United Nations Children's Fund (UNICEF) / unicef-yemen
OUTPUT 1.2: Maternal, Neonatal, and Child Health (MNCH) PROGRAMME
XM-DAC-41122-Yemen-4920/A0/07/001/002
USD 151.32mdeclared budget
USD 19.72mdisbursed and spent, 285 of 402 transactions
Implementationstatus
28 Feb 2027planned end, was 31 Dec 2026
Budget over time
- Reporting organisation
- UNICEF
- Start
- 01 Jan 2023
- Countries
- Yemen 100%
- Sectors
- 50-01-01 · publisher's own 26.2%; 50-01-02 · publisher's own 36.8%; 50-01-19 · publisher's own 15.3%; 50-01-06 · publisher's own 21.6%; Reproductive health care (13020) 26.2%; Multi-hazard response preparedness (74020) 15.3%; Basic health care (12220) 36.8%; Health policy and administrative management (12110) 21.6%; 3 · SDG goal 100%
- Funded by
- The United Kingdom; Saudi Arabia; Global - Thematic Humanitarian Resp; United States of America; Kuwait; Republic of Korea and 11 more
- Participating
- HEALTH OFFICE AND POPULATION IBB (implementing); HEALTH OFFICE SAADA (implementing); GENERAL HEALTH OFFICE HAJJA (implementing); HEALTH AND POPULATION OFFICE HADRAMOUT ALWADI AND ALSAHRAA (implementing); HEALTH AND ENVIRONMENT OFFICE RIMA GOV (implementing); HEALTH OFFICE MARIB (implementing); HADRMOUT HEALTH OFFICE AL SAHEL MUKALA (implementing); The United Kingdom (funding) and 41 more
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-09-28 02:31 UTC
Changes
- 2026-09-28Transaction rewritten+5 more
In project "OUTPUT 1.2: Maternal, Neonatal, and Child Health (MNCH) PROGRAMME", the budget increased by 3.00% to USD 151,323,226.00, transactions increased by USD 2,100,000.00 to USD 2,261,271.00, and the planned end date was extended from 20
- Transaction rewritten: 3 transactions restated as of 2026-08-31: total USD 161,271 → USD 2,261,271 (+1302.2%)
- Transaction rewritten: 24 transactions re-dated (2026-07-31 → 2026-08-31), USD 7,291,707 unchanged
- Budget changed: Budget USD 146.85m → USD 151.32m (+3.0%)
- Dates changed: planned end 2026-12-31 → 2027-02-28
- Transactions added: 2 transactions added, USD 27k
- Title changed: Title was “This activity will contribute to achieving results for the O”
OUTPUT 1.2: Maternal, Neonatal, and Child Health (MNCH) PROGRAMME · compare 7c00b677 → 68186974
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2023-01-01 → 2023-12-31 | revised, indicative | USD 64.06m | current |
| 2027-01-01 → 2027-12-31 | revised, indicative | USD 2.24m | new since 27 Sept 2026 |
| 2026-01-01 → 2026-12-31 | revised, indicative | USD 3.00m | current |
| 2025-01-01 → 2025-12-31 | revised, indicative | USD 2.24m | current |
| 2024-01-01 → 2024-12-31 | revised, indicative | USD 4.13m | current |
| 2023-01-01 → 2023-03-31 | revised, indicative | USD 16.01m | current |
| 2027-01-01 → 2027-03-31 | revised, indicative | USD 560k | new since 27 Sept 2026 |
| 2026-01-01 → 2026-03-31 | revised, indicative | USD 750k | current |
| 2025-01-01 → 2025-03-31 | revised, indicative | USD 560k | current |
| 2024-01-01 → 2024-03-31 | revised, indicative | USD 1.03m | current |
| 2023-04-01 → 2023-06-30 | revised, indicative | USD 16.01m | current |
| 2027-04-01 → 2027-06-30 | revised, indicative | USD 560k | new since 27 Sept 2026 |
| 2026-04-01 → 2026-06-30 | revised, indicative | USD 750k | current |
| 2025-04-01 → 2025-06-30 | revised, indicative | USD 560k | current |
| 2024-04-01 → 2024-06-30 | revised, indicative | USD 1.03m | current |
| 2023-07-01 → 2023-09-30 | revised, indicative | USD 16.01m | current |
| 2027-07-01 → 2027-09-30 | revised, indicative | USD 560k | new since 27 Sept 2026 |
| 2026-07-01 → 2026-09-30 | revised, indicative | USD 750k | current |
| 2025-07-01 → 2025-09-30 | revised, indicative | USD 560k | current |
| 2024-07-01 → 2024-09-30 | revised, indicative | USD 1.03m | current |
| 2023-10-01 → 2023-12-31 | revised, indicative | USD 16.01m | current |
| 2027-10-01 → 2027-12-31 | revised, indicative | USD 560k | new since 27 Sept 2026 |
| 2026-10-01 → 2026-12-31 | revised, indicative | USD 750k | current |
| 2025-10-01 → 2025-12-31 | revised, indicative | USD 560k | current |
| 2024-10-01 → 2024-12-31 | revised, indicative | USD 1.03m | current |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2024-12-31 | Expenditure | USD 1.20m | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 56k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD -7,473 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 937 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 21k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 6,892 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 590k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 263k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 7,325 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 91k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD 115k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 121k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 3 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 275k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 66k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 24k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 14k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 114k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 16k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-09-30 | Expenditure | USD 18k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 3,497 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD -139k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 33k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 5,056 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD -1,450 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 802 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-05-31 | Expenditure | USD -1,879 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 10k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-04-30 | Expenditure | USD 31k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 85k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 157 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 1.02m | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 21k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 8,890 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 80k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 9,753 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD -352 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-07-31 | Expenditure | USD 11k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 50k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 422k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD -8,688 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD -202 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 108k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 90k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 51k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 61k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 36k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 246k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 462 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 30k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 10k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 35k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 44k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 41k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 191k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 21k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 21k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 4,107 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 796 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 100k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 502k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 148k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-04-30 | Expenditure | USD 11k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 235k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 895 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD -66k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 62k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 16k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 15k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 75k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD -5,308 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 151k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 215 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 23k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-05-31 | Expenditure | USD 425 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 37k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 6 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 1,410 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 16k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 106k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 