United Nations Children's Fund (UNICEF) / unicef-togo
PILOTAGE ET QUALITÉ
XM-DAC-41122-Togo-4230/A0/07/732/002
USD 9.46mdeclared budget
USD 2.06mdisbursed and spent, 112 of 139 transactions
Implementationstatus
31 Dec 2027planned end, was 31 Dec 2026
Budget over time
- Reporting organisation
- UNICEF
- Start
- 01 Jan 2024
- Countries
- Togo 100%
- Sectors
- 51-02-09 · publisher's own 9.7%; 51-01-12 · publisher's own 14.4%; 51-01-14 · publisher's own 10.7%; 51-02-99 · publisher's own 60.2%; 51-02-04 · publisher's own 1%; 51-02-13 · publisher's own 4.1%; Education policy and administrative management (11110) 25.1%; Education facilities and training (11120) 4.1%; Lower secondary education (11260) 1%; Educational research (11182) 60.2%; Teacher training (11130) 9.7%; 4 · SDG goal 100%
- Funded by
- UNICEF Regular Resources; Global - Education; Global Partnership for Education; Canada; Korea International Cooperation Age
- Participating
- UNICEF Regular Resources (funding); DRE PLATEAUX EST DIRECTION REGIONALE DE L EDUCATION PLATEAUX (implementing); SECRETARIAT GENERAL DU MINISTERE DE L'EDUCATION NATIONALE (implementing); DRE KARA DIRECTION REGIONALE DE L EDUCATION KARA (implementing); Global - Education (funding); UNICEF (implementing); DRE CENTRALE DIRECTION REGIONALE DE L'EDUCATION CENTRALE (implementing); MOUVEMENT DES ENSEIGNANTS NOVATEURS (implementing) and 6 more
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-09-28 02:31 UTC
Changes
- 2026-09-28Transaction rewritten+5 more
For the project "PILOTAGE ET QUALITÉ", the total transaction amount decreased by 65.10% from USD 6,630,612.00 to USD 2,312,970.00, the total budget increased by 33.30% to USD 9,464,450.00, and the planned end date was extended from December 31,
- Transaction rewritten: 6 transactions restated as of 2026-08-31: total USD 6,630,612 → USD 2,312,970 (-65.1%)
- Budget changed: Budget USD 7.10m → USD 9.46m (+33.3%)
- Dates changed: planned end 2026-12-31 → 2027-12-31
- Transaction rewritten: 12 transactions re-dated (2026-07-31 → 2026-08-31), USD 1,926,280.35 unchanged
- Transactions added: 4 transactions added, USD 42k
- Title changed: Title was “This activity will contribute to achieving results for the P”
PILOTAGE ET QUALITÉ · compare 0a6b5aeb → f6c51862
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2025-01-01 → 2025-12-31 | revised, indicative | USD 1.18m | current |
| 2026-01-01 → 2026-12-31 | revised, indicative | USD 1.18m | current |
| 2027-01-01 → 2027-12-31 | revised, indicative | USD 1.18m | new since 27 Sept 2026 |
| 2024-01-01 → 2024-12-31 | revised, indicative | USD 1.18m | current |
| 2025-01-01 → 2025-03-31 | revised, indicative | USD 296k | current |
| 2026-01-01 → 2026-03-31 | revised, indicative | USD 296k | current |
| 2027-01-01 → 2027-03-31 | revised, indicative | USD 296k | new since 27 Sept 2026 |
| 2024-01-01 → 2024-03-31 | revised, indicative | USD 296k | current |
| 2025-04-01 → 2025-06-30 | revised, indicative | USD 296k | current |
| 2026-04-01 → 2026-06-30 | revised, indicative | USD 296k | current |
| 2027-04-01 → 2027-06-30 | revised, indicative | USD 296k | new since 27 Sept 2026 |
| 2024-04-01 → 2024-06-30 | revised, indicative | USD 296k | current |
