Enhancing the National Adaptation Plan Process for the Sultanate of Oman

XM-DAC-41123-PROJECT-220129

USD 2.69mdeclared budget
USD 2.39mdisbursed and spent, 382 of 764 transactions
Implementationstatus
05 Jan 2027planned end

Budget over time

— declared budget (USD)   - - disbursed and spent   ○ value changed
Reporting organisation
United Nations Industrial Development Organization
Start
05 Jan 2023 (planned)
Countries
—
Sectors
321 · OECD DAC 3-digit
Funded by
Green Climate Fund
Participating
United Nations Industrial Development Organization (implementing); Green Climate Fund (funding)
Versions seen
2 since 26 Sept 2026 · last checked 2026-10-03 02:36 UTC

Changes

  1. 2026-10-03
    Transaction rewritten
    +1 more

    Transaction on 2026-08-31 rewritten USD 64.66 → USD 1,457.7

    • Transactions added: 8 transactions added, USD 82k

    Enhancing the National Adaptation Plan Process for the Sultanate of Oman · compare ddd1e8ec → 7ae27e2f

Budgets

PeriodTypeValueRecord
2023-01-01 → 2023-12-31originalUSD 1.01mcurrent
2024-01-01 → 2024-12-31originalUSD 335kcurrent
2025-01-01 → 2025-12-31originalUSD 450kcurrent
2026-01-01 → 2026-12-31originalUSD 841kcurrent
2027-01-01 → 2027-12-31originalUSD 59kcurrent

