HCFC phase-out management plan (stage II)

XM-DAC-41123-PROJECT-160270

USD 10.49mdeclared budget
USD 6.64mdisbursed and spent, 527 of 1,054 transactions
Implementationstatus
31 Dec 2027planned end

Budget over time

— declared budget (USD)   - - disbursed and spent   ○ value changed
Reporting organisation
United Nations Industrial Development Organization
Start
01 Dec 2016 (planned)
Countries
—
Sectors
321 · OECD DAC 3-digit
Funded by
INTERNATIONAL; ITALY
Participating
United Nations Industrial Development Organization (implementing); INTERNATIONAL (funding); ITALY (funding)
Versions seen
2 since 26 Sept 2026 · last checked 2026-10-03 02:36 UTC

Changes

  1. 2026-10-03
    Budget changed
    +1 more

    Budget USD 10.46m → USD 10.49m (+0.2%)

    • Transactions added: 16 transactions added, USD 3,855

    HCFC phase-out management plan (stage II) · compare f6bfda65 → 1b039fb5

Budgets

PeriodTypeValueRecord
2017-01-01 → 2017-12-31originalUSD 98kcurrent
2018-01-01 → 2018-12-31originalUSD 65kcurrent
2019-01-01 → 2019-12-31originalUSD 1.14mcurrent
2020-01-01 → 2020-12-31originalUSD 960kcurrent
2021-01-01 → 2021-12-31originalUSD 924kcurrent
2022-01-01 → 2022-12-31originalUSD 999kcurrent
2023-01-01 → 2023-12-31originalUSD 529kcurrent
2024-01-01 → 2024-12-31originalUSD 638kcurrent
2025-01-01 → 2025-12-31originalUSD 918kcurrent
2026-01-01 → 2026-12-31originalUSD 2.59mcurrent
2027-01-01 → 2027-12-31originalUSD 1.63mcurrent