44k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 78k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 6,765 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 329k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 18k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 24k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 352 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 23 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 55k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 6,169 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 265 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 4,778 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 340k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 1,132 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 13k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 16k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 29k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 4,428 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 118k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 1,994 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 17k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 2,836 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 1,332 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD 16k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 2,634 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 294k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 255k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 2,655 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD -9,037 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 41k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-04-30 | Expenditure | USD 25k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 121k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-07-31 | Expenditure | USD 11k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD -12k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 143k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-04-30 | Expenditure | USD 8,199 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-09-30 | Expenditure | USD 25k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 150k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 13k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 1,914 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 19k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-05-31 | Expenditure | USD 2,009 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 920 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-09-30 | Expenditure | USD 13k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 4,115 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 1.00m | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 45k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 336k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 3,323 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 81k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-07-31 | Expenditure | USD -574 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 66k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 47k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 1,323 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 19k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 9,156 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-09-30 | Expenditure | USD 2,962 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 23k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-07-31 | Expenditure | USD -90k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 77k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-05-31 | Expenditure | USD 162k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 42k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 2,781 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 220k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 22k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 23k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 103k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD -7,887 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 74k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 6,571 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 333k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-04-30 | Expenditure | USD 4,824 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD 33k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 8,288 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 114k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-09-30 | Expenditure | USD 46k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 1,781 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD 2,891 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 29k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD 919 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 67k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 18k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 10k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 90k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 84k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 5,988 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 4,583 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 65k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 3,070 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD -407 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 1,400 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD -21k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD -23 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 1,432 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 399k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 8,193 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 50k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD 92k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD -283k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 1,298 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-08-31 | Expenditure | USD 27k | OUTPUT 1.2: MNCH PROGRAMME | new | |
| 2026-03-31 | Expenditure | USD 1 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-05-31 | Expenditure | USD 747 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 1,053 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 310k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 1.58m | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 674k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 645k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 20k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 2,940 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 36k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 50k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 64k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 62k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 394k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 7,702 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 35k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 34k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-04-30 | Expenditure | USD 11k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-05-31 | Expenditure | USD 1,620 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-12-31 | Expenditure | USD -2,836 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 7,880 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 1,450 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 78 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 12k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 5,783 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-07-31 | Expenditure | USD 19k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-09-30 | Expenditure | USD 5,887 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 7,554 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD 247k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD -8,806 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-11-30 | Expenditure | USD 190k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 42k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 10k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 265 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-08-31 | Expenditure | USD 7,899 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 934k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Expenditure | USD 216k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2024-12-31 | Expenditure | USD 25k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 102k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD -35k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-05-31 | Expenditure | USD 3,159 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 65k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD 9 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 1,085 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 120k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 22k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-08-31 | Expenditure | USD 162 | OUTPUT 1.2: MNCH PROGRAMME | new | |