Transactions

DateTypeValueToNoteRecord
2023-04-30Incoming fundsUSD 46kOutput 3.1.2. National Adaptation
2023-04-30ExpenditureUSD 0Output 3.1.2. National Adaptation
2023-04-30Incoming fundsUSD 244kOutput 3.4.1. Prioritised mainstreamed
2023-04-30ExpenditureUSD 0Output 3.4.1. Prioritised mainstreamed
2023-04-30Incoming fundsUSD 488kOutput 3.3.1. Private sector mechanism
2023-04-30ExpenditureUSD 0Output 3.3.1. Private sector mechanism
2023-04-30Incoming fundsUSD 106kOutput 3.2.4 NAP policy developed
2023-04-30ExpenditureUSD 0Output 3.2.4 NAP policy developed
2023-04-30Incoming fundsUSD 60kOutput 3.4.3.Finance strategy formulated
2023-04-30ExpenditureUSD 0Output 3.4.3.Finance strategy formulated
2023-04-30Incoming fundsUSD 113kOutput 3.4.2. Pipeline of adaptation pri
2023-04-30ExpenditureUSD 0Output 3.4.2. Pipeline of adaptation pri
2023-04-30Incoming fundsUSD 140kOutput 3.2.3. NAP developed & validated
2023-04-30ExpenditureUSD 0Output 3.2.3. NAP developed & validated
2023-04-30Incoming fundsUSD 139kOutput 3.1.3 Lessons learned
2023-04-30ExpenditureUSD 0Output 3.1.3 Lessons learned
2023-04-30Incoming fundsUSD 169kOutput 3.1.1. Institutional capacity
2023-04-30ExpenditureUSD 0Output 3.1.1. Institutional capacity
2023-04-30Incoming fundsUSD 218kOutput 3.2.1. Knowledge gaps addressed
2023-04-30ExpenditureUSD 0Output 3.2.1. Knowledge gaps addressed
2023-04-30Incoming fundsUSD 112kProject Management Costs
2023-04-30ExpenditureUSD 0Project Management Costs
2023-04-30Incoming fundsUSD 181kOutput 3.2.2. Alternative strategies
2023-04-30ExpenditureUSD 0Output 3.2.2. Alternative strategies
2023-05-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2023-05-31ExpenditureUSD 35kOutput 3.3.1. Private sector mechanism
2023-05-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2023-05-31ExpenditureUSD 15kOutput 3.4.1. Prioritised mainstreamed
2023-06-30Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2023-06-30ExpenditureUSD 146kOutput 3.3.1. Private sector mechanism
2023-06-30Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2023-06-30ExpenditureUSD 3,940Output 3.4.1. Prioritised mainstreamed
2023-06-30Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2023-06-30ExpenditureUSD 12kOutput 3.2.3. NAP developed & validated
2023-07-31Incoming fundsUSD -23kOutput 3.2.3. NAP developed & validated
2023-07-31ExpenditureUSD 0Output 3.2.3. NAP developed & validated
2023-07-31Incoming fundsUSD 58kOutput 3.4.2. Pipeline of adaptation pri
2023-07-31ExpenditureUSD 31kOutput 3.4.2. Pipeline of adaptation pri
2023-07-31Incoming fundsUSD -9,300Output 3.2.2. Alternative strategies
2023-07-31ExpenditureUSD 0Output 3.2.2. Alternative strategies
2023-07-31Incoming fundsUSD 26kOutput 3.4.3.Finance strategy formulated
2023-07-31ExpenditureUSD 0Output 3.4.3.Finance strategy formulated
2023-07-31Incoming fundsUSD -33kOutput 3.2.1. Knowledge gaps addressed
2023-07-31ExpenditureUSD 0Output 3.2.1. Knowledge gaps addressed
2023-07-31Incoming fundsUSD -14kOutput 3.1.3 Lessons learned
2023-07-31ExpenditureUSD 0Output 3.1.3 Lessons learned
2023-07-31Incoming fundsUSD -32kOutput 3.2.4 NAP policy developed
2023-07-31ExpenditureUSD 0Output 3.2.4 NAP policy developed
2023-07-31Incoming fundsUSD -63kProject Management Costs
2023-07-31ExpenditureUSD 0Project Management Costs
2023-07-31Incoming fundsUSD 65kOutput 3.4.1. Prioritised mainstreamed
2023-07-31ExpenditureUSD 17kOutput 3.4.1. Prioritised mainstreamed
2023-07-31Incoming fundsUSD 30kOutput 3.1.1. Institutional capacity
2023-07-31ExpenditureUSD 0Output 3.1.1. Institutional capacity
2023-07-31Incoming fundsUSD 21kOutput 3.1.2. National Adaptation
2023-07-31ExpenditureUSD 0Output 3.1.2. National Adaptation
2023-07-31Incoming fundsUSD -26kOutput 3.3.1. Private sector mechanism
2023-07-31ExpenditureUSD 5,317Output 3.3.1. Private sector mechanism
2023-08-31Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2023-08-31ExpenditureUSD 11kOutput 3.4.2. Pipeline of adaptation pri
