United Nations Industrial Development Organization (UNIDO) / unido-activity-bolivia-plurinational-state-of
Environmentally sound management of polychlorinated biphenyl (PCB) - containing equipment and wastes and upgrade of technical expertise in Bolivia
XM-DAC-41123-PROJECT-140296
USD 1.96mdeclared budget
USD 1.96mdisbursed and spent, 261 of 522 transactions
Closedstatus
31 Dec 2022planned end
Budget over time
- Reporting organisation
- United Nations Industrial Development Organization
- Start
- 01 Feb 2015 (planned)
- Countries
- —
- Sectors
- 321 · OECD DAC 3-digit
- Funded by
- GEF - Global Environment Facility
- Participating
- United Nations Industrial Development Organization (implementing); GEF - Global Environment Facility (funding)
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-10-03 02:36 UTC
Changes
- 2026-10-03Budget changed
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2015-01-01 → 2015-12-31 | original | USD 20k | new since 02 Oct 2026 |
| 2016-01-01 → 2016-12-31 | original | USD 440k | new since 02 Oct 2026 |
| 2017-01-01 → 2017-12-31 | original | USD 106k | new since 02 Oct 2026 |
| 2018-01-01 → 2018-12-31 | original | USD 44k | new since 02 Oct 2026 |
| 2019-01-01 → 2019-12-31 | original | USD 62k | new since 02 Oct 2026 |
| 2020-01-01 → 2020-12-31 | original | USD 106k | new since 02 Oct 2026 |
| 2021-01-01 → 2021-12-31 | original | USD 501k | new since 02 Oct 2026 |
| 2022-01-01 → 2022-12-31 | original | USD 676k | new since 02 Oct 2026 |
| 2023-01-01 → 2023-12-31 | original | USD 22 | new since 02 Oct 2026 |
| 2024-01-01 → 2024-12-31 | original | USD 209 | new since 02 Oct 2026 |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2015-01-31 | Incoming funds | USD 100k | Monitoring and Evaluation Framework | ||
| 2015-01-31 | Expenditure | USD 0 | Monitoring and Evaluation Framework | ||
| 2015-01-31 | Incoming funds | USD 150k | Project Management Costs | ||
| 2015-01-31 | Expenditure | USD 0 | Project Management Costs | ||
| 2015-01-31 | Incoming funds | USD 1.55m | 2. ESM of PCBs / Investment | ||
| 2015-01-31 | Expenditure | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-01-31 | Incoming funds | USD 200k | 1. Regulatory and Institutional Capacity | ||
| 2015-01-31 | Expenditure | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2015-04-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-04-30 | Expenditure | USD 14k | 2. ESM of PCBs / Investment | ||
| 2015-05-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-05-31 | Expenditure | USD 36 | 2. ESM of PCBs / Investment | ||
| 2015-06-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-06-30 | Expenditure | USD 9 | 2. ESM of PCBs / Investment | ||
| 2015-07-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-07-31 | Expenditure | USD 34 | 2. ESM of PCBs / Investment | ||
| 2015-08-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-08-31 | Expenditure | USD 15 | 2. ESM of PCBs / Investment | ||
| 2015-09-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-09-30 | Expenditure | USD 65 | 2. ESM of PCBs / Investment | ||
| 2015-10-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-10-31 | Expenditure | USD 3,467 | 2. ESM of PCBs / Investment | ||
| 2015-10-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2015-10-31 | Expenditure | USD 2,787 | 1. Regulatory and Institutional Capacity | ||
| 2015-11-30 | Incoming funds | USD 4,724 | 2. ESM of PCBs / Investment | ||
| 2015-11-30 | Expenditure | USD -3 | 2. ESM of PCBs / Investment | ||
| 2015-11-30 | Incoming funds | USD -4,724 | 1. Regulatory and Institutional Capacity | ||
| 2015-11-30 | Expenditure | USD -19 | 1. Regulatory and Institutional Capacity | ||
| 2015-12-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2015-12-31 | Expenditure | USD 306 | 2. ESM of PCBs / Investment | ||
| 2015-12-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2015-12-31 | Expenditure | USD 8 | 1. Regulatory and Institutional Capacity | ||
| 2016-01-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-01-31 | Expenditure | USD 13k | 2. ESM of PCBs / Investment | ||
| 2016-01-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-01-31 | Expenditure | USD 2,752 | 1. Regulatory and Institutional Capacity | ||
| 2016-02-29 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-02-29 | Expenditure | USD 32k | 1. Regulatory and Institutional Capacity | ||
| 2016-02-29 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-02-29 | Expenditure | USD 29k | 2. ESM of PCBs / Investment | ||