Transactions

DateTypeValueToNoteRecord
2016-12-31Incoming fundsUSD 90kProject document prepared
2016-12-31ExpenditureUSD 0Project document prepared
2017-01-31Incoming fundsUSD 0Project document prepared
2017-01-31ExpenditureUSD 3,389Project document prepared
2017-02-28Incoming fundsUSD 0Project document prepared
2017-02-28ExpenditureUSD 4Project document prepared
2017-03-31Incoming fundsUSD 0Project document prepared
2017-03-31ExpenditureUSD 4Project document prepared
2017-05-31Incoming fundsUSD 0Project document prepared
2017-05-31ExpenditureUSD 9,932Project document prepared
2017-06-30Incoming fundsUSD 0Project document prepared
2017-06-30ExpenditureUSD 7,087Project document prepared
2017-07-31Incoming fundsUSD 0Project document prepared
2017-07-31ExpenditureUSD 3,428Project document prepared
2017-08-31Incoming fundsUSD 0Project document prepared
2017-08-31ExpenditureUSD 13kProject document prepared
2017-09-30Incoming fundsUSD 0Project document prepared
2017-09-30ExpenditureUSD 2,369Project document prepared
2017-10-31Incoming fundsUSD 0Project document prepared
2017-10-31ExpenditureUSD 11kProject document prepared
2017-11-30Incoming fundsUSD 0Project document prepared
2017-11-30ExpenditureUSD 19kProject document prepared
2017-11-30Incoming fundsUSD 646kHPMP MP (stage II, first tranche)
2017-11-30ExpenditureUSD 0HPMP MP (stage II, first tranche)
2017-12-31Incoming fundsUSD 0Project document prepared
2017-12-31ExpenditureUSD 30kProject document prepared
2017-12-31Incoming fundsUSD 834kHPMP Stage II, Foam Sector Plan
2017-12-31ExpenditureUSD 0HPMP Stage II, Foam Sector Plan
2017-12-31Incoming fundsUSD 66kSII, Project Monitoring & Implementation
2017-12-31ExpenditureUSD 0SII, Project Monitoring & Implementation
2017-12-31Incoming fundsUSD 7,500HPMP Stage II, Production Monitoring
2017-12-31ExpenditureUSD 0HPMP Stage II, Production Monitoring
2017-12-31Incoming fundsUSD 808kGlobal chiller replacement project (ARG)
2017-12-31ExpenditureUSD 0Global chiller replacement project (ARG)
2018-01-31Incoming fundsUSD 0Project document prepared
2018-01-31ExpenditureUSD -8,699Project document prepared
2018-02-28Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-02-28ExpenditureUSD 35kHPMP Stage II, Foam Sector Plan
2018-02-28Incoming fundsUSD 0Project document prepared
2018-02-28ExpenditureUSD 16Project document prepared
2018-03-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-03-31ExpenditureUSD -38HPMP Stage II, Foam Sector Plan
2018-04-30Incoming fundsUSD 250kHPMP TF (stage II, first tranche)
2018-04-30ExpenditureUSD 0HPMP TF (stage II, first tranche)
2018-04-30Incoming fundsUSD 0Project document prepared
2018-04-30ExpenditureUSD -23Project document prepared
2018-04-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-04-30ExpenditureUSD 3,775HPMP Stage II, Foam Sector Plan
2018-05-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-05-31ExpenditureUSD 18kHPMP Stage II, Foam Sector Plan
2018-05-31Incoming fundsUSD 0Project document prepared
2018-05-31ExpenditureUSD 53Project document prepared
2018-06-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-06-30ExpenditureUSD 7,209HPMP Stage II, Foam Sector Plan
2018-07-31Incoming fundsUSD 0Project document prepared
2018-07-31ExpenditureUSD 403Project document prepared
2018-07-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-07-31ExpenditureUSD -134HPMP Stage II, Foam Sector Plan
2018-08-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-08-31ExpenditureUSD 1,539HPMP Stage II, Foam Sector Plan
2018-09-30Incoming fundsUSD 0Project document prepared
2018-09-30ExpenditureUSD -212Project document prepared
2018-09-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-09-30ExpenditureUSD 149HPMP Stage II, Foam Sector Plan
2018-10-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-10-31ExpenditureUSD 4,060HPMP Stage II, Foam Sector Plan
2018-11-30Incoming fundsUSD 0SII, Project Monitoring & Implementation
2018-11-30ExpenditureUSD 4,002SII, Project Monitoring & Implementation
2018-11-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-11-30ExpenditureUSD 9,236HPMP Stage II, Foam Sector Plan
2018-12-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2018-12-31ExpenditureUSD -9,768HPMP Stage II, Foam Sector Plan
2018-12-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2018-12-31ExpenditureUSD 25SII, Project Monitoring & Implementation
2019-01-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-01-31ExpenditureUSD 6,173Global chiller replacement project (ARG)
2019-01-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-01-31ExpenditureUSD 6,407HPMP Stage II, Foam Sector Plan
2019-01-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-01-31ExpenditureUSD 5,815SII, Project Monitoring & Implementation