2023-08-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2023-08-31ExpenditureUSD 447Output 3.4.1. Prioritised mainstreamed
2023-08-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2023-08-31ExpenditureUSD 683Output 3.3.1. Private sector mechanism
2023-08-31Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2023-08-31ExpenditureUSD 2,362Output 3.2.2. Alternative strategies
2023-08-31Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2023-08-31ExpenditureUSD 25Output 3.2.3. NAP developed & validated
2023-09-30Incoming fundsUSD -2,137Output 3.3.1. Private sector mechanism
2023-09-30ExpenditureUSD 68Output 3.3.1. Private sector mechanism
2023-09-30Incoming fundsUSD 42kProject Management Costs
2023-09-30ExpenditureUSD 0Project Management Costs
2023-09-30Incoming fundsUSD 2,105Output 3.1.1. Institutional capacity
2023-09-30ExpenditureUSD 0Output 3.1.1. Institutional capacity
2023-09-30Incoming fundsUSD 4,300Output 3.2.1. Knowledge gaps addressed
2023-09-30ExpenditureUSD 9,413Output 3.2.1. Knowledge gaps addressed
2023-09-30Incoming fundsUSD 800Output 3.1.2. National Adaptation
2023-09-30ExpenditureUSD 0Output 3.1.2. National Adaptation
2023-09-30Incoming fundsUSD -41kOutput 3.2.2. Alternative strategies
2023-09-30ExpenditureUSD -19Output 3.2.2. Alternative strategies
2023-09-30Incoming fundsUSD -58kOutput 3.4.1. Prioritised mainstreamed
2023-09-30ExpenditureUSD 8,518Output 3.4.1. Prioritised mainstreamed
2023-09-30Incoming fundsUSD 10kOutput 3.1.3 Lessons learned
2023-09-30ExpenditureUSD 0Output 3.1.3 Lessons learned
2023-09-30Incoming fundsUSD 15kOutput 3.2.4 NAP policy developed
2023-09-30ExpenditureUSD 0Output 3.2.4 NAP policy developed
2023-09-30Incoming fundsUSD 35kOutput 3.4.2. Pipeline of adaptation pri
2023-09-30ExpenditureUSD 4,629Output 3.4.2. Pipeline of adaptation pri
2023-09-30Incoming fundsUSD -5,750Output 3.4.3.Finance strategy formulated
2023-09-30ExpenditureUSD 0Output 3.4.3.Finance strategy formulated
2023-09-30Incoming fundsUSD -2,539Output 3.2.3. NAP developed & validated
2023-09-30ExpenditureUSD 25Output 3.2.3. NAP developed & validated
2023-10-31Incoming fundsUSD 0Output 3.1.2. National Adaptation
2023-10-31ExpenditureUSD 25kOutput 3.1.2. National Adaptation
2023-10-31Incoming fundsUSD 0Output 3.2.4 NAP policy developed
2023-10-31ExpenditureUSD 69kOutput 3.2.4 NAP policy developed
2023-10-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2023-10-31ExpenditureUSD 29kOutput 3.4.1. Prioritised mainstreamed
2023-10-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2023-10-31ExpenditureUSD 64kOutput 3.3.1. Private sector mechanism
2023-10-31Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2023-10-31ExpenditureUSD 64kOutput 3.2.3. NAP developed & validated
2023-10-31Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2023-10-31ExpenditureUSD 13kOutput 3.4.2. Pipeline of adaptation pri
2023-10-31Incoming fundsUSD 0Output 3.4.3.Finance strategy formulated
2023-10-31ExpenditureUSD 59kOutput 3.4.3.Finance strategy formulated
2023-10-31Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2023-10-31ExpenditureUSD 78kOutput 3.2.2. Alternative strategies
2023-10-31Incoming fundsUSD 0Output 3.1.3 Lessons learned
2023-10-31ExpenditureUSD 72kOutput 3.1.3 Lessons learned
2023-10-31Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2023-10-31ExpenditureUSD 69kOutput 3.2.1. Knowledge gaps addressed
2023-10-31Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2023-10-31ExpenditureUSD 127kOutput 3.1.1. Institutional capacity
2023-11-30Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2023-11-30ExpenditureUSD 25Output 3.2.3. NAP developed & validated
2023-11-30Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2023-11-30ExpenditureUSD 13kOutput 3.3.1. Private sector mechanism
2023-11-30Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2023-11-30ExpenditureUSD 11kOutput 3.4.1. Prioritised mainstreamed