| 2025-07-01 → 2025-09-30 | revised, indicative | USD 296k | current |
| 2026-07-01 → 2026-09-30 | revised, indicative | USD 296k | current |
| 2027-07-01 → 2027-09-30 | revised, indicative | USD 296k | new since 27 Sept 2026 |
| 2024-07-01 → 2024-09-30 | revised, indicative | USD 296k | current |
| 2025-10-01 → 2025-12-31 | revised, indicative | USD 296k | current |
| 2026-10-01 → 2026-12-31 | revised, indicative | USD 296k | current |
| 2027-10-01 → 2027-12-31 | revised, indicative | USD 296k | new since 27 Sept 2026 |
| 2024-10-01 → 2024-12-31 | revised, indicative | USD 296k | current |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2026-04-30 | Expenditure | USD 147 | PILOTAGE ET QUALITÉ | ||
| 2025-11-30 | Expenditure | USD 9,022 | PILOTAGE ET QUALITÉ | ||
| 2025-03-31 | Expenditure | USD 3,613 | PILOTAGE ET QUALITÉ | ||
| 2025-11-30 | Expenditure | USD 24k | PILOTAGE ET QUALITÉ | ||
| 2025-03-31 | Expenditure | USD 8,699 | PILOTAGE ET QUALITÉ | ||
| 2026-04-30 | Expenditure | USD 24k | PILOTAGE ET QUALITÉ | ||
| 2026-06-30 | Expenditure | USD 25k | PILOTAGE ET QUALITÉ | ||
| 2025-10-31 | Expenditure | USD 14k | PILOTAGE ET QUALITÉ | ||
| 2025-04-30 | Expenditure | USD 24k | PILOTAGE ET QUALITÉ | ||
| 2024-12-31 | Expenditure | USD 63k | PILOTAGE ET QUALITÉ | ||
| 2025-11-30 | Expenditure | USD 17k | PILOTAGE ET QUALITÉ | ||
| 2025-11-30 | Expenditure | USD 20k | PILOTAGE ET QUALITÉ | ||
| 2025-01-31 | Expenditure | USD 39k | PILOTAGE ET QUALITÉ | ||
| 2025-06-30 | Expenditure | USD 25k | PILOTAGE ET QUALITÉ | ||
| 2026-07-31 | Expenditure | USD 4,141 | PILOTAGE ET QUALITÉ | ||
| 2025-12-31 | Expenditure | USD 6,526 | PILOTAGE ET QUALITÉ | ||
| 2025-09-30 | Expenditure | USD 9,860 | PILOTAGE ET QUALITÉ | ||
| 2026-06-30 | Expenditure | USD 2,102 | PILOTAGE ET QUALITÉ | ||
| 2025-06-30 | Expenditure | USD 26k | PILOTAGE ET QUALITÉ | ||
| 2025-03-31 | Expenditure | USD 30k | PILOTAGE ET QUALITÉ | ||
| 2025-09-30 | Expenditure | USD 3,175 | PILOTAGE ET QUALITÉ | ||
| 2026-05-31 | Expenditure | USD 28k | PILOTAGE ET QUALITÉ | ||
| 2026-02-28 | Expenditure | USD 12k | PILOTAGE ET QUALITÉ | ||
| 2025-06-30 | Expenditure | USD 8,329 | PILOTAGE ET QUALITÉ | ||
| 2026-07-31 | Expenditure | USD 376 | PILOTAGE ET QUALITÉ | ||
| 2026-03-31 | Expenditure | USD 2,425 | PILOTAGE ET QUALITÉ | ||
| 2025-03-31 | Expenditure | USD 8,199 | PILOTAGE ET QUALITÉ | ||
| 2025-04-30 | Expenditure | USD 2,179 | PILOTAGE ET QUALITÉ | ||
| 2024-12-31 | Expenditure | USD 45k | PILOTAGE ET QUALITÉ | ||
| 2024-12-31 | Expenditure | USD 12k | PILOTAGE ET QUALITÉ | ||
| 2026-06-30 | Expenditure | USD 5,375 | PILOTAGE ET QUALITÉ | ||
| 2025-06-30 | Expenditure | USD 9,950 | PILOTAGE ET QUALITÉ | ||
| 2025-12-31 | Expenditure | USD 11k | PILOTAGE ET QUALITÉ | ||
| 2026-01-31 | Expenditure | USD 9,049 | PILOTAGE ET QUALITÉ | ||
| 2025-01-31 | Expenditure | USD 8,675 | PILOTAGE ET QUALITÉ | ||
| 2025-09-30 | Expenditure | USD 14k | PILOTAGE ET QUALITÉ | ||
| 2025-12-31 | Expenditure | USD 6,671 | PILOTAGE ET QUALITÉ | ||
| 2025-07-31 | Expenditure | USD 8,561 | PILOTAGE ET QUALITÉ | ||
| 2026-04-30 | Expenditure | USD 4,281 | PILOTAGE ET QUALITÉ | ||