2019-01-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-01-31ExpenditureUSD 8,995HPMP MP (stage II, first tranche)
2019-02-28Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-02-28ExpenditureUSD 61kGlobal chiller replacement project (ARG)
2019-02-28Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-02-28ExpenditureUSD 122HPMP Stage II, Foam Sector Plan
2019-02-28Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-02-28ExpenditureUSD 11SII, Project Monitoring & Implementation
2019-02-28Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-02-28ExpenditureUSD 7,458HPMP MP (stage II, first tranche)
2019-03-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-03-31ExpenditureUSD -2,980HPMP Stage II, Foam Sector Plan
2019-03-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-03-31ExpenditureUSD 19kSII, Project Monitoring & Implementation
2019-03-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-03-31ExpenditureUSD -11HPMP MP (stage II, first tranche)
2019-03-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-03-31ExpenditureUSD 2,097Global chiller replacement project (ARG)
2019-03-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-03-31ExpenditureUSD 22kHPMP TF (stage II, first tranche)
2019-03-31Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-03-31ExpenditureUSD 7,164HPMP Stage II, Production Monitoring
2019-04-30Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-04-30ExpenditureUSD 9,232HPMP TF (stage II, first tranche)
2019-04-30Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-04-30ExpenditureUSD -67HPMP MP (stage II, first tranche)
2019-04-30Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-04-30ExpenditureUSD 1,577Global chiller replacement project (ARG)
2019-04-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-04-30ExpenditureUSD 2,241HPMP Stage II, Foam Sector Plan
2019-04-30Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-04-30ExpenditureUSD 28SII, Project Monitoring & Implementation
2019-04-30Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-04-30ExpenditureUSD 17HPMP Stage II, Production Monitoring
2019-05-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-05-31ExpenditureUSD 10kHPMP MP (stage II, first tranche)
2019-05-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-05-31ExpenditureUSD 50Global chiller replacement project (ARG)
2019-05-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-05-31ExpenditureUSD 8,566HPMP Stage II, Foam Sector Plan
2019-05-31Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-05-31ExpenditureUSD 161HPMP Stage II, Production Monitoring
2019-05-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-05-31ExpenditureUSD -50SII, Project Monitoring & Implementation
2019-05-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-05-31ExpenditureUSD 52kHPMP TF (stage II, first tranche)
2019-06-30Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-06-30ExpenditureUSD 10kHPMP TF (stage II, first tranche)
2019-06-30Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-06-30ExpenditureUSD -184HPMP MP (stage II, first tranche)
2019-06-30Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-06-30ExpenditureUSD -1Global chiller replacement project (ARG)
2019-06-30Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-06-30ExpenditureUSD 29kSII, Project Monitoring & Implementation
2019-06-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-06-30ExpenditureUSD 121HPMP Stage II, Foam Sector Plan
2019-06-30Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-06-30ExpenditureUSD 10HPMP Stage II, Production Monitoring
2019-07-31Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-07-31ExpenditureUSD 101HPMP Stage II, Production Monitoring
2019-07-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-07-31ExpenditureUSD 108kHPMP TF (stage II, first tranche)
2019-07-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-07-31ExpenditureUSD 354kHPMP MP (stage II, first tranche)
2019-07-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-07-31ExpenditureUSD 50Global chiller replacement project (ARG)
2019-07-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-07-31ExpenditureUSD 34HPMP Stage II, Foam Sector Plan
2019-07-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-07-31ExpenditureUSD 450SII, Project Monitoring & Implementation
2019-08-31Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-08-31ExpenditureUSD 76HPMP Stage II, Production Monitoring
2019-08-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-08-31ExpenditureUSD 154kHPMP Stage II, Foam Sector Plan
2019-08-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-08-31ExpenditureUSD 1,107SII, Project Monitoring & Implementation
