United Nations Industrial Development Organization (UNIDO) / unido-activity-bolivia-plurinational-state-of

Environmentally sound management of polychlorinated biphenyl (PCB) - containing equipment and wastes and upgrade of technical expertise in Bolivia

XM-DAC-41123-PROJECT-140296

USD 1.96mdeclared budget
USD 1.96mdisbursed and spent, 261 of 522 transactions
Closedstatus
31 Dec 2022planned end

Budget over time

— declared budget (USD)   - - disbursed and spent   ○ value changed
Reporting organisation
United Nations Industrial Development Organization
Start
01 Feb 2015 (planned)
Countries
—
Sectors
321 · OECD DAC 3-digit
Funded by
GEF - Global Environment Facility
Participating
United Nations Industrial Development Organization (implementing); GEF - Global Environment Facility (funding)
Versions seen
2 since 26 Sept 2026 · last checked 2026-10-03 02:36 UTC

Changes

  1. 2026-10-03
    Budget changed

Budgets

PeriodTypeValueRecord
2015-01-01 → 2015-12-31originalUSD 20knew since 02 Oct 2026
2016-01-01 → 2016-12-31originalUSD 440knew since 02 Oct 2026
2017-01-01 → 2017-12-31originalUSD 106knew since 02 Oct 2026
2018-01-01 → 2018-12-31originalUSD 44knew since 02 Oct 2026
2019-01-01 → 2019-12-31originalUSD 62knew since 02 Oct 2026
2020-01-01 → 2020-12-31originalUSD 106knew since 02 Oct 2026
2021-01-01 → 2021-12-31originalUSD 501knew since 02 Oct 2026
2022-01-01 → 2022-12-31originalUSD 676knew since 02 Oct 2026
2023-01-01 → 2023-12-31originalUSD 22new since 02 Oct 2026
2024-01-01 → 2024-12-31originalUSD 209new since 02 Oct 2026

