United Nations Industrial Development Organization (UNIDO) / unido-activity-thailand
Applications of Industry-urban Symbiosis and Green Chemistry for Low Emission and Persistent Organic Pollutants (POPs)-Free Industrial Development in Thailand
XM-DAC-41123-PROJECT-150036
USD 9.16mdeclared budget
USD 8.01mdisbursed and spent, 446 of 892 transactions
Implementationstatus
31 Dec 2027planned end
Budget over time
- Reporting organisation
- United Nations Industrial Development Organization
- Start
- 01 Jan 2016 (planned)
- Countries
- —
- Sectors
- 321 · OECD DAC 3-digit
- Funded by
- GEF - Global Environment Facility
- Participating
- United Nations Industrial Development Organization (implementing); GEF - Global Environment Facility (funding)
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-10-03 02:37 UTC
Changes
- 2026-10-03Transaction rewritten+1 more
Transaction on 2026-08-31 rewritten USD 46.59 → USD 46.57
- Transactions added: 8 transactions added, USD 675
Applications of Industry-urban Symbiosis and Green Chemistry for Low Emission and Persistent Organic Pollutants (POPs)-Free Industrial Development in Thailand · compare 3ae3bfd4 → ed9ad95d
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2017-01-01 → 2017-12-31 | original | USD 86k | current |
| 2018-01-01 → 2018-12-31 | original | USD 90k | current |
| 2019-01-01 → 2019-12-31 | original | USD 55k | current |
| 2020-01-01 → 2020-12-31 | original | USD 578k | current |
| 2021-01-01 → 2021-12-31 | original | USD 1.00m | current |
| 2022-01-01 → 2022-12-31 | original | USD 1.71m | current |
| 2023-01-01 → 2023-12-31 | original | USD 2.14m | current |
| 2024-01-01 → 2024-12-31 | original | USD 665k | current |
| 2025-01-01 → 2025-12-31 | original | USD 1.30m | current |
| 2026-01-01 → 2026-12-31 | original | USD 1.46m | current |
| 2027-01-01 → 2027-12-31 | original | USD 69k | current |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2017-07-31 | Incoming funds | USD 200k | 1.1 Project Document Developed | ||
| 2017-07-31 | Expenditure | USD 0 | 1.1 Project Document Developed | ||
| 2017-10-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2017-10-31 | Expenditure | USD 86k | 1.1 Project Document Developed | ||
| 2018-01-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-01-31 | Expenditure | USD 59k | 1.1 Project Document Developed | ||
| 2018-02-28 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-02-28 | Expenditure | USD 302 | 1.1 Project Document Developed | ||
| 2018-03-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-03-31 | Expenditure | USD 1,836 | 1.1 Project Document Developed | ||
| 2018-04-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-04-30 | Expenditure | USD 11k | 1.1 Project Document Developed | ||
| 2018-05-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-05-31 | Expenditure | USD 11k | 1.1 Project Document Developed | ||
| 2018-06-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-06-30 | Expenditure | USD -297 | 1.1 Project Document Developed | ||
| 2018-07-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-07-31 | Expenditure | USD -2,735 | 1.1 Project Document Developed | ||
| 2018-08-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-08-31 | Expenditure | USD 110 | 1.1 Project Document Developed | ||
| 2018-09-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-09-30 | Expenditure | USD 5,736 | 1.1 Project Document Developed | ||
| 2018-10-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-10-31 | Expenditure | USD 3,939 | 1.1 Project Document Developed | ||
| 2018-11-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-11-30 | Expenditure | USD -255 | 1.1 Project Document Developed | ||
| 2018-12-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2018-12-31 | Expenditure | USD 1,434 | 1.1 Project Document Developed | ||
| 2019-01-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-01-31 | Expenditure | USD 16k | 1.1 Project Document Developed | ||
| 2019-02-28 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-02-28 | Expenditure | USD 112 | 1.1 Project Document Developed | ||
| 2019-03-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-03-31 | Expenditure | USD 36 | 1.1 Project Document Developed | ||
| 2019-04-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-04-30 | Expenditure | USD 7,000 | 1.1 Project Document Developed | ||
| 2019-05-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-05-31 | Expenditure | USD 8 | 1.1 Project Document Developed | ||
| 2019-06-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-06-30 | Expenditure | USD 5 | 1.1 Project Document Developed | ||
| 2019-07-31 | Incoming funds | USD 391k | 2.2. Ind-Urban symbiosis opportunities | ||