2023-11-30Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2023-11-30ExpenditureUSD 9,521Output 3.1.1. Institutional capacity
2023-11-30Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2023-11-30ExpenditureUSD -10Output 3.2.2. Alternative strategies
2023-11-30Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2023-11-30ExpenditureUSD 2,282Output 3.4.2. Pipeline of adaptation pri
2023-11-30Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2023-11-30ExpenditureUSD 11Output 3.2.1. Knowledge gaps addressed
2023-12-31Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2023-12-31ExpenditureUSD 2,399Output 3.1.1. Institutional capacity
2023-12-31Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2023-12-31ExpenditureUSD 90Output 3.2.1. Knowledge gaps addressed
2023-12-31Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2023-12-31ExpenditureUSD 653Output 3.4.2. Pipeline of adaptation pri
2023-12-31Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2023-12-31ExpenditureUSD -2Output 3.2.2. Alternative strategies
2023-12-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2023-12-31ExpenditureUSD 111Output 3.4.1. Prioritised mainstreamed
2023-12-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2023-12-31ExpenditureUSD -3,188Output 3.3.1. Private sector mechanism
2023-12-31Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2023-12-31ExpenditureUSD 32Output 3.2.3. NAP developed & validated
2024-01-31Incoming fundsUSD 0Project Management Costs
2024-01-31ExpenditureUSD 31kProject Management Costs
2024-01-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2024-01-31ExpenditureUSD 180kOutput 3.3.1. Private sector mechanism
2024-01-31Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2024-01-31ExpenditureUSD 34kOutput 3.2.1. Knowledge gaps addressed
2024-01-31Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2024-01-31ExpenditureUSD 27kOutput 3.1.1. Institutional capacity
2024-01-31Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2024-01-31ExpenditureUSD 70kOutput 3.4.2. Pipeline of adaptation pri
2024-01-31Incoming fundsUSD 0Output 3.1.3 Lessons learned
2024-01-31ExpenditureUSD 19kOutput 3.1.3 Lessons learned
2024-01-31Incoming fundsUSD 0Output 3.1.2. National Adaptation
2024-01-31ExpenditureUSD 5,644Output 3.1.2. National Adaptation
2024-01-31Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2024-01-31ExpenditureUSD 3,781Output 3.2.2. Alternative strategies
2024-01-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2024-01-31ExpenditureUSD 62kOutput 3.4.1. Prioritised mainstreamed
2024-01-31Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2024-01-31ExpenditureUSD 15kOutput 3.2.3. NAP developed & validated
2024-02-29Incoming fundsUSD 0Output 3.1.2. National Adaptation
2024-02-29ExpenditureUSD -2,833Output 3.1.2. National Adaptation
2024-02-29Incoming fundsUSD 0Output 3.1.3 Lessons learned
2024-02-29ExpenditureUSD -1,990Output 3.1.3 Lessons learned
2024-02-29Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2024-02-29ExpenditureUSD 4,345Output 3.1.1. Institutional capacity
2024-02-29Incoming fundsUSD 0Project Management Costs
2024-02-29ExpenditureUSD -26Project Management Costs
2024-02-29Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2024-02-29ExpenditureUSD 89Output 3.4.1. Prioritised mainstreamed
2024-02-29Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2024-02-29ExpenditureUSD 4,521Output 3.2.3. NAP developed & validated
2024-02-29Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2024-02-29ExpenditureUSD 8,704Output 3.2.2. Alternative strategies
2024-02-29Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2024-02-29ExpenditureUSD 170Output 3.3.1. Private sector mechanism
2024-02-29Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2024-02-29ExpenditureUSD 845Output 3.2.1. Knowledge gaps addressed
2024-02-29Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2024-02-29ExpenditureUSD -4,615Output 3.4.2. Pipeline of adaptation pri