Transactions

DateTypeValueToNoteRecord
2015-01-31Incoming fundsUSD 100kMonitoring and Evaluation Framework
2015-01-31ExpenditureUSD 0Monitoring and Evaluation Framework
2015-01-31Incoming fundsUSD 150kProject Management Costs
2015-01-31ExpenditureUSD 0Project Management Costs
2015-01-31Incoming fundsUSD 1.55m2. ESM of PCBs / Investment
2015-01-31ExpenditureUSD 02. ESM of PCBs / Investment
2015-01-31Incoming fundsUSD 200k1. Regulatory and Institutional Capacity
2015-01-31ExpenditureUSD 01. Regulatory and Institutional Capacity
2015-04-30Incoming fundsUSD 02. ESM of PCBs / Investment
2015-04-30ExpenditureUSD 14k2. ESM of PCBs / Investment
2015-05-31Incoming fundsUSD 02. ESM of PCBs / Investment
2015-05-31ExpenditureUSD 362. ESM of PCBs / Investment
2015-06-30Incoming fundsUSD 02. ESM of PCBs / Investment
2015-06-30ExpenditureUSD 92. ESM of PCBs / Investment
2015-07-31Incoming fundsUSD 02. ESM of PCBs / Investment
2015-07-31ExpenditureUSD 342. ESM of PCBs / Investment
2015-08-31Incoming fundsUSD 02. ESM of PCBs / Investment
2015-08-31ExpenditureUSD 152. ESM of PCBs / Investment
2015-09-30Incoming fundsUSD 02. ESM of PCBs / Investment
2015-09-30ExpenditureUSD 652. ESM of PCBs / Investment
2015-10-31Incoming fundsUSD 02. ESM of PCBs / Investment
2015-10-31ExpenditureUSD 3,4672. ESM of PCBs / Investment
2015-10-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2015-10-31ExpenditureUSD 2,7871. Regulatory and Institutional Capacity
2015-11-30Incoming fundsUSD 4,7242. ESM of PCBs / Investment
2015-11-30ExpenditureUSD -32. ESM of PCBs / Investment
2015-11-30Incoming fundsUSD -4,7241. Regulatory and Institutional Capacity
2015-11-30ExpenditureUSD -191. Regulatory and Institutional Capacity
2015-12-31Incoming fundsUSD 02. ESM of PCBs / Investment
2015-12-31ExpenditureUSD 3062. ESM of PCBs / Investment
2015-12-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2015-12-31ExpenditureUSD 81. Regulatory and Institutional Capacity
2016-01-31Incoming fundsUSD 02. ESM of PCBs / Investment
2016-01-31ExpenditureUSD 13k2. ESM of PCBs / Investment
2016-01-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-01-31ExpenditureUSD 2,7521. Regulatory and Institutional Capacity
2016-02-29Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-02-29ExpenditureUSD 32k1. Regulatory and Institutional Capacity
2016-02-29Incoming fundsUSD 02. ESM of PCBs / Investment
2016-02-29ExpenditureUSD 29k2. ESM of PCBs / Investment
2016-03-31Incoming fundsUSD 02. ESM of PCBs / Investment
2016-03-31ExpenditureUSD 1132. ESM of PCBs / Investment
2016-03-31Incoming fundsUSD 0Project Management Costs
2016-03-31ExpenditureUSD 1,502Project Management Costs
2016-03-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-03-31ExpenditureUSD 2,7221. Regulatory and Institutional Capacity
2016-04-30Incoming fundsUSD 0Project Management Costs
2016-04-30ExpenditureUSD 5Project Management Costs
2016-04-30Incoming fundsUSD 02. ESM of PCBs / Investment
2016-04-30ExpenditureUSD 2102. ESM of PCBs / Investment
2016-04-30Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-04-30ExpenditureUSD 1191. Regulatory and Institutional Capacity
2016-05-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-05-31ExpenditureUSD 411. Regulatory and Institutional Capacity
2016-05-31Incoming fundsUSD 0Project Management Costs
2016-05-31ExpenditureUSD 6Project Management Costs
2016-05-31Incoming fundsUSD 02. ESM of PCBs / Investment
2016-05-31ExpenditureUSD 1532. ESM of PCBs / Investment
2016-06-30Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-06-30ExpenditureUSD 851. Regulatory and Institutional Capacity
2016-06-30Incoming fundsUSD 0Project Management Costs
2016-06-30ExpenditureUSD 5Project Management Costs
2016-06-30Incoming fundsUSD 02. ESM of PCBs / Investment
2016-06-30ExpenditureUSD 2502. ESM of PCBs / Investment
2016-07-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-07-31ExpenditureUSD 601. Regulatory and Institutional Capacity
2016-07-31Incoming fundsUSD 0Project Management Costs
2016-07-31ExpenditureUSD 1Project Management Costs
2016-07-31Incoming fundsUSD 02. ESM of PCBs / Investment
2016-07-31ExpenditureUSD 1262. ESM of PCBs / Investment
2016-08-31Incoming fundsUSD -29kProject Management Costs
2016-08-31ExpenditureUSD 3Project Management Costs
2016-08-31Incoming fundsUSD 5,4361. Regulatory and Institutional Capacity
2016-08-31ExpenditureUSD 1071. Regulatory and Institutional Capacity
2016-08-31Incoming fundsUSD 12kMonitoring and Evaluation Framework
2016-08-31ExpenditureUSD 0Monitoring and Evaluation Framework
