United Nations Children's Fund (UNICEF) / unicef-peru
880.3. PROGRAMME PLANNING AND M&E
XM-DAC-41122-Peru-3390/A0/06/880/003
USD 3.78mdeclared budget
USD 1.42mdisbursed and spent, 123 of 234 transactions
Pipelinestatus
28 Feb 2027planned end, was 31 Dec 2026
Budget over time
- Reporting organisation
- UNICEF
- Start
- 01 Mar 2022
- Countries
- Peru 100%
- Sectors
- 55-02-01 · publisher's own 23.8%; 55-01-01 · publisher's own 55.9%; 55-02-04 · publisher's own 0.7%; 55-01-02 · publisher's own 6.5%; 55-05-06 · publisher's own 0.4%; 55-05-07 · publisher's own 12.7%; Multisector aid for basic social services (16050) 86.6%; National monitoring and evaluation (15127) 12.7%; Population statistics and data (13096) 0.7%; 17 · SDG goal 100%
- Funded by
- European Commission / ECHO; Global - Thematic Humanitarian Resp; Japan; Education Cannot Wait Fund; UNICEF Regular Resources; Global - Education and 12 more
- Participating
- European Commission / ECHO (funding); UNICEF (implementing); RED DE ALIADOS PARA LAS SOCIEDADES ABANDONADAS RASA JOVEN (implementing); Global - Thematic Humanitarian Resp (funding); Japan (funding); Education Cannot Wait Fund (funding); UNICEF Regular Resources (funding); Global - Education (funding) and 15 more
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-09-28 02:31 UTC
Changes
- 2026-09-28Budget changed+6 more
For "880.3. PROGRAMME PLANNING AND M&E", the budget increased by 30.50% to USD 3,777,940.00, transactions were updated, and the planned end date was extended to 2027-02-28, as part of a bulk publisher update.
- Budget changed: Budget USD 2.90m → USD 3.78m (+30.5%)
- Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 450,399 → USD 448,110 (-0.5%)
- Transaction rewritten: 31 transactions re-dated (2026-07-31 → 2026-08-31), USD 593,778 unchanged
- Dates changed: planned end 2026-12-31 → 2027-02-28
- Transactions added: 3 transactions added, USD 12k
- Organisations changed: 3 organisation(s) removed, 4 added
- Title changed: Title was “This activity will contribute to achieving results for the 8”
880.3. PROGRAMME PLANNING AND M&E · compare 804cc589 → 25922a37
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2025-01-01 → 2025-12-31 | revised, indicative | USD 441k | current |
| 2026-01-01 → 2026-12-31 | revised, indicative | USD 365k | current |
| 2024-01-01 → 2024-12-31 | revised, indicative | USD 213k | current |
| 2023-01-01 → 2023-12-31 | revised, indicative | USD 202k | current |
| 2022-01-01 → 2022-12-31 | revised, indicative | USD 227k | current |
| 2027-01-01 → 2027-12-31 | revised, indicative | USD 441k | new since 27 Sept 2026 |
| 2025-01-01 → 2025-03-31 | revised, indicative | USD 110k | current |
| 2026-01-01 → 2026-03-31 | revised, indicative | USD 91k | current |
| 2024-01-01 → 2024-03-31 | revised, indicative | USD 53k | current |
| 2023-01-01 → 2023-03-31 | revised, indicative | USD 50k | current |
| 2022-01-01 → 2022-03-31 | revised, indicative | USD 57k | current |
| 2027-01-01 → 2027-03-31 | revised, indicative | USD 110k | new since 27 Sept 2026 |
| 2025-04-01 → 2025-06-30 | revised, indicative | USD 110k | current |
| 2026-04-01 → 2026-06-30 | revised, indicative | USD 91k | current |
| 2024-04-01 → 2024-06-30 | revised, indicative | USD 53k | current |
| 2023-04-01 → 2023-06-30 | revised, indicative | USD 50k | current |
| 2022-04-01 → 2022-06-30 | revised, indicative | USD 57k | current |
| 2027-04-01 → 2027-06-30 | revised, indicative | USD 110k | new since 27 Sept 2026 |
| 2025-07-01 → 2025-09-30 | revised, indicative | USD 110k | current |
| 2026-07-01 → 2026-09-30 | revised, indicative | USD 91k | current |
| 2024-07-01 → 2024-09-30 | revised, indicative | USD 53k | current |
| 2023-07-01 → 2023-09-30 | revised, indicative | USD 50k | current |
| 2022-07-01 → 2022-09-30 | revised, indicative | USD 57k | current |
| 2027-07-01 → 2027-09-30 | revised, indicative | USD 110k | new since 27 Sept 2026 |
| 2025-10-01 → 2025-12-31 | revised, indicative | USD 110k | current |
| 2026-10-01 → 2026-12-31 | revised, indicative | USD 91k | current |
| 2024-10-01 → 2024-12-31 | revised, indicative | USD 53k | current |
| 2023-10-01 → 2023-12-31 | revised, indicative | USD 50k | current |
| 2022-10-01 → 2022-12-31 | revised, indicative | USD 57k | current |
| 2027-10-01 → 2027-12-31 | revised, indicative | USD 110k | new since 27 Sept 2026 |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2025-02-28 | Expenditure | USD 7,661 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-01-31 | Expenditure | USD 1,522 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2023-12-31 | Expenditure | USD 142k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 4,069 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 1,124 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-07-31 | Expenditure | USD -17 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-06-30 | Expenditure | USD 2,906 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-07-31 | Expenditure | USD -3 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-03-31 | Expenditure | USD -5 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-07-31 | Expenditure | USD 788 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-11-30 | Expenditure | USD 176 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-03-31 | Expenditure | USD 4 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-08-31 | Expenditure | USD 11k | 880.3. PROGRAMME PLANNING AND M&E | new | |
