United Nations Children's Fund (UNICEF) / unicef-palestine
PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATION
XM-DAC-41122-Palestine, State of-7050/PC/09/002/002
USD 78.46mdeclared budget
USD 1.96mdisbursed and spent, 40 of 103 transactions
Implementationstatus
31 Dec 2027planned end
Budget over time
- Reporting organisation
- UNICEF
- Start
- 01 Mar 2023
- Countries
- Palestinian Territories 100%
- Sectors
- 50-09-99 · publisher's own 34.2%; 50-09-01 · publisher's own 65.8%; Basic drinking water supply (14031) 65.8%; Water sector policy and administrative management (14010) 34.2%; 6 · SDG goal 100%
- Funded by
- Norway; European Commission / ECHO; Australian Committee for UNICEF; Global - Water Sanitation & Hygiene; Sweden; UNICEF Regular Resources and 3 more
- Participating
- IP not published (implementing); Norway (funding); European Commission / ECHO (funding); Australian Committee for UNICEF (funding); UNICEF (implementing); Global - Water Sanitation & Hygiene (funding); Sweden (funding); IP not published (implementing) and 4 more
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-09-28 02:30 UTC
Changes
- 2026-09-28Transaction rewritten+3 more
For project "PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATION", transactions totaling USD 169,938.00 changed dates from 2026-07-31 to 2026-08-31 while decreasing by 27.50%, additional transactions totaling USD 94,688.00 were added, and the title was updated, as part of
- Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 234,531 → USD 169,938 (-27.5%)
- Transaction rewritten: 7 transactions re-dated (2026-07-31 → 2026-08-31), USD 2,306,918.5 unchanged
- Transactions added: 1 transaction added, USD 95k
- Title changed: Title was “This activity will contribute to achieving results for the P”
PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATION · compare 0aa9eb02 → d26b237c
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2024-01-01 → 2024-12-31 | revised, indicative | USD 3.54m | current |
| 2025-01-01 → 2025-12-31 | revised, indicative | USD 13.60m | current |
| 2026-01-01 → 2026-12-31 | revised, indicative | USD 350k | current |
| 2027-01-01 → 2027-12-31 | revised, indicative | USD 13.60m | current |
| 2023-01-01 → 2023-12-31 | revised, indicative | USD 8.14m | current |
| 2024-01-01 → 2024-03-31 | revised, indicative | USD 885k | current |
| 2025-01-01 → 2025-03-31 | revised, indicative | USD 3.40m | current |
| 2026-01-01 → 2026-03-31 | revised, indicative | USD 88k | current |
| 2027-01-01 → 2027-03-31 | revised, indicative | USD 3.40m | current |
| 2023-01-01 → 2023-03-31 | revised, indicative | USD 2.04m | current |
| 2024-04-01 → 2024-06-30 | revised, indicative | USD 885k | current |
| 2025-04-01 → 2025-06-30 | revised, indicative | USD 3.40m | current |
| 2026-04-01 → 2026-06-30 | revised, indicative | USD 88k | current |
| 2027-04-01 → 2027-06-30 | revised, indicative | USD 3.40m | current |
| 2023-04-01 → 2023-06-30 | revised, indicative | USD 2.04m | current |
| 2024-07-01 → 2024-09-30 | revised, indicative | USD 885k | current |
| 2025-07-01 → 2025-09-30 | revised, indicative | USD 3.40m | current |
| 2026-07-01 → 2026-09-30 | revised, indicative | USD 88k | current |
| 2027-07-01 → 2027-09-30 | revised, indicative | USD 3.40m | current |
| 2023-07-01 → 2023-09-30 | revised, indicative | USD 2.04m | current |
| 2024-10-01 → 2024-12-31 | revised, indicative | USD 885k | current |
| 2025-10-01 → 2025-12-31 | revised, indicative | USD 3.40m | current |
| 2026-10-01 → 2026-12-31 | revised, indicative | USD 88k | current |
| 2027-10-01 → 2027-12-31 | revised, indicative | USD 3.40m | current |
| 2023-10-01 → 2023-12-31 | revised, indicative | USD 2.04m | current |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2026-01-31 | Expenditure | USD 1,904 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-01-31 | Expenditure | USD -203k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-03-31 | Expenditure | USD -2,994 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-03-31 | Expenditure | USD 11k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-07-31 | Expenditure | USD 19k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-07-31 | Expenditure | USD 95k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-05-31 | Expenditure | USD 29 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-03-31 | Expenditure | USD 605 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-10-31 | Expenditure | USD 5,795 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-07-31 | Expenditure | USD 69k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-02-28 | Expenditure | USD 146k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-09-30 | Expenditure | USD 7,707 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-01-31 | Expenditure | USD 203k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2023-12-31 | Expenditure | USD 34k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-09-30 | Expenditure | USD 950 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-04-30 | Expenditure | USD 63k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-12-31 | Expenditure | USD 203k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2023-12-31 | Expenditure | USD 65k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2024-12-31 | Expenditure | USD 435 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-03-31 | Expenditure | USD 926 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-10-31 | Expenditure | USD 4,160 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-03-31 | Expenditure | USD 12k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2024-12-31 | Expenditure | USD 18k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2024-12-31 | Expenditure | USD 253k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-06-30 | Expenditure | USD 4,828 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-02-28 | Expenditure | USD 2,994 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2024-12-31 | Expenditure | USD 291k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2024-12-31 | Expenditure | USD 43k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2023-12-31 | Expenditure | USD 145k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-10-31 | Expenditure | USD 60k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2025-06-30 | Expenditure | USD 103k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2024-12-31 | Expenditure | USD 978 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-01-31 | Expenditure | USD 126 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-03-31 | Expenditure | USD 102k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-08-31 | Expenditure | USD 95k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new | |