2016-08-31Incoming fundsUSD 12k2. ESM of PCBs / Investment
2016-08-31ExpenditureUSD 1082. ESM of PCBs / Investment
2016-09-30Incoming fundsUSD 02. ESM of PCBs / Investment
2016-09-30ExpenditureUSD 1142. ESM of PCBs / Investment
2016-09-30Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-09-30ExpenditureUSD 241. Regulatory and Institutional Capacity
2016-09-30Incoming fundsUSD 0Project Management Costs
2016-09-30ExpenditureUSD 2Project Management Costs
2016-10-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-10-31ExpenditureUSD 171. Regulatory and Institutional Capacity
2016-10-31Incoming fundsUSD 02. ESM of PCBs / Investment
2016-10-31ExpenditureUSD 432. ESM of PCBs / Investment
2016-11-30Incoming fundsUSD 02. ESM of PCBs / Investment
2016-11-30ExpenditureUSD 202. ESM of PCBs / Investment
2016-11-30Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-11-30ExpenditureUSD 451. Regulatory and Institutional Capacity
2016-12-31Incoming fundsUSD 02. ESM of PCBs / Investment
2016-12-31ExpenditureUSD 216k2. ESM of PCBs / Investment
2016-12-31Incoming fundsUSD 0Project Management Costs
2016-12-31ExpenditureUSD 8,962Project Management Costs
2016-12-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2016-12-31ExpenditureUSD 133k1. Regulatory and Institutional Capacity
2017-01-31Incoming fundsUSD 0Project Management Costs
2017-01-31ExpenditureUSD 36kProject Management Costs
2017-02-28Incoming fundsUSD 0Project Management Costs
2017-02-28ExpenditureUSD 96Project Management Costs
2017-03-31Incoming fundsUSD 0Project Management Costs
2017-03-31ExpenditureUSD 96Project Management Costs
2017-04-30Incoming fundsUSD 02. ESM of PCBs / Investment
2017-04-30ExpenditureUSD -3232. ESM of PCBs / Investment
2017-04-30Incoming fundsUSD 0Project Management Costs
2017-04-30ExpenditureUSD 196Project Management Costs
2017-05-31Incoming fundsUSD 0Project Management Costs
2017-05-31ExpenditureUSD 336Project Management Costs
2017-06-30Incoming fundsUSD 0Project Management Costs
2017-06-30ExpenditureUSD 334Project Management Costs
2017-07-31Incoming fundsUSD 0Project Management Costs
2017-07-31ExpenditureUSD 382Project Management Costs
2017-08-31Incoming fundsUSD 0Project Management Costs
2017-08-31ExpenditureUSD 493Project Management Costs
2017-08-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2017-08-31ExpenditureUSD 1,1031. Regulatory and Institutional Capacity
2017-09-30Incoming fundsUSD 10kProject Management Costs
2017-09-30ExpenditureUSD 544Project Management Costs
2017-09-30Incoming fundsUSD 23k1. Regulatory and Institutional Capacity
2017-09-30ExpenditureUSD 3,1991. Regulatory and Institutional Capacity
2017-09-30Incoming fundsUSD 0Monitoring and Evaluation Framework
2017-09-30ExpenditureUSD 4,196Monitoring and Evaluation Framework
2017-09-30Incoming fundsUSD -33k2. ESM of PCBs / Investment
2017-09-30ExpenditureUSD 02. ESM of PCBs / Investment
2017-10-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2017-10-31ExpenditureUSD 8,3611. Regulatory and Institutional Capacity
2017-10-31Incoming fundsUSD 0Project Management Costs
2017-10-31ExpenditureUSD 489Project Management Costs
2017-10-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2017-10-31ExpenditureUSD 30Monitoring and Evaluation Framework
2017-11-30Incoming fundsUSD 01. Regulatory and Institutional Capacity
2017-11-30ExpenditureUSD 6311. Regulatory and Institutional Capacity
2017-11-30Incoming fundsUSD 0Project Management Costs
2017-11-30ExpenditureUSD 444Project Management Costs
2017-11-30Incoming fundsUSD 0Monitoring and Evaluation Framework
2017-11-30ExpenditureUSD -39Monitoring and Evaluation Framework
2017-11-30Incoming fundsUSD 02. ESM of PCBs / Investment
2017-11-30ExpenditureUSD 50k2. ESM of PCBs / Investment
2017-12-31Incoming fundsUSD 0Project Management Costs
2017-12-31ExpenditureUSD -2,074Project Management Costs
2017-12-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2017-12-31ExpenditureUSD 1261. Regulatory and Institutional Capacity
2017-12-31Incoming fundsUSD 02. ESM of PCBs / Investment
2017-12-31ExpenditureUSD 1232. ESM of PCBs / Investment
2017-12-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2017-12-31ExpenditureUSD 301Monitoring and Evaluation Framework
2018-01-31Incoming fundsUSD 0Project Management Costs
2018-01-31ExpenditureUSD 40kProject Management Costs
2018-01-31Incoming fundsUSD 02. ESM of PCBs / Investment
2018-01-31ExpenditureUSD 1902. ESM of PCBs / Investment
2018-01-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-01-31ExpenditureUSD 9,826Monitoring and Evaluation Framework