| 2026-02-28 | Expenditure | USD 2,309 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-09-30 | Expenditure | USD 8,222 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-07-31 | Expenditure | USD 8,724 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-07-31 | Expenditure | USD 11k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 20k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD -7 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 12k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-04-30 | Expenditure | USD 5,763 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-03-31 | Expenditure | USD -31 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-02-28 | Expenditure | USD 7,000 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-11-30 | Expenditure | USD 4,037 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-11-30 | Expenditure | USD 22 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-06-30 | Expenditure | USD 3,260 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-12-31 | Expenditure | USD 111 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 5,170 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-05-31 | Expenditure | USD 8,498 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-01-31 | Expenditure | USD 6,858 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-01-31 | Expenditure | USD 4,618 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-03-31 | Expenditure | USD 11k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-06-30 | Expenditure | USD 8,502 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-06-30 | Expenditure | USD 10k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-12-31 | Expenditure | USD 54k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-02-28 | Expenditure | USD 371 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-02-28 | Expenditure | USD 31k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 95k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 45k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 65k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-08-31 | Expenditure | USD -12 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 1,134 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-06-30 | Expenditure | USD 6,465 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-12-31 | Expenditure | USD 23k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-07-31 | Expenditure | USD 3,545 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 1,033 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 17k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-11-30 | Expenditure | USD 15k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-08-31 | Expenditure | USD 1,224 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-09-30 | Expenditure | USD 7,671 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 66k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-06-30 | Expenditure | USD -56 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-08-31 | Expenditure | USD 1,006 | 880.3. PROGRAMME PLANNING AND M&E | new | |
| 2025-10-31 | Expenditure | USD 1,173 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-09-30 | Expenditure | USD 1,048 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-10-31 | Expenditure | USD 80 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-09-30 | Expenditure | USD 1,018 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-04-30 | Expenditure | USD 29 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-04-30 | Expenditure | USD 8,488 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-01-31 | Expenditure | USD 10k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-12-31 | Expenditure | USD 19k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-05-31 | Expenditure | USD 11k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-04-30 | Expenditure | USD 12k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 31k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2023-12-31 | Expenditure | USD 57k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-02-28 | Expenditure | USD 674 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-01-31 | Expenditure | USD 3 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-12-31 | Expenditure | USD 3,563 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-02-28 | Expenditure | USD -41 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-03-31 | Expenditure | USD 10 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2023-12-31 | Expenditure | USD 3,398 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-03-31 | Expenditure | USD 97 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-11-30 | Expenditure | USD 243 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-07-31 | Expenditure | USD -26k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-11-30 | Expenditure | USD 8,222 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-08-31 | Expenditure | USD 8,222 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-02-28 | Expenditure | USD 1,035 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 7,551 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-04-30 | Expenditure | USD 3,815 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-05-31 | Expenditure | USD 67 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-05-31 | Expenditure | USD -8 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 89k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-01-31 | Expenditure | USD 20 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 10k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 15k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-09-30 | Expenditure | USD 6,161 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-11-30 | Expenditure | USD 1,123 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-07-31 | Expenditure | USD 1,583 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-03-31 | Expenditure | USD 8,520 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-05-31 | Expenditure | USD 44k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-12-31 | Expenditure | USD 22k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 26k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2023-12-31 | Expenditure | USD 58k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-04-30 | Expenditure | USD 8 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-06-30 | Expenditure | USD -10 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-08-31 | Expenditure | USD -2 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-04-30 | Expenditure | USD 44 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-05-31 | Expenditure | USD -46 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-12-31 | Expenditure | USD 1,067 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-04-30 | Expenditure | USD 22 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2024-12-31 | Expenditure | USD 3,047 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-04-30 | Expenditure | USD 514 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-08-31 | Expenditure | USD 10 | 880.3. PROGRAMME PLANNING AND M&E | new | |