| 2019-07-31 | Expenditure | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2019-07-31 | Incoming funds | USD 2.64m | 2.3. Increased capacity on risks-benefit | ||
| 2019-07-31 | Expenditure | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2019-07-31 | Incoming funds | USD 171k | Mid-term Evaluation | ||
| 2019-07-31 | Expenditure | USD 0 | Mid-term Evaluation | ||
| 2019-07-31 | Incoming funds | USD 435k | 2.1. Intervention plan on new POP's | ||
| 2019-07-31 | Expenditure | USD 0 | 2.1. Intervention plan on new POP's | ||
| 2019-07-31 | Incoming funds | USD 426k | Project management | ||
| 2019-07-31 | Expenditure | USD 25k | Project management | ||
| 2019-07-31 | Incoming funds | USD 109k | Final Evaluation | ||
| 2019-07-31 | Expenditure | USD 0 | Final Evaluation | ||
| 2019-07-31 | Incoming funds | USD 622k | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2019-07-31 | Expenditure | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2019-07-31 | Incoming funds | USD 3.77m | 3.1. Ind-Urban symbiosis implemented | ||
| 2019-07-31 | Expenditure | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2019-07-31 | Incoming funds | USD 403k | 1.1. Legal and policy measures enhanced | ||
| 2019-07-31 | Expenditure | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2019-07-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-07-31 | Expenditure | USD 41 | 1.1 Project Document Developed | ||
| 2019-08-31 | Incoming funds | USD 0 | Project management | ||
| 2019-08-31 | Expenditure | USD 25 | Project management | ||
| 2019-09-30 | Incoming funds | USD 0 | Project management | ||
| 2019-09-30 | Expenditure | USD -106 | Project management | ||
| 2019-10-31 | Incoming funds | USD 0 | Project management | ||
| 2019-10-31 | Expenditure | USD -129 | Project management | ||
| 2019-10-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-10-31 | Expenditure | USD 10 | 1.1 Project Document Developed | ||
| 2019-11-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2019-11-30 | Expenditure | USD 161 | 1.1 Project Document Developed | ||
| 2019-11-30 | Incoming funds | USD 0 | Project management | ||
| 2019-11-30 | Expenditure | USD 5,351 | Project management | ||
| 2019-12-31 | Incoming funds | USD 0 | Project management | ||
| 2019-12-31 | Expenditure | USD 721 | Project management | ||
| 2020-01-31 | Incoming funds | USD 0 | Project management | ||
| 2020-01-31 | Expenditure | USD 75k | Project management | ||
| 2020-02-29 | Incoming funds | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2020-02-29 | Expenditure | USD 185 | 3.1. Ind-Urban symbiosis implemented | ||
| 2020-02-29 | Incoming funds | USD 0 | Project management | ||
| 2020-02-29 | Expenditure | USD 484 | Project management | ||
| 2020-03-31 | Incoming funds | USD 0 | Project management | ||
| 2020-03-31 | Expenditure | USD 258 | Project management | ||
| 2020-04-30 | Incoming funds | USD 3,180 | Project management | ||
| 2020-04-30 | Expenditure | USD 52 | Project management | ||
| 2020-04-30 | Incoming funds | USD -1,795 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2020-04-30 | Expenditure | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2020-04-30 | Incoming funds | USD 109k | Mid-term Evaluation | ||
| 2020-04-30 | Expenditure | USD 0 | Mid-term Evaluation | ||
| 2020-04-30 | Incoming funds | USD -109k | Final Evaluation | ||
| 2020-04-30 | Expenditure | USD 0 | Final Evaluation | ||
| 2020-04-30 | Incoming funds | USD -8 | 3.1. Ind-Urban symbiosis implemented | ||
| 2020-04-30 | Expenditure | USD 67k | 3.1. Ind-Urban symbiosis implemented | ||
| 2020-04-30 | Incoming funds | USD -1,377 | 2.3. Increased capacity on risks-benefit | ||
| 2020-04-30 | Expenditure | USD 51k | 2.3. Increased capacity on risks-benefit | ||
| 2020-04-30 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2020-04-30 | Expenditure | USD 60k | 2.2. Ind-Urban symbiosis opportunities | ||
| 2020-05-31 | Incoming funds | USD 0 | Project management | ||
| 2020-05-31 | Expenditure | USD 21 | Project management | ||
| 2020-05-31 | Incoming funds | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2020-05-31 | Expenditure | USD 100k | 3.1. Ind-Urban symbiosis implemented | ||
| 2020-05-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2020-05-31 | Expenditure | USD 189k | 2.3. Increased capacity on risks-benefit | ||
| 2020-05-31 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2020-05-31 | Expenditure | USD -8,270 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2020-06-30 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2020-06-30 | Expenditure | USD 2,754 | 2.3. Increased capacity on risks-benefit | ||
| 2020-06-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2020-06-30 | Expenditure | USD -90 | 1.1 Project Document Developed | ||
