United Nations Children's Fund (UNICEF) / unicef-jordan
TECHNICAL ASSISTANCE (STAFFING COST)
XM-DAC-41122-Jordan-2340/A0/06/883/004
USD 12.15mdeclared budget
USD 3.69mdisbursed and spent, 64 of 172 transactions
Implementationstatus
31 Dec 2027planned end
Budget over time
- Reporting organisation
- UNICEF
- Start
- 01 Jan 2023
- Countries
- Jordan 100%
- Sectors
- 53-01-96 · publisher's own 100%; Ending violence against women and girls (15180) 100%; 16 · SDG goal 100%
- Funded by
- Luxembourg; Netherlands Committee for UNICEF; Committee for UNICEF Switzerland; Republic of Korea; France; KfW - Germany and 12 more
- Participating
- Luxembourg (funding); Netherlands Committee for UNICEF (funding); Committee for UNICEF Switzerland (funding); JORDAN RIVER FOUNDATION (implementing); Republic of Korea (funding); France (funding); KfW - Germany (funding); UNICEF (implementing) and 15 more
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-09-28 02:30 UTC
Changes
- 2026-09-28Transaction rewritten+4 more
For project "TECHNICAL ASSISTANCE (STAFFING COST)", transaction totals increased by USD 210,459 to USD 324,333 and dates shifted from July 31, 2026 to August 31, 2026, alongside three new transactions totaling USD 81,245, three organizations being replaced, and a title update, likely as part of a bulk correction of 23
- Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 113,874 → USD 324,333 (+184.8%)
- Transaction rewritten: 34 transactions re-dated (2026-07-31 → 2026-08-31), USD 2,542,296 unchanged
- Transactions added: 3 transactions added, USD 81k
- Organisations changed: 3 organisation(s) removed, 3 added
- Title changed: Title was “This activity will contribute to achieving results for the T”
TECHNICAL ASSISTANCE (STAFFING COST) · compare 6687c366 → 8211f0ac
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2024-01-01 → 2024-12-31 | revised, indicative | USD 1.41m | current |
| 2025-01-01 → 2025-12-31 | revised, indicative | USD 1.17m | current |
| 2026-01-01 → 2026-12-31 | revised, indicative | USD 1.21m | current |
| 2027-01-01 → 2027-12-31 | revised, indicative | USD 1.22m | current |
| 2023-01-01 → 2023-12-31 | revised, indicative | USD 1.06m | current |
| 2024-01-01 → 2024-03-31 | revised, indicative | USD 354k | current |
| 2025-01-01 → 2025-03-31 | revised, indicative | USD 292k | current |
| 2026-01-01 → 2026-03-31 | revised, indicative | USD 303k | current |
| 2027-01-01 → 2027-03-31 | revised, indicative | USD 304k | current |
| 2023-01-01 → 2023-03-31 | revised, indicative | USD 266k | current |
| 2024-04-01 → 2024-06-30 | revised, indicative | USD 354k | current |
| 2025-04-01 → 2025-06-30 | revised, indicative | USD 292k | current |
| 2026-04-01 → 2026-06-30 | revised, indicative | USD 303k | current |
| 2027-04-01 → 2027-06-30 | revised, indicative | USD 304k | current |
| 2023-04-01 → 2023-06-30 | revised, indicative | USD 266k | current |
| 2024-07-01 → 2024-09-30 | revised, indicative | USD 354k | current |
| 2025-07-01 → 2025-09-30 | revised, indicative | USD 292k | current |
| 2026-07-01 → 2026-09-30 | revised, indicative | USD 303k | current |
| 2027-07-01 → 2027-09-30 | revised, indicative | USD 304k | current |
| 2023-07-01 → 2023-09-30 | revised, indicative | USD 266k | current |
| 2024-10-01 → 2024-12-31 | revised, indicative | USD 354k | current |
| 2025-10-01 → 2025-12-31 | revised, indicative | USD 292k | current |
| 2026-10-01 → 2026-12-31 | revised, indicative | USD 303k | current |
| 2027-10-01 → 2027-12-31 | revised, indicative | USD 304k | current |
| 2023-10-01 → 2023-12-31 | revised, indicative | USD 266k | current |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2023-12-31 | Expenditure | USD 571k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 5 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-04-30 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-02-28 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-03-31 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-05-31 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-04-30 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 43k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 577k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-08-31 | Expenditure | USD 31k | TECHNICAL ASSISTANCE (STAFFING COST) | new | |
| 2026-05-31 | Expenditure | USD 59k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-01-31 | Expenditure | USD 6,313 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-04-30 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-05-31 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-08-31 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2023-12-31 | Expenditure | USD 164k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-03-31 | Expenditure | USD 67k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-02-28 | Expenditure | USD 40k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-03-31 | Expenditure | USD 16k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-10-31 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-02-28 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2023-12-31 | Expenditure | USD 303k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-06-30 | Expenditure | USD 54k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-03-31 | Expenditure | USD 2,527 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-04-30 | Expenditure | USD 47k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-04-30 | Expenditure | USD 70k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-01-31 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-05-31 | Expenditure | USD 13k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 114k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-12-31 | Expenditure | USD 38k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-08-31 | Expenditure | USD 31k | TECHNICAL ASSISTANCE (STAFFING COST) | new | |
| 2025-03-31 | Expenditure | USD 43k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-02-28 | Expenditure | USD 14k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-01-31 | Expenditure | USD 50k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-08-31 | Expenditure | USD 13k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-07-31 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-09-30 | Expenditure | USD 45k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-08-31 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | new | |
| 2025-06-30 | Expenditure | USD 64k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-02-28 | Expenditure | USD 50k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-12-31 | Expenditure | USD 7,576 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-06-30 | Expenditure | USD 8,707 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-09-30 | Expenditure | USD 13k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-07-31 | Expenditure | USD 6,535 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-02-28 | Expenditure | USD 25k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-03-31 | Expenditure | USD 5,502 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 317k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2023-12-31 | Expenditure | USD 11k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-07-31 | Expenditure | USD 56k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-03-31 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-07-31 | Expenditure | USD 58k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-11-30 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-05-31 | Expenditure | USD 53k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-07-31 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-05-31 | Expenditure | USD 3,703 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-12-31 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-11-30 | Expenditure | USD 58k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-08-31 | Expenditure | USD 35k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-01-31 | Expenditure | USD 79k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-06-30 | Expenditure | USD 18k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-10-31 | Expenditure | USD 58k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-09-30 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-06-30 | Expenditure | USD 19k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Incoming commitment | USD 31k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 34k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 6,124 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming commitment | USD 199k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming commitment | USD 154k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 24k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 186k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 9,565 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming commitment | USD 17 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming commitment | USD 9,983 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 131k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming commitment | USD 91k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming commitment | USD 62k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 4,089 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming commitment | USD 41k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming commitment | USD 157k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 61k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 17k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming commitment | USD 122k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming commitment | USD 358k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 50k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 7,500 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming commitment | USD 35k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 334k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 10k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 205k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 366k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming commitment | USD 22k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 7,015 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 109k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 15k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming commitment | USD 529k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 31k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 34k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 146k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming commitment | USD 164k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 6,124 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Outgoing commitment | USD 199k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 154k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 24k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 9,565 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Outgoing commitment | USD 9,983 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 17 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Outgoing commitment | USD 186k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 131k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Outgoing commitment | USD 91k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Outgoing commitment | USD 62k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 4,089 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Outgoing commitment | USD 41k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Outgoing commitment | USD 157k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 61k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 17k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Outgoing commitment | USD 358k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 122k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Outgoing commitment | USD 50k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 7,500 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Outgoing commitment | USD 35k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 334k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 10k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 205k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 366k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Outgoing commitment | USD 7,015 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 109k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 15k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Outgoing commitment | USD 529k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 24k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 34k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 22k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 146k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Outgoing commitment | USD 164k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 109k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 131k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming funds | USD 366k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming funds | USD 50k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 41k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming funds | USD 4,089 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming funds | USD 205k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming funds | USD 529k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 31k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 7,500 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming funds | USD 122k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming funds | USD 146k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming funds | USD 164k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 154k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming funds | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 15k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming funds | USD 7,015 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 17k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming funds | USD 9,983 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 17 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming funds | USD 10k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 334k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 358k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 157k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 9,565 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming funds | USD 6,124 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming funds | USD 199k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 61k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 62k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 22k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Disbursement | USD 0 | TECHNICAL ASSISTANCE (STAFFING COST) | new | |
| 2025-12-31 | Incoming funds | USD 35k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 91k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming funds | USD 186k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-07-31 | Incoming commitment | USD 6,124 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 17 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 9,565 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 21k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 131k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 4,089 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 122k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 41k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 7,500 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 17k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 15k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 146k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 366k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 6,124 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 17 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 9,565 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 4,089 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 21k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 131k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 41k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 122k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 17k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 7,500 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 15k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 366k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 146k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 41k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 4,089 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 366k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 131k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 146k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 17k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 7,500 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 122k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 15k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 17 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 21k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 9,565 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Disbursement | USD 0 | TECHNICAL ASSISTANCE (STAFFING COST) | removed | |
| 2026-07-31 | Incoming funds | USD 6,124 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
Struck-through rows were in the previous version, last seen 2026-09-27 04:26 UTC, and are not in the current file.