| 2016-03-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-03-31 | Expenditure | USD 113 | 2. ESM of PCBs / Investment | ||
| 2016-03-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2016-03-31 | Expenditure | USD 1,502 | Project Management Costs | ||
| 2016-03-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-03-31 | Expenditure | USD 2,722 | 1. Regulatory and Institutional Capacity | ||
| 2016-04-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2016-04-30 | Expenditure | USD 5 | Project Management Costs | ||
| 2016-04-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-04-30 | Expenditure | USD 210 | 2. ESM of PCBs / Investment | ||
| 2016-04-30 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-04-30 | Expenditure | USD 119 | 1. Regulatory and Institutional Capacity | ||
| 2016-05-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-05-31 | Expenditure | USD 41 | 1. Regulatory and Institutional Capacity | ||
| 2016-05-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2016-05-31 | Expenditure | USD 6 | Project Management Costs | ||
| 2016-05-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-05-31 | Expenditure | USD 153 | 2. ESM of PCBs / Investment | ||
| 2016-06-30 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-06-30 | Expenditure | USD 85 | 1. Regulatory and Institutional Capacity | ||
| 2016-06-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2016-06-30 | Expenditure | USD 5 | Project Management Costs | ||
| 2016-06-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-06-30 | Expenditure | USD 250 | 2. ESM of PCBs / Investment | ||
| 2016-07-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-07-31 | Expenditure | USD 60 | 1. Regulatory and Institutional Capacity | ||
| 2016-07-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2016-07-31 | Expenditure | USD 1 | Project Management Costs | ||
| 2016-07-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-07-31 | Expenditure | USD 126 | 2. ESM of PCBs / Investment | ||
| 2016-08-31 | Incoming funds | USD -29k | Project Management Costs | ||
| 2016-08-31 | Expenditure | USD 3 | Project Management Costs | ||
| 2016-08-31 | Incoming funds | USD 5,436 | 1. Regulatory and Institutional Capacity | ||
| 2016-08-31 | Expenditure | USD 107 | 1. Regulatory and Institutional Capacity | ||
| 2016-08-31 | Incoming funds | USD 12k | Monitoring and Evaluation Framework | ||
| 2016-08-31 | Expenditure | USD 0 | Monitoring and Evaluation Framework | ||
| 2016-08-31 | Incoming funds | USD 12k | 2. ESM of PCBs / Investment | ||
| 2016-08-31 | Expenditure | USD 108 | 2. ESM of PCBs / Investment | ||
| 2016-09-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-09-30 | Expenditure | USD 114 | 2. ESM of PCBs / Investment | ||
| 2016-09-30 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-09-30 | Expenditure | USD 24 | 1. Regulatory and Institutional Capacity | ||
| 2016-09-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2016-09-30 | Expenditure | USD 2 | Project Management Costs | ||
| 2016-10-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-10-31 | Expenditure | USD 17 | 1. Regulatory and Institutional Capacity | ||
| 2016-10-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-10-31 | Expenditure | USD 43 | 2. ESM of PCBs / Investment | ||
| 2016-11-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-11-30 | Expenditure | USD 20 | 2. ESM of PCBs / Investment | ||
| 2016-11-30 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-11-30 | Expenditure | USD 45 | 1. Regulatory and Institutional Capacity | ||
| 2016-12-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2016-12-31 | Expenditure | USD 216k | 2. ESM of PCBs / Investment | ||
| 2016-12-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2016-12-31 | Expenditure | USD 8,962 | Project Management Costs | ||
| 2016-12-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2016-12-31 | Expenditure | USD 133k | 1. Regulatory and Institutional Capacity | ||
| 2017-01-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-01-31 | Expenditure | USD 36k | Project Management Costs | ||
| 2017-02-28 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-02-28 | Expenditure | USD 96 | Project Management Costs | ||
| 2017-03-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-03-31 | Expenditure | USD 96 | Project Management Costs | ||
| 2017-04-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2017-04-30 | Expenditure | USD -323 | 2. ESM of PCBs / Investment | ||