| 2020-06-30 | Incoming funds | USD 0 | Project management | ||
| 2020-06-30 | Expenditure | USD 2,829 | Project management | ||
| 2020-07-31 | Incoming funds | USD 0 | Project management | ||
| 2020-07-31 | Expenditure | USD 3,456 | Project management | ||
| 2020-07-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2020-07-31 | Expenditure | USD 6 | 2.3. Increased capacity on risks-benefit | ||
| 2020-07-31 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2020-07-31 | Expenditure | USD 7,277 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2020-08-31 | Incoming funds | USD 0 | Project management | ||
| 2020-08-31 | Expenditure | USD 11k | Project management | ||
| 2020-08-31 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2020-08-31 | Expenditure | USD 0 | 1.1 Project Document Developed | ||
| 2020-08-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2020-08-31 | Expenditure | USD 42 | 2.3. Increased capacity on risks-benefit | ||
| 2020-08-31 | Incoming funds | USD 0 | Mid-term Evaluation | ||
| 2020-08-31 | Expenditure | USD 1,636 | Mid-term Evaluation | ||
| 2020-09-30 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2020-09-30 | Expenditure | USD 48 | 2.3. Increased capacity on risks-benefit | ||
| 2020-09-30 | Incoming funds | USD 0 | Project management | ||
| 2020-09-30 | Expenditure | USD 3,680 | Project management | ||
| 2020-09-30 | Incoming funds | USD 0 | Mid-term Evaluation | ||
| 2020-09-30 | Expenditure | USD 6 | Mid-term Evaluation | ||
| 2020-09-30 | Incoming funds | USD 0 | 1.1 Project Document Developed | ||
| 2020-09-30 | Expenditure | USD 786 | 1.1 Project Document Developed | ||
| 2020-10-31 | Incoming funds | USD 0 | Mid-term Evaluation | ||
| 2020-10-31 | Expenditure | USD -5 | Mid-term Evaluation | ||
| 2020-10-31 | Incoming funds | USD 0 | Project management | ||
| 2020-10-31 | Expenditure | USD 2,247 | Project management | ||
| 2020-10-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2020-10-31 | Expenditure | USD 9 | 2.3. Increased capacity on risks-benefit | ||
| 2020-11-30 | Incoming funds | USD 0 | Project management | ||
| 2020-11-30 | Expenditure | USD 2,029 | Project management | ||
| 2020-11-30 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2020-11-30 | Expenditure | USD 27 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2020-11-30 | Incoming funds | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2020-11-30 | Expenditure | USD 36 | 3.1. Ind-Urban symbiosis implemented | ||
| 2020-11-30 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2020-11-30 | Expenditure | USD -104 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2020-11-30 | Incoming funds | USD 0 | Mid-term Evaluation | ||
| 2020-11-30 | Expenditure | USD 36 | Mid-term Evaluation | ||
| 2020-12-31 | Incoming funds | USD 0 | Project management | ||
| 2020-12-31 | Expenditure | USD -1,491 | Project management | ||
| 2020-12-31 | Incoming funds | USD 0 | Mid-term Evaluation | ||
| 2020-12-31 | Expenditure | USD 56 | Mid-term Evaluation | ||
| 2020-12-31 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2020-12-31 | Expenditure | USD 5,997 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2020-12-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2020-12-31 | Expenditure | USD 13 | 2.3. Increased capacity on risks-benefit | ||
| 2021-01-31 | Incoming funds | USD 0 | Project management | ||
| 2021-01-31 | Expenditure | USD 136k | Project management | ||
| 2021-01-31 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-01-31 | Expenditure | USD 60k | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-01-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-01-31 | Expenditure | USD 350k | 2.3. Increased capacity on risks-benefit | ||
| 2021-01-31 | Incoming funds | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2021-01-31 | Expenditure | USD 291 | 1.1. Legal and policy measures enhanced | ||
| 2021-01-31 | Incoming funds | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-01-31 | Expenditure | USD 370k | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-02-28 | Incoming funds | USD 0 | Project management | ||
| 2021-02-28 | Expenditure | USD 2,727 | Project management | ||
| 2021-02-28 | Incoming funds | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2021-02-28 | Expenditure | USD 61 | 1.1. Legal and policy measures enhanced | ||
| 2021-02-28 | Incoming funds | USD 1,321 | 1.1 Project Document Developed | ||
| 2021-02-28 | Expenditure | USD 0 | 1.1 Project Document Developed | ||
| 2021-02-28 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-02-28 | Expenditure | USD 61 | 2.3. Increased capacity on risks-benefit | ||