2019-08-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-08-31ExpenditureUSD 121HPMP MP (stage II, first tranche)
2019-08-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-08-31ExpenditureUSD -2Global chiller replacement project (ARG)
2019-08-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-08-31ExpenditureUSD -1,158HPMP TF (stage II, first tranche)
2019-09-30Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-09-30ExpenditureUSD 713SII, Project Monitoring & Implementation
2019-09-30Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-09-30ExpenditureUSD 86HPMP Stage II, Production Monitoring
2019-09-30Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-09-30ExpenditureUSD -12Global chiller replacement project (ARG)
2019-09-30Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-09-30ExpenditureUSD 425HPMP TF (stage II, first tranche)
2019-09-30Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-09-30ExpenditureUSD 180kHPMP MP (stage II, first tranche)
2019-10-31Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-10-31ExpenditureUSD 89HPMP Stage II, Production Monitoring
2019-10-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-10-31ExpenditureUSD 1,539SII, Project Monitoring & Implementation
2019-10-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-10-31ExpenditureUSD 379HPMP TF (stage II, first tranche)
2019-10-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-10-31ExpenditureUSD 5,519HPMP MP (stage II, first tranche)
2019-10-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-10-31ExpenditureUSD 2Global chiller replacement project (ARG)
2019-10-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-10-31ExpenditureUSD 6,766HPMP Stage II, Foam Sector Plan
2019-11-30Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-11-30ExpenditureUSD 86Global chiller replacement project (ARG)
2019-11-30Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-11-30ExpenditureUSD 116HPMP MP (stage II, first tranche)
2019-11-30Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-11-30ExpenditureUSD 110HPMP Stage II, Production Monitoring
2019-11-30Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-11-30ExpenditureUSD 6,079HPMP TF (stage II, first tranche)
2019-11-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-11-30ExpenditureUSD 64kHPMP Stage II, Foam Sector Plan
2019-11-30Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-11-30ExpenditureUSD 5,107SII, Project Monitoring & Implementation
2019-12-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2019-12-31ExpenditureUSD -555Global chiller replacement project (ARG)
2019-12-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2019-12-31ExpenditureUSD 542HPMP MP (stage II, first tranche)
2019-12-31Incoming fundsUSD 0HPMP Stage II, Production Monitoring
2019-12-31ExpenditureUSD -2,026HPMP Stage II, Production Monitoring
2019-12-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2019-12-31ExpenditureUSD 57HPMP TF (stage II, first tranche)
2019-12-31Incoming fundsUSD 2.07mHPMP Stage II, 2nd Tranche - Foam Sector
2019-12-31ExpenditureUSD 0HPMP Stage II, 2nd Tranche - Foam Sector
2019-12-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2019-12-31ExpenditureUSD 119HPMP Stage II, Foam Sector Plan
2019-12-31Incoming fundsUSD 100kHPMP Stage II, 2nd Tranche - Ref - M&M
2019-12-31ExpenditureUSD 0HPMP Stage II, 2nd Tranche - Ref - M&M
2019-12-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2019-12-31ExpenditureUSD -14kSII, Project Monitoring & Implementation
2019-12-31Incoming fundsUSD 146kHPMP Stage II, 2nd Tranche - Foam - M&M
2019-12-31ExpenditureUSD 0HPMP Stage II, 2nd Tranche - Foam - M&M
2019-12-31Incoming fundsUSD 18kHPMP Stage II, 2nd Tranche - HCFC-22 Pro
2019-12-31ExpenditureUSD 0HPMP Stage II, 2nd Tranche - HCFC-22 Pro
2019-12-31Incoming fundsUSD 947kHPMP Stage II, 2nd Tranche-Refrigeration
2019-12-31ExpenditureUSD 0HPMP Stage II, 2nd Tranche-Refrigeration
2020-01-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2020-01-31ExpenditureUSD 147kHPMP Stage II, Foam Sector Plan
2020-01-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2020-01-31ExpenditureUSD -35SII, Project Monitoring & Implementation
2020-01-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2020-01-31ExpenditureUSD 74kHPMP MP (stage II, first tranche)
2020-01-31Incoming fundsUSD 0HPMP Stage II, 2nd Tranche - Foam - M&M
2020-01-31ExpenditureUSD 5,545HPMP Stage II, 2nd Tranche - Foam - M&M
2020-01-31Incoming fundsUSD 0HPMP Stage II, 2nd Tranche - Ref - M&M
2020-01-31ExpenditureUSD 5,545HPMP Stage II, 2nd Tranche - Ref - M&M
2020-01-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2020-01-31ExpenditureUSD 18kGlobal chiller replacement project (ARG)
2020-02-29Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2020-02-29ExpenditureUSD 65HPMP MP (stage II, first tranche)