| 2025-02-28 | Expenditure | USD 38k | PILOTAGE ET QUALITÉ | ||
| 2025-09-30 | Expenditure | USD 4,185 | PILOTAGE ET QUALITÉ | ||
| 2025-04-30 | Expenditure | USD 570 | PILOTAGE ET QUALITÉ | ||
| 2026-02-28 | Expenditure | USD 18k | PILOTAGE ET QUALITÉ | ||
| 2026-08-31 | Expenditure | USD 9,049 | PILOTAGE ET QUALITÉ | new | |
| 2025-12-31 | Expenditure | USD 14k | PILOTAGE ET QUALITÉ | ||
| 2025-05-31 | Expenditure | USD 8,702 | PILOTAGE ET QUALITÉ | ||
| 2026-01-31 | Expenditure | USD 24k | PILOTAGE ET QUALITÉ | ||
| 2026-05-31 | Expenditure | USD 2,102 | PILOTAGE ET QUALITÉ | ||
| 2025-03-31 | Expenditure | USD 73 | PILOTAGE ET QUALITÉ | ||
| 2025-12-31 | Expenditure | USD 4,377 | PILOTAGE ET QUALITÉ | ||
| 2025-10-31 | Expenditure | USD 2,360 | PILOTAGE ET QUALITÉ | ||
| 2025-03-31 | Expenditure | USD 2,514 | PILOTAGE ET QUALITÉ | ||
| 2026-01-31 | Expenditure | USD 1,168 | PILOTAGE ET QUALITÉ | ||
| 2025-02-28 | Expenditure | USD 24k | PILOTAGE ET QUALITÉ | ||
| 2026-08-31 | Expenditure | USD 30k | PILOTAGE ET QUALITÉ | new | |
| 2026-03-31 | Expenditure | USD 2,102 | PILOTAGE ET QUALITÉ | ||
| 2026-02-28 | Expenditure | USD 24k | PILOTAGE ET QUALITÉ | ||
| 2025-08-31 | Expenditure | USD 14k | PILOTAGE ET QUALITÉ | ||
| 2025-04-30 | Expenditure | USD 8,709 | PILOTAGE ET QUALITÉ | ||
| 2025-12-31 | Expenditure | USD 26k | PILOTAGE ET QUALITÉ | ||
| 2025-11-30 | Expenditure | USD 14k | PILOTAGE ET QUALITÉ | ||
| 2024-12-31 | Expenditure | USD 78k | PILOTAGE ET QUALITÉ | ||
| 2025-10-31 | Expenditure | USD 3,504 | PILOTAGE ET QUALITÉ | ||
| 2026-07-31 | Expenditure | USD 2,533 | PILOTAGE ET QUALITÉ | ||
| 2026-06-30 | Expenditure | USD 8,562 | PILOTAGE ET QUALITÉ | ||
| 2025-09-30 | Expenditure | USD 22k | PILOTAGE ET QUALITÉ | ||
| 2026-02-28 | Expenditure | USD 2,102 | PILOTAGE ET QUALITÉ | ||
| 2025-10-31 | Expenditure | USD 6,676 | PILOTAGE ET QUALITÉ | ||
| 2025-06-30 | Expenditure | USD 8,713 | PILOTAGE ET QUALITÉ | ||
| 2025-02-28 | Expenditure | USD 8,679 | PILOTAGE ET QUALITÉ | ||
| 2026-07-31 | Expenditure | USD 25k | PILOTAGE ET QUALITÉ | ||
| 2026-03-31 | Expenditure | USD 5,815 | PILOTAGE ET QUALITÉ | ||
| 2025-04-30 | Expenditure | USD 853 | PILOTAGE ET QUALITÉ | ||
| 2026-08-31 | Expenditure | USD 2,244 | PILOTAGE ET QUALITÉ | new | |
| 2024-12-31 | Expenditure | USD 1,693 | PILOTAGE ET QUALITÉ | ||
| 2025-10-31 | Expenditure | USD 38k | PILOTAGE ET QUALITÉ | ||
| 2025-12-31 | Expenditure | USD 8,993 | PILOTAGE ET QUALITÉ | ||
| 2026-03-31 | Expenditure | USD 170 | PILOTAGE ET QUALITÉ | ||
| 2025-01-31 | Expenditure | USD 25k | PILOTAGE ET QUALITÉ | ||
| 2026-01-31 | Expenditure | USD 18k | PILOTAGE ET QUALITÉ | ||
| 2025-11-30 | Expenditure | USD 6,671 | PILOTAGE ET QUALITÉ | ||
| 2025-07-31 | Expenditure | USD 26k | PILOTAGE ET QUALITÉ | ||
| 2026-07-31 | Expenditure | USD 9,049 | PILOTAGE ET QUALITÉ | ||
| 2025-08-31 | Expenditure | USD 6,676 | PILOTAGE ET QUALITÉ | ||
| 2025-08-31 | Expenditure | USD 3,175 | PILOTAGE ET QUALITÉ | ||
| 2026-04-30 | Expenditure | USD 2,102 | PILOTAGE ET QUALITÉ | ||
| 2026-05-31 | Expenditure | USD 194k | PILOTAGE ET QUALITÉ | ||
| 2025-12-31 | Expenditure | USD 7,731 | PILOTAGE ET QUALITÉ | ||