| 2025-07-31 | Expenditure | USD 53 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2026-03-31 | Expenditure | USD 990 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2023-12-31 | Expenditure | USD 19k | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2024-12-31 | Expenditure | USD 9,950 | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | ||
| 2024-12-31 | Incoming commitment | USD 64k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Disbursement | USD 69k | IP not published | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2024-12-31 | Incoming commitment | USD 235k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Incoming commitment | USD 137k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming commitment | USD 41k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Incoming commitment | USD 18k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Incoming commitment | USD 61k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Incoming commitment | USD 857 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming commitment | USD 12k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Incoming commitment | USD 27k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Incoming commitment | USD 53k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2024-12-31 | Incoming commitment | USD 107k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Incoming commitment | USD 32k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Incoming commitment | USD 432k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Incoming commitment | USD 178k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Incoming commitment | USD 55k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2024-12-31 | Incoming commitment | USD 72k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming commitment | USD 17k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming commitment | USD 26k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Incoming commitment | USD 1,256 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2024-12-31 | Outgoing commitment | USD 64k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Incoming commitment | USD 693k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2025-12-31 | Incoming commitment | USD 7,405 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Outgoing commitment | USD 137k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Outgoing commitment | USD 235k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Outgoing commitment | USD 41k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Outgoing commitment | USD 18k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Outgoing commitment | USD 12k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Outgoing commitment | USD 61k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Outgoing commitment | USD 857 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Outgoing commitment | USD 27k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Outgoing commitment | USD 53k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2024-12-31 | Outgoing commitment | USD 107k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Outgoing commitment | USD 432k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Outgoing commitment | USD 32k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Outgoing commitment | USD 55k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2025-12-31 | Outgoing commitment | USD 178k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Outgoing commitment | USD 72k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Outgoing commitment | USD 17k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Outgoing commitment | USD 26k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Outgoing commitment | USD 1,256 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2026-08-31 | Outgoing commitment | USD 693k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2025-12-31 | Outgoing commitment | USD 7,405 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming funds | USD 72k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Incoming funds | USD 53k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2026-08-31 | Incoming funds | USD 1,256 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2024-12-31 | Incoming funds | USD 107k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming funds | USD 26k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming funds | USD 17k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Incoming funds | USD 7,405 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming funds | USD 41k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming funds | USD 12k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Incoming funds | USD 178k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Incoming funds | USD 27k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-08-31 | Incoming funds | USD 55k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2026-08-31 | Incoming funds | USD 693k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | new |
| 2025-12-31 | Incoming funds | USD 432k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming funds | USD 64k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2024-12-31 | Incoming funds | USD 235k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Incoming funds | USD 137k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2025-12-31 | Incoming funds | USD 857 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Incoming funds | USD 18k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Incoming funds | USD 32k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2023-12-31 | Incoming funds | USD 61k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | |
| 2026-07-31 | Disbursement | USD 69k | IP not published | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Incoming commitment | USD 77k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Incoming commitment | USD 53k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Incoming commitment | USD 693k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Incoming commitment | USD 1,283 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Outgoing commitment | USD 53k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Outgoing commitment | USD 77k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Outgoing commitment | USD 693k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Outgoing commitment | USD 1,283 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Incoming funds | USD 1,283 | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Incoming funds | USD 53k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Incoming funds | USD 77k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
| 2026-07-31 | Incoming funds | USD 693k | UNICEF | PWA AND SERVICE PROVIDERS HAVE THE CAPACITY TO IMPLEMENT THE WATER AND SANITATIO | removed |
Struck-through rows were in the previous version, last seen 2026-09-27 04:26 UTC, and are not in the current file.