| 2021-03-31 | Incoming funds | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2021-03-31 | Expenditure | USD 1,316 | 1.1. Legal and policy measures enhanced | ||
| 2021-03-31 | Incoming funds | USD -1,321 | 1.1 Project Document Developed | ||
| 2021-03-31 | Expenditure | USD -1,321 | 1.1 Project Document Developed | ||
| 2021-03-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-03-31 | Expenditure | USD 5,091 | 2.3. Increased capacity on risks-benefit | ||
| 2021-03-31 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-03-31 | Expenditure | USD 10k | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-03-31 | Incoming funds | USD -34k | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-03-31 | Expenditure | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-03-31 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-03-31 | Expenditure | USD 5,096 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-03-31 | Incoming funds | USD 34k | Project management | ||
| 2021-03-31 | Expenditure | USD 467 | Project management | ||
| 2021-04-30 | Incoming funds | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2021-04-30 | Expenditure | USD 14 | 1.1. Legal and policy measures enhanced | ||
| 2021-04-30 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-04-30 | Expenditure | USD 10k | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-04-30 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-04-30 | Expenditure | USD -4 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-04-30 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-04-30 | Expenditure | USD 11 | 2.3. Increased capacity on risks-benefit | ||
| 2021-04-30 | Incoming funds | USD 0 | Project management | ||
| 2021-04-30 | Expenditure | USD 2,586 | Project management | ||
| 2021-05-31 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-05-31 | Expenditure | USD 14 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-05-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-05-31 | Expenditure | USD 14 | 2.3. Increased capacity on risks-benefit | ||
| 2021-05-31 | Incoming funds | USD 0 | Project management | ||
| 2021-05-31 | Expenditure | USD 218 | Project management | ||
| 2021-05-31 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-05-31 | Expenditure | USD 101 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-05-31 | Incoming funds | USD -1,461 | 1.1 Project Document Developed | ||
| 2021-05-31 | Expenditure | USD -1,461 | 1.1 Project Document Developed | ||
| 2021-06-30 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-06-30 | Expenditure | USD 18 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-06-30 | Incoming funds | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2021-06-30 | Expenditure | USD 63k | 1.1. Legal and policy measures enhanced | ||
| 2021-06-30 | Incoming funds | USD 0 | Project management | ||
| 2021-06-30 | Expenditure | USD 7,270 | Project management | ||
| 2021-06-30 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-06-30 | Expenditure | USD 123 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-06-30 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-06-30 | Expenditure | USD 18 | 2.3. Increased capacity on risks-benefit | ||
| 2021-07-31 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-07-31 | Expenditure | USD 444 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-07-31 | Incoming funds | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2021-07-31 | Expenditure | USD 1,127 | 1.1. Legal and policy measures enhanced | ||
| 2021-07-31 | Incoming funds | USD 0 | Project management | ||
| 2021-07-31 | Expenditure | USD 1,412 | Project management | ||
| 2021-07-31 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-07-31 | Expenditure | USD 92 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-07-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-07-31 | Expenditure | USD 92 | 2.3. Increased capacity on risks-benefit | ||
| 2021-08-31 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-08-31 | Expenditure | USD 48 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-08-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-08-31 | Expenditure | USD 3 | 2.3. Increased capacity on risks-benefit | ||
| 2021-08-31 | Incoming funds | USD 0 | Project management | ||
| 2021-08-31 | Expenditure | USD 884 | Project management | ||
| 2021-08-31 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-08-31 | Expenditure | USD 3 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-09-30 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-09-30 | Expenditure | USD -3,472 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-09-30 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-09-30 | Expenditure | USD 37k | 2.3. Increased capacity on risks-benefit | ||