| 2017-04-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-04-30 | Expenditure | USD 196 | Project Management Costs | ||
| 2017-05-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-05-31 | Expenditure | USD 336 | Project Management Costs | ||
| 2017-06-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-06-30 | Expenditure | USD 334 | Project Management Costs | ||
| 2017-07-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-07-31 | Expenditure | USD 382 | Project Management Costs | ||
| 2017-08-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-08-31 | Expenditure | USD 493 | Project Management Costs | ||
| 2017-08-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2017-08-31 | Expenditure | USD 1,103 | 1. Regulatory and Institutional Capacity | ||
| 2017-09-30 | Incoming funds | USD 10k | Project Management Costs | ||
| 2017-09-30 | Expenditure | USD 544 | Project Management Costs | ||
| 2017-09-30 | Incoming funds | USD 23k | 1. Regulatory and Institutional Capacity | ||
| 2017-09-30 | Expenditure | USD 3,199 | 1. Regulatory and Institutional Capacity | ||
| 2017-09-30 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2017-09-30 | Expenditure | USD 4,196 | Monitoring and Evaluation Framework | ||
| 2017-09-30 | Incoming funds | USD -33k | 2. ESM of PCBs / Investment | ||
| 2017-09-30 | Expenditure | USD 0 | 2. ESM of PCBs / Investment | ||
| 2017-10-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2017-10-31 | Expenditure | USD 8,361 | 1. Regulatory and Institutional Capacity | ||
| 2017-10-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-10-31 | Expenditure | USD 489 | Project Management Costs | ||
| 2017-10-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2017-10-31 | Expenditure | USD 30 | Monitoring and Evaluation Framework | ||
| 2017-11-30 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2017-11-30 | Expenditure | USD 631 | 1. Regulatory and Institutional Capacity | ||
| 2017-11-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-11-30 | Expenditure | USD 444 | Project Management Costs | ||
| 2017-11-30 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2017-11-30 | Expenditure | USD -39 | Monitoring and Evaluation Framework | ||
| 2017-11-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2017-11-30 | Expenditure | USD 50k | 2. ESM of PCBs / Investment | ||
| 2017-12-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2017-12-31 | Expenditure | USD -2,074 | Project Management Costs | ||
| 2017-12-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2017-12-31 | Expenditure | USD 126 | 1. Regulatory and Institutional Capacity | ||
| 2017-12-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2017-12-31 | Expenditure | USD 123 | 2. ESM of PCBs / Investment | ||
| 2017-12-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2017-12-31 | Expenditure | USD 301 | Monitoring and Evaluation Framework | ||
| 2018-01-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2018-01-31 | Expenditure | USD 40k | Project Management Costs | ||
| 2018-01-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-01-31 | Expenditure | USD 190 | 2. ESM of PCBs / Investment | ||
| 2018-01-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-01-31 | Expenditure | USD 9,826 | Monitoring and Evaluation Framework | ||
| 2018-02-28 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-02-28 | Expenditure | USD 116 | Monitoring and Evaluation Framework | ||
| 2018-02-28 | Incoming funds | USD 0 | Project Management Costs | ||
| 2018-02-28 | Expenditure | USD -33k | Project Management Costs | ||
| 2018-02-28 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-02-28 | Expenditure | USD 84 | 2. ESM of PCBs / Investment | ||
| 2018-02-28 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2018-02-28 | Expenditure | USD 53 | 1. Regulatory and Institutional Capacity | ||
| 2018-03-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-03-31 | Expenditure | USD 192 | Monitoring and Evaluation Framework | ||
| 2018-03-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2018-03-31 | Expenditure | USD 106 | Project Management Costs | ||
| 2018-04-30 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-04-30 | Expenditure | USD 147 | Monitoring and Evaluation Framework | ||
| 2018-04-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-04-30 | Expenditure | USD 796 | 2. ESM of PCBs / Investment | ||
| 2018-05-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-05-31 | Expenditure | USD 117 | Monitoring and Evaluation Framework | ||