| 2024-12-31 | Expenditure | USD 9,005 | PILOTAGE ET QUALITÉ | ||
| 2026-03-31 | Expenditure | USD 1,196 | PILOTAGE ET QUALITÉ | ||
| 2026-04-30 | Expenditure | USD 492 | PILOTAGE ET QUALITÉ | ||
| 2025-12-31 | Expenditure | USD 1,019 | PILOTAGE ET QUALITÉ | ||
| 2025-07-31 | Expenditure | USD 14k | PILOTAGE ET QUALITÉ | ||
| 2025-05-31 | Expenditure | USD 27k | PILOTAGE ET QUALITÉ | ||
| 2025-09-30 | Expenditure | USD 6,676 | PILOTAGE ET QUALITÉ | ||
| 2025-10-31 | Expenditure | USD 3,175 | PILOTAGE ET QUALITÉ | ||
| 2026-03-31 | Expenditure | USD 24k | PILOTAGE ET QUALITÉ | ||
| 2024-12-31 | Expenditure | USD 262k | PILOTAGE ET QUALITÉ | ||
| 2026-08-31 | Expenditure | USD 466 | PILOTAGE ET QUALITÉ | new | |
| 2026-06-30 | Expenditure | USD 9,397 | PILOTAGE ET QUALITÉ | ||
| 2024-12-31 | Disbursement | USD 344 | DRE MARITIME DIRECTION REGIONALE DE L EDUCATION MARITIME | PILOTAGE ET QUALITÉ | |
| 2024-12-31 | Disbursement | USD 4,911 | DRE GRAND LOME DIRECTION REGIONALE DE L EDUCATION GRAND LOME | PILOTAGE ET QUALITÉ | |
| 2025-12-31 | Disbursement | USD 41k | SECRETARIAT GENERAL DU MINISTERE DE L'EDUCATION NATIONALE | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Disbursement | USD 103k | SECRETARIAT GENERAL DU MINISTERE DE L'EDUCATION NATIONALE | PILOTAGE ET QUALITÉ | new |
| 2025-12-31 | Disbursement | USD 23k | MOUVEMENT DES ENSEIGNANTS NOVATEURS | PILOTAGE ET QUALITÉ | |
| 2024-12-31 | Disbursement | USD 44k | SECRETARIAT GENERAL DU MINISTERE DE L'EDUCATION NATIONALE | PILOTAGE ET QUALITÉ | |
| 2024-12-31 | Disbursement | USD 24k | DRE CENTRALE DIRECTION REGIONALE DE L'EDUCATION CENTRALE | PILOTAGE ET QUALITÉ | |
| 2024-12-31 | Disbursement | USD 5,262 | MOUVEMENT DES ENSEIGNANTS NOVATEURS | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Disbursement | USD 9,238 | DRE KARA DIRECTION REGIONALE DE L EDUCATION KARA | PILOTAGE ET QUALITÉ | new |
| 2026-08-31 | Incoming commitment | USD 124k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2024-12-31 | Incoming commitment | USD 75k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Incoming commitment | USD 30k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2026-08-31 | Disbursement | USD 31k | DRE PLATEAUX OUEST DIRECTION REGIONALE DE L EDUCATION PLATEAUX | PILOTAGE ET QUALITÉ | new |
| 2025-12-31 | Disbursement | USD 8,329 | DRE GRAND LOME DIRECTION REGIONALE DE L EDUCATION GRAND LOME | PILOTAGE ET QUALITÉ | |
| 2025-12-31 | Disbursement | USD 31k | DRE PLATEAUX EST DIRECTION REGIONALE DE L EDUCATION PLATEAUX | PILOTAGE ET QUALITÉ | |
| 2025-12-31 | Incoming commitment | USD 103k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Incoming commitment | USD 440k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2026-08-31 | Incoming commitment | USD 418k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2024-12-31 | Incoming commitment | USD 415k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Incoming commitment | USD 353k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2025-12-31 | Incoming commitment | USD 607k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Outgoing commitment | USD 124k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2024-12-31 | Outgoing