2018-02-28Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-02-28ExpenditureUSD 116Monitoring and Evaluation Framework
2018-02-28Incoming fundsUSD 0Project Management Costs
2018-02-28ExpenditureUSD -33kProject Management Costs
2018-02-28Incoming fundsUSD 02. ESM of PCBs / Investment
2018-02-28ExpenditureUSD 842. ESM of PCBs / Investment
2018-02-28Incoming fundsUSD 01. Regulatory and Institutional Capacity
2018-02-28ExpenditureUSD 531. Regulatory and Institutional Capacity
2018-03-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-03-31ExpenditureUSD 192Monitoring and Evaluation Framework
2018-03-31Incoming fundsUSD 0Project Management Costs
2018-03-31ExpenditureUSD 106Project Management Costs
2018-04-30Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-04-30ExpenditureUSD 147Monitoring and Evaluation Framework
2018-04-30Incoming fundsUSD 02. ESM of PCBs / Investment
2018-04-30ExpenditureUSD 7962. ESM of PCBs / Investment
2018-05-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-05-31ExpenditureUSD 117Monitoring and Evaluation Framework
2018-05-31Incoming fundsUSD 02. ESM of PCBs / Investment
2018-05-31ExpenditureUSD 532. ESM of PCBs / Investment
2018-06-30Incoming fundsUSD 02. ESM of PCBs / Investment
2018-06-30ExpenditureUSD 23k2. ESM of PCBs / Investment
2018-06-30Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-06-30ExpenditureUSD 84Monitoring and Evaluation Framework
2018-07-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-07-31ExpenditureUSD 33kMonitoring and Evaluation Framework
2018-07-31Incoming fundsUSD 02. ESM of PCBs / Investment
2018-07-31ExpenditureUSD 18k2. ESM of PCBs / Investment
2018-08-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2018-08-31ExpenditureUSD 2801. Regulatory and Institutional Capacity
2018-08-31Incoming fundsUSD 02. ESM of PCBs / Investment
2018-08-31ExpenditureUSD -33k2. ESM of PCBs / Investment
2018-08-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-08-31ExpenditureUSD -26kMonitoring and Evaluation Framework
2018-09-30Incoming fundsUSD -5,978Project Management Costs
2018-09-30ExpenditureUSD 0Project Management Costs
2018-09-30Incoming fundsUSD 2,646Monitoring and Evaluation Framework
2018-09-30ExpenditureUSD 453Monitoring and Evaluation Framework
2018-09-30Incoming fundsUSD 3,3322. ESM of PCBs / Investment
2018-09-30ExpenditureUSD 2522. ESM of PCBs / Investment
2018-09-30Incoming fundsUSD 01. Regulatory and Institutional Capacity
2018-09-30ExpenditureUSD 2801. Regulatory and Institutional Capacity
2018-10-31Incoming fundsUSD 0Project Management Costs
2018-10-31ExpenditureUSD 7,127Project Management Costs
2018-10-31Incoming fundsUSD 02. ESM of PCBs / Investment
2018-10-31ExpenditureUSD 3212. ESM of PCBs / Investment
2018-10-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-10-31ExpenditureUSD 109Monitoring and Evaluation Framework
2018-10-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2018-10-31ExpenditureUSD -2771. Regulatory and Institutional Capacity
2018-11-30Incoming fundsUSD 01. Regulatory and Institutional Capacity
2018-11-30ExpenditureUSD 1,1141. Regulatory and Institutional Capacity
2018-11-30Incoming fundsUSD 0Project Management Costs
2018-11-30ExpenditureUSD 8Project Management Costs
2018-11-30Incoming fundsUSD 02. ESM of PCBs / Investment
2018-11-30ExpenditureUSD 632. ESM of PCBs / Investment
2018-11-30Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-11-30ExpenditureUSD 84Monitoring and Evaluation Framework
2018-12-31Incoming fundsUSD 0Project Management Costs
2018-12-31ExpenditureUSD 824Project Management Costs
2018-12-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2018-12-31ExpenditureUSD 431Monitoring and Evaluation Framework
2018-12-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2018-12-31ExpenditureUSD 4671. Regulatory and Institutional Capacity
2019-01-31Incoming fundsUSD 0Project Management Costs
2019-01-31ExpenditureUSD 12kProject Management Costs
2019-01-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-01-31ExpenditureUSD 13kMonitoring and Evaluation Framework
2019-01-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2019-01-31ExpenditureUSD -3711. Regulatory and Institutional Capacity
2019-02-28Incoming fundsUSD 0Project Management Costs
2019-02-28ExpenditureUSD 27Project Management Costs
2019-02-28Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-02-28ExpenditureUSD 103Monitoring and Evaluation Framework
2019-02-28Incoming fundsUSD 01. Regulatory and Institutional Capacity