| 2018-05-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-05-31 | Expenditure | USD 53 | 2. ESM of PCBs / Investment | ||
| 2018-06-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-06-30 | Expenditure | USD 23k | 2. ESM of PCBs / Investment | ||
| 2018-06-30 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-06-30 | Expenditure | USD 84 | Monitoring and Evaluation Framework | ||
| 2018-07-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-07-31 | Expenditure | USD 33k | Monitoring and Evaluation Framework | ||
| 2018-07-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-07-31 | Expenditure | USD 18k | 2. ESM of PCBs / Investment | ||
| 2018-08-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2018-08-31 | Expenditure | USD 280 | 1. Regulatory and Institutional Capacity | ||
| 2018-08-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-08-31 | Expenditure | USD -33k | 2. ESM of PCBs / Investment | ||
| 2018-08-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-08-31 | Expenditure | USD -26k | Monitoring and Evaluation Framework | ||
| 2018-09-30 | Incoming funds | USD -5,978 | Project Management Costs | ||
| 2018-09-30 | Expenditure | USD 0 | Project Management Costs | ||
| 2018-09-30 | Incoming funds | USD 2,646 | Monitoring and Evaluation Framework | ||
| 2018-09-30 | Expenditure | USD 453 | Monitoring and Evaluation Framework | ||
| 2018-09-30 | Incoming funds | USD 3,332 | 2. ESM of PCBs / Investment | ||
| 2018-09-30 | Expenditure | USD 252 | 2. ESM of PCBs / Investment | ||
| 2018-09-30 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2018-09-30 | Expenditure | USD 280 | 1. Regulatory and Institutional Capacity | ||
| 2018-10-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2018-10-31 | Expenditure | USD 7,127 | Project Management Costs | ||
| 2018-10-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-10-31 | Expenditure | USD 321 | 2. ESM of PCBs / Investment | ||
| 2018-10-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-10-31 | Expenditure | USD 109 | Monitoring and Evaluation Framework | ||
| 2018-10-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2018-10-31 | Expenditure | USD -277 | 1. Regulatory and Institutional Capacity | ||
| 2018-11-30 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2018-11-30 | Expenditure | USD 1,114 | 1. Regulatory and Institutional Capacity | ||
| 2018-11-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2018-11-30 | Expenditure | USD 8 | Project Management Costs | ||
| 2018-11-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2018-11-30 | Expenditure | USD 63 | 2. ESM of PCBs / Investment | ||
| 2018-11-30 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-11-30 | Expenditure | USD 84 | Monitoring and Evaluation Framework | ||
| 2018-12-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2018-12-31 | Expenditure | USD 824 | Project Management Costs | ||
| 2018-12-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2018-12-31 | Expenditure | USD 431 | Monitoring and Evaluation Framework | ||
| 2018-12-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2018-12-31 | Expenditure | USD 467 | 1. Regulatory and Institutional Capacity | ||
| 2019-01-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-01-31 | Expenditure | USD 12k | Project Management Costs | ||
| 2019-01-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-01-31 | Expenditure | USD 13k | Monitoring and Evaluation Framework | ||
| 2019-01-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2019-01-31 | Expenditure | USD -371 | 1. Regulatory and Institutional Capacity | ||
| 2019-02-28 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-02-28 | Expenditure | USD 27 | Project Management Costs | ||
| 2019-02-28 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-02-28 | Expenditure | USD 103 | Monitoring and Evaluation Framework | ||
| 2019-02-28 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2019-02-28 | Expenditure | USD 59 | 1. Regulatory and Institutional Capacity | ||
| 2019-03-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-03-31 | Expenditure | USD 106 | Project Management Costs | ||
| 2019-03-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-03-31 | Expenditure | USD 98 | Monitoring and Evaluation Framework | ||
| 2019-04-30 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-04-30 | Expenditure | USD 84 | Monitoring and Evaluation Framework | ||
| 2019-04-30 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2019-04-30 | Expenditure | USD 3,095 | 2. ESM of PCBs / Investment | ||
