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 801 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 624 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 1,325 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 30k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 2 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 84k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 500k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2024-12-31 | Incoming commitment | USD 7,652 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 3,205 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2024-12-31 | Incoming commitment | USD 242k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 196k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 6,093 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 1.07m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 29k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 23.35m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2024-12-31 | Incoming commitment | USD 97 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 79k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 13 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-08-31 | Incoming commitment | USD 11k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 12k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 37k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 50k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 142 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 42k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 14k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 7,191 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 13k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 749k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 40k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2025-12-31 | Incoming commitment | USD 161k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 106k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 361k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 598k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Incoming commitment | USD 59k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Incoming commitment | USD 602k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 70k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Incoming commitment | USD 26k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 44k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 32k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Outgoing commitment | USD 14k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Outgoing commitment | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2024-12-31 | Outgoing commitment | USD 1,284 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Outgoing commitment | USD 6,688 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Outgoing commitment | USD 44k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Outgoing commitment | USD 180k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2025-12-31 | Outgoing commitment | USD 118k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Outgoing commitment | USD 9 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 587 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Outgoing commitment | USD 37k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Outgoing commitment | USD 2,750 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2022-12-31 | Outgoing commitment | USD 16k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Incoming commitment | USD 45k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2025-12-31 | Outgoing commitment | USD 17k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2022-12-31 | Incoming commitment | USD 1,769 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2024-12-31 | Incoming commitment | USD 853k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2023-12-31 | Outgoing commitment | USD 50k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | |
| 2026-08-31 | Outgoing commitment | USD 5,298 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | new |
| 2026-07-31 | Incoming commitment | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 2,750 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 180k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 5,298 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 21k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 170k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 36k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 28k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 143k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 195k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 19k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 84k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 7.73m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 1.28m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 8,404 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 5.12m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 220k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 24k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 46k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 1 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 588k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 500k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 297k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 59k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 14k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 13k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 13 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 27k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 72k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 40k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 59k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 79k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 237k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 19k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 84k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 1.07m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 11k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 6,093 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 196k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 25.28m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 2,750 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 180k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming commitment | USD 3,205 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 21k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 5,298 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 28k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 143k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 170k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 36k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 19k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 195k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 5.12m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 220k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 84k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 7.73m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 1.28m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 8,404 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 1 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 588k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 46k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 500k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 297k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 14k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 24k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 59k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 72k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 40k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 59k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 79k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 13k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 27k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 13 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 19k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 84k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 237k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 196k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 25.28m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 6,093 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 1.07m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 11k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 59k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 500k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 59k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Outgoing commitment | USD 3,205 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 19k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 84k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 11k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 220k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 170k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 237k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 1 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 5,298 | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 51k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 180k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 143k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 1.28m | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |
| 2026-07-31 | Incoming funds | USD 195k | UNICEF | OUTPUT 7.5: PROGRAMME COORDINATION AND PMR | removed |