2024-03-31Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2024-03-31ExpenditureUSD 25Output 3.2.3. NAP developed & validated
2024-03-31Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2024-03-31ExpenditureUSD 2Output 3.2.2. Alternative strategies
2024-03-31Incoming fundsUSD 0Project Management Costs
2024-03-31ExpenditureUSD 20Project Management Costs
2024-03-31Incoming fundsUSD 0Output 3.1.2. National Adaptation
2024-03-31ExpenditureUSD 21kOutput 3.1.2. National Adaptation
2024-03-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2024-03-31ExpenditureUSD 5,811Output 3.3.1. Private sector mechanism
2024-03-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2024-03-31ExpenditureUSD 5,539Output 3.4.1. Prioritised mainstreamed
2024-03-31Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2024-03-31ExpenditureUSD 52kOutput 3.2.1. Knowledge gaps addressed
2024-03-31Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2024-03-31ExpenditureUSD 134Output 3.4.2. Pipeline of adaptation pri
2024-03-31Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2024-03-31ExpenditureUSD 36Output 3.1.1. Institutional capacity
2024-04-30Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2024-04-30ExpenditureUSD -2Output 3.4.2. Pipeline of adaptation pri
2024-04-30Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2024-04-30ExpenditureUSD 16Output 3.2.1. Knowledge gaps addressed
2024-04-30Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2024-04-30ExpenditureUSD 56Output 3.4.1. Prioritised mainstreamed
2024-04-30Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2024-04-30ExpenditureUSD 25Output 3.2.3. NAP developed & validated
2024-04-30Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2024-04-30ExpenditureUSD 192Output 3.3.1. Private sector mechanism
2024-04-30Incoming fundsUSD 0Project Management Costs
2024-04-30ExpenditureUSD -24Project Management Costs
2024-04-30Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2024-04-30ExpenditureUSD -2,458Output 3.1.1. Institutional capacity
2024-04-30Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2024-04-30ExpenditureUSD -8Output 3.2.2. Alternative strategies
2024-05-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2024-05-31ExpenditureUSD -29kOutput 3.4.1. Prioritised mainstreamed
2024-05-31Incoming fundsUSD 0Output 3.2.4 NAP policy developed
2024-05-31ExpenditureUSD -69kOutput 3.2.4 NAP policy developed
2024-05-31Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2024-05-31ExpenditureUSD -63kOutput 3.2.3. NAP developed & validated
2024-05-31Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2024-05-31ExpenditureUSD -78kOutput 3.2.2. Alternative strategies
2024-05-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2024-05-31ExpenditureUSD -63kOutput 3.3.1. Private sector mechanism
2024-05-31Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2024-05-31ExpenditureUSD -13kOutput 3.4.2. Pipeline of adaptation pri
2024-05-31Incoming fundsUSD 0Output 3.1.3 Lessons learned
2024-05-31ExpenditureUSD -72kOutput 3.1.3 Lessons learned
2024-05-31Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2024-05-31ExpenditureUSD -69kOutput 3.2.1. Knowledge gaps addressed
2024-05-31Incoming fundsUSD 0Output 3.4.3.Finance strategy formulated
2024-05-31ExpenditureUSD -59kOutput 3.4.3.Finance strategy formulated
2024-05-31Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2024-05-31ExpenditureUSD -127kOutput 3.1.1. Institutional capacity
2024-05-31Incoming fundsUSD 0Project Management Costs
2024-05-31ExpenditureUSD -31Project Management Costs
2024-05-31Incoming fundsUSD 0Output 3.1.2. National Adaptation
2024-05-31ExpenditureUSD -25kOutput 3.1.2. National Adaptation
2024-06-30Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2024-06-30ExpenditureUSD 10kOutput 3.2.1. Knowledge gaps addressed
2024-06-30Incoming fundsUSD 0Output 3.1.2. National Adaptation
2024-06-30ExpenditureUSD 25kOutput 3.1.2. National Adaptation
