United Nations Children's Fund (UNICEF) / unicef-jordan
TECHNICAL ASSISTANCE (STAFFING COST)
XM-DAC-41122-Jordan-2340/A0/06/885/004
USD 12.10mdeclared budget
USD 4.07mdisbursed and spent, 38 of 149 transactions
Implementationstatus
31 Dec 2027planned end
Budget over time
- Reporting organisation
- UNICEF
- Start
- 01 Jan 2023
- Countries
- Jordan 100%
- Sectors
- 50-09-98 · publisher's own 100%; Basic drinking water supply and basic sanitation (14030) 100%; 6 · SDG goal 100%
- Funded by
- SAFE AND HEALTHY ENVIRONMENT; Global - Thematic Humanitarian Resp; European Commission / ECHO; Republic of Korea; Netherlands; Japan and 11 more
- Participating
- SAFE AND HEALTHY ENVIRONMENT (funding); Global - Thematic Humanitarian Resp (funding); JORDAN RIVER FOUNDATION (implementing); European Commission / ECHO (funding); Republic of Korea (funding); Netherlands (funding); Japan (funding); Switzerland (funding) and 14 more
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-09-28 02:30 UTC
Changes
- 2026-09-28Transactions removed+5 more
For project "TECHNICAL ASSISTANCE (STAFFING COST)", transactions totaling USD 1,319,982.00 were restated, USD 179,295.00 was removed, USD 32,019.00 was added, transaction dates were moved from 2026-07-31 to 2026-08-31, and organizations and the title were
- Transactions removed: 3 transactions removed, USD 179k
- Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 635,901 → USD 821,436 (+29.2%)
- Transaction rewritten: 16 transactions re-dated (2026-07-31 → 2026-08-31), USD 1,319,982 unchanged
- Transactions added: 3 transactions added, USD 32k
- Organisations changed: 3 organisation(s) removed, 3 added
- Title changed: Title was “This activity will contribute to achieving results for the T”
TECHNICAL ASSISTANCE (STAFFING COST) · compare 6687c366 → 8211f0ac
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2023-01-01 → 2023-12-31 | revised, indicative | USD 1.27m | current |
| 2025-01-01 → 2025-12-31 | revised, indicative | USD 1.24m | current |
| 2026-01-01 → 2026-12-31 | revised, indicative | USD 1.28m | current |
| 2027-01-01 → 2027-12-31 | revised, indicative | USD 1.29m | current |
| 2024-01-01 → 2024-12-31 | revised, indicative | USD 979k | current |
| 2023-01-01 → 2023-03-31 | revised, indicative | USD 317k | current |
| 2025-01-01 → 2025-03-31 | revised, indicative | USD 309k | current |
| 2026-01-01 → 2026-03-31 | revised, indicative | USD 320k | current |
| 2027-01-01 → 2027-03-31 | revised, indicative | USD 322k | current |
| 2024-01-01 → 2024-03-31 | revised, indicative | USD 245k | current |
| 2023-04-01 → 2023-06-30 | revised, indicative | USD 317k | current |
| 2025-04-01 → 2025-06-30 | revised, indicative | USD 309k | current |
| 2026-04-01 → 2026-06-30 | revised, indicative | USD 320k | current |
| 2027-04-01 → 2027-06-30 | revised, indicative | USD 322k | current |
| 2024-04-01 → 2024-06-30 | revised, indicative | USD 245k | current |
| 2023-07-01 → 2023-09-30 | revised, indicative | USD 317k | current |
| 2025-07-01 → 2025-09-30 | revised, indicative | USD 309k | current |
| 2026-07-01 → 2026-09-30 | revised, indicative | USD 320k | current |
| 2027-07-01 → 2027-09-30 | revised, indicative | USD 322k | current |
| 2024-07-01 → 2024-09-30 | revised, indicative | USD 245k | current |
| 2023-10-01 → 2023-12-31 | revised, indicative | USD 317k | current |
| 2025-10-01 → 2025-12-31 | revised, indicative | USD 309k | current |
| 2026-10-01 → 2026-12-31 | revised, indicative | USD 320k | current |
| 2027-10-01 → 2027-12-31 | revised, indicative | USD 322k | current |
| 2024-10-01 → 2024-12-31 | revised, indicative | USD 245k | current |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2025-11-30 | Expenditure | USD 42k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-03-31 | Expenditure | USD 20k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-06-30 | Expenditure | USD 121k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-12-31 | Expenditure | USD 68k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-03-31 | Expenditure | USD -30k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2023-12-31 | Expenditure | USD 1.03m | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-10-31 | Expenditure | USD 9,922 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-11-30 | Expenditure | USD 50k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-02-28 | Expenditure | USD 22k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-08-31 | Expenditure | USD 17k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-12-31 | Expenditure | USD 13k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-04-30 | Expenditure | USD 44k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-01-31 | Expenditure | USD 73k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-02-28 | Expenditure | USD 20k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2023-12-31 | Expenditure | USD 30k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-09-30 | Expenditure | USD 15k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-07-31 | Expenditure | USD 84k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-04-30 | Expenditure | USD 17k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-05-31 | Expenditure | USD 75k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-10-31 | Expenditure | USD 191k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-06-30 | Expenditure | USD 23k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-08-31 | Expenditure | USD 119k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-03-31 | Expenditure | USD 326k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-03-31 | Expenditure | USD 98k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-02-28 | Expenditure | USD 30k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 252k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-05-31 | Expenditure | USD 17k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-01-31 | Expenditure | USD 17k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-07-31 | Expenditure | USD 9,922 | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-12-31 | Expenditure | USD 64k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2023-12-31 | Expenditure | USD 136k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 42k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 45k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-09-30 | Expenditure | USD 100k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2026-02-28 | Expenditure | USD 73k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2025-04-30 | Expenditure | USD 140k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Expenditure | USD 672k | TECHNICAL ASSISTANCE (STAFFING COST) | ||