| 2025-12-31 | Expenditure | USD 9 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-08-31 | Expenditure | USD 39 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 195 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-10-31 | Expenditure | USD 1,048 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-05-31 | Expenditure | USD 22 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 1,136 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-10-31 | Expenditure | USD 8,222 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-02-28 | Expenditure | USD 8,552 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-07-31 | Expenditure | USD 37k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2022-12-31 | Expenditure | USD 63k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2023-12-31 | Expenditure | USD 40k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-05-31 | Expenditure | USD 9,568 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-07-31 | Expenditure | USD 1,179 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-06-30 | Expenditure | USD 7,112 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-02-28 | Expenditure | USD 3,774 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-07-31 | Expenditure | USD 6,505 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2023-12-31 | Expenditure | USD 29k | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2026-05-31 | Expenditure | USD 783 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2023-12-31 | Expenditure | USD 9,381 | 880.3. PROGRAMME PLANNING AND M&E | ||
| 2025-12-31 | Incoming commitment | USD 7,580 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming commitment | USD 8,774 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2025-12-31 | Incoming commitment | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming commitment | USD 48k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming commitment | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming commitment | USD 4,460 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming commitment | USD 695 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2024-12-31 | Incoming commitment | USD 19k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Incoming commitment | USD 15k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Incoming commitment | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming commitment | USD 141k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming commitment | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming commitment | USD 7,823 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Incoming commitment | USD 121k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming commitment | USD 38k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Incoming commitment | USD 57k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming commitment | USD 3,154 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming commitment | USD 10k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming commitment | USD 61k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming commitment | USD 127k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Incoming commitment | USD 24k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming commitment | USD -2,026 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming commitment | USD 16k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming commitment | USD 2,847 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming commitment | USD 50k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming commitment | USD 13k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2025-12-31 | Incoming commitment | USD 74k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Incoming commitment | USD 81k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Incoming commitment | USD 68k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming commitment | USD 2,047 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming commitment | USD 9,986 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2024-12-31 | Incoming commitment | USD 56 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming commitment | USD 62k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming commitment | USD 20k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming commitment | USD 149k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2025-12-31 | Outgoing commitment | USD 7,580 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Outgoing commitment | USD 8,774 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2025-12-31 | Outgoing commitment | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Incoming commitment | USD 126k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming commitment | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Outgoing commitment | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Outgoing commitment | USD 4,460 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Outgoing commitment | USD 695 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2024-12-31 | Outgoing commitment | USD 19k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Outgoing commitment | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Outgoing commitment | USD 141k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Outgoing commitment | USD 15k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Outgoing commitment | USD 48k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Outgoing commitment | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Outgoing commitment | USD 7,823 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Outgoing commitment | USD 121k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Outgoing commitment | USD 3,154 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Outgoing commitment | USD 38k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Outgoing commitment | USD 57k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Outgoing commitment | USD 61k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Outgoing commitment | USD 24k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Outgoing commitment | USD 10k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Outgoing commitment | USD 127k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Outgoing commitment | USD -2,026 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Outgoing commitment | USD 16k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Outgoing commitment | USD 2,847 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Outgoing commitment | USD 50k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Outgoing