commitment | USD 75k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Outgoing commitment | USD 30k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2025-12-31 | Outgoing commitment | USD 103k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Outgoing commitment | USD 440k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2026-08-31 | Outgoing commitment | USD 418k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2026-08-31 | Outgoing commitment | USD 353k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2024-12-31 | Outgoing commitment | USD 415k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2025-12-31 | Outgoing commitment | USD 607k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2025-12-31 | Incoming funds | USD 607k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Incoming funds | USD 30k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2026-08-31 | Incoming funds | USD 124k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2025-12-31 | Incoming funds | USD 103k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Incoming funds | USD 440k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2024-12-31 | Incoming funds | USD 415k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-08-31 | Incoming funds | USD 353k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2026-08-31 | Incoming funds | USD 418k | UNICEF | PILOTAGE ET QUALITÉ | new |
| 2024-12-31 | Incoming funds | USD 75k | UNICEF | PILOTAGE ET QUALITÉ | |
| 2026-07-31 | Disbursement | USD 31k | DRE PLATEAUX OUEST DIRECTION REGIONALE DE L EDUCATION PLATEAUX | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Disbursement | USD 103k | SECRETARIAT GENERAL DU MINISTERE DE L'EDUCATION NATIONALE | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming commitment | USD 124k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Disbursement | USD 9,238 | DRE KARA DIRECTION REGIONALE DE L EDUCATION KARA | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming commitment | USD 440k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming commitment | USD 30k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming commitment | USD 1.21m | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming commitment | USD 1000k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Outgoing commitment | USD 30k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Outgoing commitment | USD 124k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Outgoing commitment | USD 440k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Outgoing commitment | USD 1.21m | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Outgoing commitment | USD 1000k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming funds | USD 124k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming funds | USD 30k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming funds | USD 440k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming funds | USD 1000k | UNICEF | PILOTAGE ET QUALITÉ | removed |
| 2026-07-31 | Incoming funds | USD 1.21m | UNICEF | PILOTAGE ET QUALITÉ | removed |
Struck-through rows were in the previous version, last seen 2026-09-27 04:26 UTC, and are not in the current file.