| 2024-12-31 | Incoming commitment | USD 59k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 52k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 168k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming commitment | USD 78k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming commitment | USD 40k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming commitment | USD 29k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 39k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 47k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming commitment | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming commitment | USD 118k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming commitment | USD 416k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 21k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 8,921 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming commitment | USD 67k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 53k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming commitment | USD 42k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 9,553 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 40k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming commitment | USD 111k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming commitment | USD 47k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 227k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming commitment | USD 94k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 11k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming commitment | USD 29k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 851k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 80k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 38k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 101k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming commitment | USD 988k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming commitment | USD 8,956 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 9,936 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 1 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 59k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming commitment | USD 87k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming commitment | USD 55k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Incoming commitment | USD 31k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming commitment | USD 24k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 52k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 168k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Outgoing commitment | USD 78k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 40k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 29k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 39k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 47k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Outgoing commitment | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Outgoing commitment | USD 118k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 416k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 21k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 8,921 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Outgoing commitment | USD 53k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 67k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 42k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 40k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 111k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 9,553 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 29k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 94k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 47k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 851k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 80k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 38k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 101k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Outgoing commitment | USD 11k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Outgoing commitment | USD 988k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 1 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 9,936 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Outgoing commitment | USD 227k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming funds | USD 111k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 52k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 101k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Outgoing commitment | USD 55k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2025-12-31 | Outgoing commitment | USD 31k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Outgoing commitment | USD 8,956 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Outgoing commitment | USD 24k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Outgoing commitment | USD 87k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 47k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming funds | USD 29k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 55k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming funds | USD 227k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2026-08-31 | Incoming funds | USD 11k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming funds | USD 78k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 80k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming funds | USD 39k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming funds | USD 851k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 42k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 1 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 87k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming funds | USD 38k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming funds | USD 40k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 31k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 416k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2024-12-31 | Incoming funds | USD 118k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 59k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 67k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 47k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 9,936 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Incoming funds | USD 168k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | new |
| 2023-12-31 | Incoming funds | USD 40k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 9,553 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 94k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 988k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2025-12-31 | Incoming funds | USD 53k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 8,956 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-08-31 | Disbursement | USD 0 | TECHNICAL ASSISTANCE (STAFFING COST) | new | |
| 2025-12-31 | Incoming funds | USD 21k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming funds | USD 8,921 | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2023-12-31 | Incoming funds | USD 24k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2024-12-31 | Incoming funds | USD 29k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | |
| 2026-07-31 | Incoming commitment | USD 168k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 54k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 60k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 158k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 101k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming commitment | USD 55k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 168k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 54k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 60k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 158k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 101k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 101k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Outgoing commitment | USD 55k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 54k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 55k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 158k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 20k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 95k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 168k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Incoming funds | USD 60k | UNICEF | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
| 2026-07-31 | Disbursement | USD 0 | TECHNICAL ASSISTANCE (STAFFING COST) | removed |
Struck-through rows were in the previous version, last seen 2026-09-27 04:26 UTC, and are not in the current file.