2019-02-28ExpenditureUSD 591. Regulatory and Institutional Capacity
2019-03-31Incoming fundsUSD 0Project Management Costs
2019-03-31ExpenditureUSD 106Project Management Costs
2019-03-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-03-31ExpenditureUSD 98Monitoring and Evaluation Framework
2019-04-30Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-04-30ExpenditureUSD 84Monitoring and Evaluation Framework
2019-04-30Incoming fundsUSD 02. ESM of PCBs / Investment
2019-04-30ExpenditureUSD 3,0952. ESM of PCBs / Investment
2019-04-30Incoming fundsUSD 0Project Management Costs
2019-04-30ExpenditureUSD 19kProject Management Costs
2019-04-30Incoming fundsUSD 01. Regulatory and Institutional Capacity
2019-04-30ExpenditureUSD 3,0951. Regulatory and Institutional Capacity
2019-05-31Incoming fundsUSD 0Project Management Costs
2019-05-31ExpenditureUSD 134Project Management Costs
2019-05-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2019-05-31ExpenditureUSD 111. Regulatory and Institutional Capacity
2019-05-31Incoming fundsUSD 02. ESM of PCBs / Investment
2019-05-31ExpenditureUSD 112. ESM of PCBs / Investment
2019-05-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-05-31ExpenditureUSD 68Monitoring and Evaluation Framework
2019-06-30Incoming fundsUSD 0Project Management Costs
2019-06-30ExpenditureUSD 123Project Management Costs
2019-06-30Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-06-30ExpenditureUSD 65Monitoring and Evaluation Framework
2019-07-31Incoming fundsUSD 0Project Management Costs
2019-07-31ExpenditureUSD 172Project Management Costs
2019-07-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-07-31ExpenditureUSD 96Monitoring and Evaluation Framework
2019-08-31Incoming fundsUSD 0Project Management Costs
2019-08-31ExpenditureUSD 52Project Management Costs
2019-08-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-08-31ExpenditureUSD 73Monitoring and Evaluation Framework
2019-09-30Incoming fundsUSD -4Project Management Costs
2019-09-30ExpenditureUSD 109Project Management Costs
2019-09-30Incoming fundsUSD 4Monitoring and Evaluation Framework
2019-09-30ExpenditureUSD 4,710Monitoring and Evaluation Framework
2019-10-31Incoming fundsUSD 32kProject Management Costs
2019-10-31ExpenditureUSD 7,540Project Management Costs
2019-10-31Incoming fundsUSD -38k2. ESM of PCBs / Investment
2019-10-31ExpenditureUSD 02. ESM of PCBs / Investment
2019-10-31Incoming fundsUSD 2871. Regulatory and Institutional Capacity
2019-10-31ExpenditureUSD 01. Regulatory and Institutional Capacity
2019-10-31Incoming fundsUSD 4,879Monitoring and Evaluation Framework
2019-10-31ExpenditureUSD 297Monitoring and Evaluation Framework
2019-11-30Incoming fundsUSD 0Monitoring and Evaluation Framework
2019-11-30ExpenditureUSD 190Monitoring and Evaluation Framework
2019-11-30Incoming fundsUSD 0Project Management Costs
2019-11-30ExpenditureUSD -3,030Project Management Costs
2019-12-31Incoming fundsUSD -59Project Management Costs
2019-12-31ExpenditureUSD 799Project Management Costs
2019-12-31Incoming fundsUSD 02. ESM of PCBs / Investment
2019-12-31ExpenditureUSD 672. ESM of PCBs / Investment
2019-12-31Incoming fundsUSD 01. Regulatory and Institutional Capacity
2019-12-31ExpenditureUSD 521. Regulatory and Institutional Capacity
2019-12-31Incoming fundsUSD 59Monitoring and Evaluation Framework
2019-12-31ExpenditureUSD 1,032Monitoring and Evaluation Framework
2020-01-31Incoming fundsUSD 0Project Management Costs
2020-01-31ExpenditureUSD 21kProject Management Costs
2020-01-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2020-01-31ExpenditureUSD 14kMonitoring and Evaluation Framework
2020-02-29Incoming fundsUSD 0Project Management Costs
2020-02-29ExpenditureUSD 158Project Management Costs
2020-02-29Incoming fundsUSD 0Monitoring and Evaluation Framework
2020-02-29ExpenditureUSD 119Monitoring and Evaluation Framework
2020-03-31Incoming fundsUSD 0Project Management Costs
2020-03-31ExpenditureUSD 178Project Management Costs
2020-03-31Incoming fundsUSD 0Monitoring and Evaluation Framework
2020-03-31ExpenditureUSD 158Monitoring and Evaluation Framework
2020-04-30Incoming fundsUSD 0Project Management Costs
2020-04-30ExpenditureUSD 56Project Management Costs

Showing 300 of 522. The API returns all of them.

Struck-through rows were in the previous version, last seen 2026-10-02 02:28 UTC, and are not in the current file.

Environmentally sound management of polychlorinated biphenyl (PCB) - containing equipment and wastes and upgrade of technical expertise in Bolivia · OpenAid Ledger