| 2025-03-31 | Expenditure | USD 23k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 20k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-04-30 | Expenditure | USD 182k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-10-31 | Expenditure | USD 24k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-01-31 | Expenditure | USD 4,817 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 26k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-06-30 | Expenditure | USD 62k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 79k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-03-31 | Expenditure | USD 5,720 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-04-30 | Expenditure | USD 2,275 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2025-02-28 | Expenditure | USD 5,856 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-02-28 | Expenditure | USD 1,955 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD 11k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 40k | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-06-30 | Expenditure | USD -9,648 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-01-31 | Expenditure | USD 9,037 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2026-03-31 | Expenditure | USD 9,648 | OUTPUT 1.2: MNCH PROGRAMME | ||
| 2023-12-31 | Disbursement | USD 716 | MINISTRY OF HEALTH POPULATION SECTOR PROGRAMME | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 6,046 | MINISTRY OF PUBLIC HEALTH AND POPULATION PRIMARY HEALTH CARE ADEN | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 9,088 | HEALTH OFFICE ABYAN | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Disbursement | USD 2,040 | HEALTH AND POPULATION OFFICE HADRAMOUT ALWADI AND ALSAHRAA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 17k | HEALTH OFFICE AND POPULATION SHABWA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 7,441 | HEALTH OFFICE TAIZ GOVERNORATE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Disbursement | USD 3,667 | PUBLIC HEALTH AND POPULATION OFFICE OF HODEIDA GOVERNORATE PHPOHG | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 24k | HEALTH OFFICE AND POPULATION IBB | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 35k | HEALTH OFFICE TAIZ GOVERNORATE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 27k | HADRMOUT HEALTH OFFICE AL SAHEL MUKALA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 15k | HEALTH OFFICE MARIB | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 21k | HEALTH OFFICE ABYAN | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Disbursement | USD 6,120 | HEALTH AND POPULATION OFFICE SUQUTRA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 9,826 | ADEN HEALTH OFFICE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 880 | HADRMOUT HEALTH OFFICE AL SAHEL MUKALA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Disbursement | USD 5,514 | ADEN HEALTH OFFICE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Disbursement | USD 7,691 | HEALTH AND POPULATION OFFICE ALMAHRAH | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Disbursement | USD 8,433 | HADRMOUT HEALTH OFFICE AL SAHEL MUKALA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 14k | PUBLIC HEALTH AND POPULATION OFFICE LAHEJ | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 6,269 | HEALTH AND ENVIRONMENT OFFICE RIMA GOV | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 4,965 | PUBLIC HEALTH AND POPULATION OFFICE OF HODEIDA GOVERNORATE PHPOHG | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 7,956 | ADDALEE HEALTH OFFICE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 21k | HEALTH AND POPULATION OFFICE ALMAHRAH | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Disbursement | USD 3,480 | HEALTH OFFICE AND POPULATION SHABWA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 12k | TAIZ HEALTH AND POPULATION OFFICE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 11k | ADEN HEALTH OFFICE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 24k | GENERAL HEALTH OFFICE HAJJA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Incoming commitment | USD 1.77m | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Incoming commitment | USD 171k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Incoming commitment | USD 264k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 5,900 | HEALTH AND POP GEN OFFICE MAHWIT | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 11k | HEALTH AND POPULATION OFFICE SUQUTRA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 12k | HEALTH OFFICE AL JAWF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 21k | HEALTH AND POPULATION OFFICE HADRAMOUT ALWADI AND ALSAHRAA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 42k | TAIZ HEALTH AND POPULATION OFFICE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 3,466 | HEALTH OFFICE AND POPULATION SHABWA | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 2,836 | AL DHALE A GENERAL HEALTH OFFICE MINISTRY OF PUBLIC HEALTH AND | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 8,686 | PUBLIC HEALTH AND POPULATION OFFICE LAHEJ | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 49k | HEALTH OFFICE AND POPULATION IBB | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Disbursement | USD 2,202 | TAIZ HEALTH AND POPULATION OFFICE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Disbursement | USD 16k | PUBLIC HEALTH AND POPULATION OFFICE OF HODEIDA GOVERNORATE PHPOHG | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 52k | HEALTH AND ENVIRONMENT OFFICE HODEIDAH BRANCH | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Disbursement | USD 12k | ADDALEE HEALTH OFFICE | OUTPUT 1.2: MNCH PROGRAMME | |
| 2026-08-31 | Incoming commitment | USD 182k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | new |
| 2025-12-31 | Incoming commitment | USD 44k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2026-08-31 | Incoming commitment | USD 1.51m | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | new |
| 2025-12-31 | Incoming commitment | USD 793 | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Incoming commitment | USD 87k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Incoming commitment | USD 169k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2026-08-31 | Incoming commitment | USD 754k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | new |
| 2024-12-31 | Incoming commitment | USD 137k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Incoming commitment | USD 969k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2024-12-31 | Incoming commitment | USD 2.14m | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2023-12-31 | Incoming commitment | USD 133k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2025-12-31 | Incoming commitment | USD 469k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | |
| 2026-07-31 | Incoming commitment | USD 182k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming commitment | USD 1.51m | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming commitment | USD 54k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming commitment | USD 1 | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming commitment | USD 170k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming commitment | USD 530k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming commitment | USD 22k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming commitment | USD 1,000 | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming commitment | USD 11k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 182k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 1.51m | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 54k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 1 | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 170k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 530k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 22k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 1,000 | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Outgoing commitment | USD 11k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 22k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 530k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 1,000 | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 170k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 54k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 11k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 1.51m | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 182k | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
| 2026-07-31 | Incoming funds | USD 1 | UNICEF | OUTPUT 1.2: MNCH PROGRAMME | removed |
Showing 300 of 402. The API returns all of them.
Struck-through rows were in the previous version, last seen 2026-09-27 04:26 UTC, and are not in the current file.