2024-06-30Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2024-06-30ExpenditureUSD 8,970Output 3.4.1. Prioritised mainstreamed
2024-06-30Incoming fundsUSD 0Output 3.4.3.Finance strategy formulated
2024-06-30ExpenditureUSD 21kOutput 3.4.3.Finance strategy formulated
2024-06-30Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2024-06-30ExpenditureUSD 65kOutput 3.3.1. Private sector mechanism
2024-06-30Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2024-06-30ExpenditureUSD 80kOutput 3.2.2. Alternative strategies
2024-06-30Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2024-06-30ExpenditureUSD 128kOutput 3.1.1. Institutional capacity
2024-06-30Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2024-06-30ExpenditureUSD 4,124Output 3.4.2. Pipeline of adaptation pri
2024-06-30Incoming fundsUSD 0Project Management Costs
2024-06-30ExpenditureUSD -18kProject Management Costs
2024-06-30Incoming fundsUSD 0Output 3.1.3 Lessons learned
2024-06-30ExpenditureUSD 20kOutput 3.1.3 Lessons learned
2024-06-30Incoming fundsUSD 0Output 3.2.4 NAP policy developed
2024-06-30ExpenditureUSD 70kOutput 3.2.4 NAP policy developed
2024-06-30Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2024-06-30ExpenditureUSD 15kOutput 3.2.3. NAP developed & validated
2024-07-31Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2024-07-31ExpenditureUSD 23Output 3.4.2. Pipeline of adaptation pri
2024-07-31Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2024-07-31ExpenditureUSD 45Output 3.2.3. NAP developed & validated
2024-07-31Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2024-07-31ExpenditureUSD 10Output 3.1.1. Institutional capacity
2024-07-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2024-07-31ExpenditureUSD 106Output 3.3.1. Private sector mechanism
2024-07-31Incoming fundsUSD 0Output 3.2.2. Alternative strategies
2024-07-31ExpenditureUSD 38Output 3.2.2. Alternative strategies
2024-07-31Incoming fundsUSD 0Output 3.1.3 Lessons learned
2024-07-31ExpenditureUSD 16Output 3.1.3 Lessons learned
2024-07-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2024-07-31ExpenditureUSD 41Output 3.4.1. Prioritised mainstreamed
2024-07-31Incoming fundsUSD 0Output 3.1.2. National Adaptation
2024-07-31ExpenditureUSD -3Output 3.1.2. National Adaptation
2024-07-31Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2024-07-31ExpenditureUSD 37Output 3.2.1. Knowledge gaps addressed
2024-08-31Incoming fundsUSD 0Output 3.2.1. Knowledge gaps addressed
2024-08-31ExpenditureUSD 7,396Output 3.2.1. Knowledge gaps addressed
2024-08-31Incoming fundsUSD 0Output 3.4.2. Pipeline of adaptation pri
2024-08-31ExpenditureUSD 44Output 3.4.2. Pipeline of adaptation pri
2024-08-31Incoming fundsUSD 0Output 3.4.1. Prioritised mainstreamed
2024-08-31ExpenditureUSD 77Output 3.4.1. Prioritised mainstreamed
2024-08-31Incoming fundsUSD 0Output 3.3.1. Private sector mechanism
2024-08-31ExpenditureUSD -46Output 3.3.1. Private sector mechanism
2024-08-31Incoming fundsUSD 0Output 3.1.3 Lessons learned
2024-08-31ExpenditureUSD 5,829Output 3.1.3 Lessons learned
2024-08-31Incoming fundsUSD 0Project Management Costs
2024-08-31ExpenditureUSD 164Project Management Costs
2024-08-31Incoming fundsUSD 0Output 3.1.1. Institutional capacity
2024-08-31ExpenditureUSD 5,924Output 3.1.1. Institutional capacity
2024-08-31Incoming fundsUSD 0Output 3.2.3. NAP developed & validated
2024-08-31ExpenditureUSD 5,107Output 3.2.3. NAP developed & validated
2024-08-31Incoming fundsUSD 0Output 3.1.2. National Adaptation
2024-08-31ExpenditureUSD 5,828Output 3.1.2. National Adaptation
2026-08-31ExpenditureUSD 65Output 3.3.1. Private sector mechanismremoved

Showing 300 of 764. The API returns all of them.

Struck-through rows were in the previous version, last seen 2026-10-02 02:28 UTC, and are not in the current file.

Enhancing the National Adaptation Plan Process for the Sultanate of Oman · OpenAid Ledger