| 2021-09-30 | Incoming funds | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2021-09-30 | Expenditure | USD -32 | 1.1. Legal and policy measures enhanced | ||
| 2021-09-30 | Incoming funds | USD 0 | Project management | ||
| 2021-09-30 | Expenditure | USD 85 | Project management | ||
| 2021-09-30 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-09-30 | Expenditure | USD 98k | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-10-31 | Incoming funds | USD 15k | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-10-31 | Expenditure | USD 499 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-10-31 | Incoming funds | USD 102k | Project management | ||
| 2021-10-31 | Expenditure | USD 1,201 | Project management | ||
| 2021-10-31 | Incoming funds | USD 265k | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-10-31 | Expenditure | USD 1,191 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-10-31 | Incoming funds | USD -100k | 2.1. Intervention plan on new POP's | ||
| 2021-10-31 | Expenditure | USD 0 | 2.1. Intervention plan on new POP's | ||
| 2021-10-31 | Incoming funds | USD 100k | 1.1. Legal and policy measures enhanced | ||
| 2021-10-31 | Expenditure | USD 29 | 1.1. Legal and policy measures enhanced | ||
| 2021-10-31 | Incoming funds | USD -343k | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-10-31 | Expenditure | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-10-31 | Incoming funds | USD -39k | 2.3. Increased capacity on risks-benefit | ||
| 2021-10-31 | Expenditure | USD 93 | 2.3. Increased capacity on risks-benefit | ||
| 2021-11-30 | Incoming funds | USD 0 | Project management | ||
| 2021-11-30 | Expenditure | USD -110 | Project management | ||
| 2021-11-30 | Incoming funds | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-11-30 | Expenditure | USD -268k | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-11-30 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-11-30 | Expenditure | USD 18k | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-11-30 | Incoming funds | USD 0 | Mid-term Evaluation | ||
| 2021-11-30 | Expenditure | USD -158 | Mid-term Evaluation | ||
| 2021-11-30 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-11-30 | Expenditure | USD 56k | 2.3. Increased capacity on risks-benefit | ||
| 2021-12-31 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-12-31 | Expenditure | USD -0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2021-12-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2021-12-31 | Expenditure | USD 29k | 2.3. Increased capacity on risks-benefit | ||
| 2021-12-31 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-12-31 | Expenditure | USD 9,041 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2021-12-31 | Incoming funds | USD 0 | Project management | ||
| 2021-12-31 | Expenditure | USD -2,240 | Project management | ||
| 2021-12-31 | Incoming funds | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2021-12-31 | Expenditure | USD 490 | 3.1. Ind-Urban symbiosis implemented | ||
| 2022-01-31 | Incoming funds | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2022-01-31 | Expenditure | USD 548k | 3.1. Ind-Urban symbiosis implemented | ||
| 2022-01-31 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2022-01-31 | Expenditure | USD 385k | 2.3. Increased capacity on risks-benefit | ||
| 2022-01-31 | Incoming funds | USD 0 | 1.1. Legal and policy measures enhanced | ||
| 2022-01-31 | Expenditure | USD 72k | 1.1. Legal and policy measures enhanced | ||
| 2022-01-31 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2022-01-31 | Expenditure | USD 132k | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2022-01-31 | Incoming funds | USD 0 | Project management | ||
| 2022-01-31 | Expenditure | USD 108k | Project management | ||
| 2022-01-31 | Incoming funds | USD 0 | 2.2. Ind-Urban symbiosis opportunities | ||
| 2022-01-31 | Expenditure | USD 62k | 2.2. Ind-Urban symbiosis opportunities | ||
| 2022-02-28 | Incoming funds | USD 0 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2022-02-28 | Expenditure | USD -54 | 4.1. Sustaining Ind-Urban symbiosis | ||
| 2022-02-28 | Incoming funds | USD 0 | 2.3. Increased capacity on risks-benefit | ||
| 2022-02-28 | Expenditure | USD 5,506 | 2.3. Increased capacity on risks-benefit | ||
| 2022-02-28 | Incoming funds | USD 0 | Project management | ||
| 2022-02-28 | Expenditure | USD 71 | Project management | ||
| 2022-02-28 | Incoming funds | USD 0 | 3.1. Ind-Urban symbiosis implemented | ||
| 2022-02-28 | Expenditure | USD 52 | 3.1. Ind-Urban symbiosis implemented |
Showing 300 of 892. The API returns all of them.