| 2019-04-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-04-30 | Expenditure | USD 19k | Project Management Costs | ||
| 2019-04-30 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2019-04-30 | Expenditure | USD 3,095 | 1. Regulatory and Institutional Capacity | ||
| 2019-05-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-05-31 | Expenditure | USD 134 | Project Management Costs | ||
| 2019-05-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2019-05-31 | Expenditure | USD 11 | 1. Regulatory and Institutional Capacity | ||
| 2019-05-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2019-05-31 | Expenditure | USD 11 | 2. ESM of PCBs / Investment | ||
| 2019-05-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-05-31 | Expenditure | USD 68 | Monitoring and Evaluation Framework | ||
| 2019-06-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-06-30 | Expenditure | USD 123 | Project Management Costs | ||
| 2019-06-30 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-06-30 | Expenditure | USD 65 | Monitoring and Evaluation Framework | ||
| 2019-07-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-07-31 | Expenditure | USD 172 | Project Management Costs | ||
| 2019-07-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-07-31 | Expenditure | USD 96 | Monitoring and Evaluation Framework | ||
| 2019-08-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-08-31 | Expenditure | USD 52 | Project Management Costs | ||
| 2019-08-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-08-31 | Expenditure | USD 73 | Monitoring and Evaluation Framework | ||
| 2019-09-30 | Incoming funds | USD -4 | Project Management Costs | ||
| 2019-09-30 | Expenditure | USD 109 | Project Management Costs | ||
| 2019-09-30 | Incoming funds | USD 4 | Monitoring and Evaluation Framework | ||
| 2019-09-30 | Expenditure | USD 4,710 | Monitoring and Evaluation Framework | ||
| 2019-10-31 | Incoming funds | USD 32k | Project Management Costs | ||
| 2019-10-31 | Expenditure | USD 7,540 | Project Management Costs | ||
| 2019-10-31 | Incoming funds | USD -38k | 2. ESM of PCBs / Investment | ||
| 2019-10-31 | Expenditure | USD 0 | 2. ESM of PCBs / Investment | ||
| 2019-10-31 | Incoming funds | USD 287 | 1. Regulatory and Institutional Capacity | ||
| 2019-10-31 | Expenditure | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2019-10-31 | Incoming funds | USD 4,879 | Monitoring and Evaluation Framework | ||
| 2019-10-31 | Expenditure | USD 297 | Monitoring and Evaluation Framework | ||
| 2019-11-30 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2019-11-30 | Expenditure | USD 190 | Monitoring and Evaluation Framework | ||
| 2019-11-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2019-11-30 | Expenditure | USD -3,030 | Project Management Costs | ||
| 2019-12-31 | Incoming funds | USD -59 | Project Management Costs | ||
| 2019-12-31 | Expenditure | USD 799 | Project Management Costs | ||
| 2019-12-31 | Incoming funds | USD 0 | 2. ESM of PCBs / Investment | ||
| 2019-12-31 | Expenditure | USD 67 | 2. ESM of PCBs / Investment | ||
| 2019-12-31 | Incoming funds | USD 0 | 1. Regulatory and Institutional Capacity | ||
| 2019-12-31 | Expenditure | USD 52 | 1. Regulatory and Institutional Capacity | ||
| 2019-12-31 | Incoming funds | USD 59 | Monitoring and Evaluation Framework | ||
| 2019-12-31 | Expenditure | USD 1,032 | Monitoring and Evaluation Framework | ||
| 2020-01-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2020-01-31 | Expenditure | USD 21k | Project Management Costs | ||
| 2020-01-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2020-01-31 | Expenditure | USD 14k | Monitoring and Evaluation Framework | ||
| 2020-02-29 | Incoming funds | USD 0 | Project Management Costs | ||
| 2020-02-29 | Expenditure | USD 158 | Project Management Costs | ||
| 2020-02-29 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2020-02-29 | Expenditure | USD 119 | Monitoring and Evaluation Framework | ||
| 2020-03-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2020-03-31 | Expenditure | USD 178 | Project Management Costs | ||
| 2020-03-31 | Incoming funds | USD 0 | Monitoring and Evaluation Framework | ||
| 2020-03-31 | Expenditure | USD 158 | Monitoring and Evaluation Framework | ||
| 2020-04-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2020-04-30 | Expenditure | USD 56 | Project Management Costs |
Showing 300 of 522. The API returns all of them.