commitment | USD 13k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2025-12-31 | Outgoing commitment | USD 74k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Outgoing commitment | USD 81k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Outgoing commitment | USD 68k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Outgoing commitment | USD 2,047 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Outgoing commitment | USD 9,986 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2024-12-31 | Outgoing commitment | USD 56 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Outgoing commitment | USD 62k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Outgoing commitment | USD 20k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Outgoing commitment | USD 149k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming funds | USD 695 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2025-12-31 | Incoming funds | USD 3,154 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming funds | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Outgoing commitment | USD 126k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Outgoing commitment | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming funds | USD 13k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2025-12-31 | Incoming funds | USD 74k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Incoming funds | USD 81k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming funds | USD -2,026 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Incoming funds | USD 24k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Incoming funds | USD 19k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming funds | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming funds | USD 20k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming funds | USD 149k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2023-12-31 | Incoming funds | USD 10k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Incoming funds | USD 126k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming funds | USD 61k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Incoming funds | USD 121k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming funds | USD 2,847 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming funds | USD 2,047 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2024-12-31 | Incoming funds | USD 15k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Incoming funds | USD 57k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2024-12-31 | Incoming funds | USD 68k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming funds | USD 38k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming funds | USD 48k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming funds | USD 43k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2022-12-31 | Incoming funds | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2023-12-31 | Incoming funds | USD 141k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming funds | USD 7,823 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2025-12-31 | Incoming funds | USD 7,580 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming funds | USD 9,986 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2024-12-31 | Incoming funds | USD 56 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming funds | USD 62k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2023-12-31 | Incoming funds | USD 16k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming funds | USD 4,460 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Incoming funds | USD 8,774 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2025-12-31 | Incoming funds | USD 127k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | |
| 2026-08-31 | Incoming funds | USD 50k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-08-31 | Disbursement | USD 0 | 880.3. PROGRAMME PLANNING AND M&E | new | |
| 2026-08-31 | Incoming funds | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | new |
| 2026-07-31 | Incoming commitment | USD 8,774 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 4,460 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 9,358 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 13k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 2,847 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 20k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 62k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 50k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 141k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 2,047 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming commitment | USD 9,986 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 8,774 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 9,358 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 4,460 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 13k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 2,847 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 62k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 50k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 20k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 141k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 9,986 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Outgoing commitment | USD 2,047 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 9,358 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 141k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 13k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 20k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 2,847 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 2,047 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 9,986 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 25k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 62k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 8,774 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Incoming funds | USD 4,460 | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
| 2026-07-31 | Disbursement | USD 0 | 880.3. PROGRAMME PLANNING AND M&E | removed | |
| 2026-07-31 | Incoming funds | USD 50k | UNICEF | 880.3. PROGRAMME PLANNING AND M&E | removed |
Struck-through rows were in the previous version, last seen 2026-09-27 04:26 UTC, and are not in the current file.