2020-02-29Incoming fundsUSD 0HPMP Stage II, 2nd Tranche - Ref - M&M
2020-02-29ExpenditureUSD 1HPMP Stage II, 2nd Tranche - Ref - M&M
2020-02-29Incoming fundsUSD 0HPMP Stage II, 2nd Tranche-Refrigeration
2020-02-29ExpenditureUSD 285kHPMP Stage II, 2nd Tranche-Refrigeration
2020-02-29Incoming fundsUSD 0Global chiller replacement project (ARG)
2020-02-29ExpenditureUSD 298Global chiller replacement project (ARG)
2020-02-29Incoming fundsUSD 0HPMP Stage II, 2nd Tranche - Foam - M&M
2020-02-29ExpenditureUSD 1HPMP Stage II, 2nd Tranche - Foam - M&M
2020-02-29Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2020-02-29ExpenditureUSD 38HPMP Stage II, Foam Sector Plan
2020-03-31Incoming fundsUSD 0HPMP Stage II, 2nd Tranche-Refrigeration
2020-03-31ExpenditureUSD 45kHPMP Stage II, 2nd Tranche-Refrigeration
2020-03-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2020-03-31ExpenditureUSD 397Global chiller replacement project (ARG)
2020-03-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2020-03-31ExpenditureUSD 5,384HPMP TF (stage II, first tranche)
2020-03-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2020-03-31ExpenditureUSD 107HPMP Stage II, Foam Sector Plan
2020-03-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2020-03-31ExpenditureUSD 65HPMP MP (stage II, first tranche)
2020-04-30Incoming fundsUSD 0HPMP Stage II, 2nd Tranche-Refrigeration
2020-04-30ExpenditureUSD 1,066HPMP Stage II, 2nd Tranche-Refrigeration
2020-04-30Incoming fundsUSD 0Global chiller replacement project (ARG)
2020-04-30ExpenditureUSD 253Global chiller replacement project (ARG)
2020-04-30Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2020-04-30ExpenditureUSD 322HPMP TF (stage II, first tranche)
2020-04-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2020-04-30ExpenditureUSD 10HPMP Stage II, Foam Sector Plan
2020-04-30Incoming fundsUSD 0SII, Project Monitoring & Implementation
2020-04-30ExpenditureUSD 5,736SII, Project Monitoring & Implementation
2020-04-30Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2020-04-30ExpenditureUSD -156HPMP MP (stage II, first tranche)
2020-05-31Incoming fundsUSD 0HPMP Stage II, 2nd Tranche-Refrigeration
2020-05-31ExpenditureUSD 59HPMP Stage II, 2nd Tranche-Refrigeration
2020-05-31Incoming fundsUSD 0Global chiller replacement project (ARG)
2020-05-31ExpenditureUSD 255Global chiller replacement project (ARG)
2020-05-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2020-05-31ExpenditureUSD -378HPMP TF (stage II, first tranche)
2020-05-31Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2020-05-31ExpenditureUSD 4HPMP MP (stage II, first tranche)
2020-05-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2020-05-31ExpenditureUSD 85SII, Project Monitoring & Implementation
2020-05-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2020-05-31ExpenditureUSD -9HPMP Stage II, Foam Sector Plan
2020-06-30Incoming fundsUSD 0HPMP MP (stage II, first tranche)
2020-06-30ExpenditureUSD 59HPMP MP (stage II, first tranche)
2020-06-30Incoming fundsUSD 0SII, Project Monitoring & Implementation
2020-06-30ExpenditureUSD -21SII, Project Monitoring & Implementation
2020-06-30Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2020-06-30ExpenditureUSD 24kHPMP Stage II, Foam Sector Plan
2020-06-30Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2020-06-30ExpenditureUSD 723HPMP TF (stage II, first tranche)
2020-06-30Incoming fundsUSD 0Global chiller replacement project (ARG)
2020-06-30ExpenditureUSD 19kGlobal chiller replacement project (ARG)
2020-06-30Incoming fundsUSD 0HPMP Stage II, 2nd Tranche-Refrigeration
2020-06-30ExpenditureUSD -46HPMP Stage II, 2nd Tranche-Refrigeration
2020-06-30Incoming fundsUSD 0HPMP Stage II, 2nd Tranche - Ref - M&M
2020-06-30ExpenditureUSD 27HPMP Stage II, 2nd Tranche - Ref - M&M
2020-06-30Incoming fundsUSD 0HPMP Stage II, 2nd Tranche - Foam - M&M
2020-06-30ExpenditureUSD 27HPMP Stage II, 2nd Tranche - Foam - M&M
2020-07-31Incoming fundsUSD 0HPMP Stage II, Foam Sector Plan
2020-07-31ExpenditureUSD 108HPMP Stage II, Foam Sector Plan
2020-07-31Incoming fundsUSD 0SII, Project Monitoring & Implementation
2020-07-31ExpenditureUSD 59SII, Project Monitoring & Implementation
2020-07-31Incoming fundsUSD 0HPMP Stage II, 2nd Tranche-Refrigeration
2020-07-31ExpenditureUSD 98HPMP Stage II, 2nd Tranche-Refrigeration
2020-07-31Incoming fundsUSD 0HPMP TF (stage II, first tranche)
2020-07-31ExpenditureUSD -889HPMP TF (stage II, first tranche)

Showing 300 of 1,054. The API returns all of them.

Struck-through rows were in the previous version, last seen 2026-10-02 02:28 UTC, and are not in the current file.

HCFC phase-out management plan (stage II) · OpenAid Ledger