United Nations Industrial Development Organization (UNIDO) / unido-activity-oman
Enhancing the National Adaptation Plan Process for the Sultanate of Oman
XM-DAC-41123-PROJECT-220129
USD 2.69mdeclared budget
USD 2.39mdisbursed and spent, 382 of 764 transactions
Implementationstatus
05 Jan 2027planned end
Budget over time
- Reporting organisation
- United Nations Industrial Development Organization
- Start
- 05 Jan 2023 (planned)
- Countries
- —
- Sectors
- 321 · OECD DAC 3-digit
- Funded by
- Green Climate Fund
- Participating
- United Nations Industrial Development Organization (implementing); Green Climate Fund (funding)
- Versions seen
- 2 since 26 Sept 2026 · last checked 2026-10-03 02:36 UTC
Changes
- 2026-10-03Transaction rewritten+1 more
Transaction on 2026-08-31 rewritten USD 64.66 → USD 1,457.7
- Transactions added: 8 transactions added, USD 82k
Enhancing the National Adaptation Plan Process for the Sultanate of Oman · compare ddd1e8ec → 7ae27e2f
Budgets
| Period | Type | Value | Record |
|---|---|---|---|
| 2023-01-01 → 2023-12-31 | original | USD 1.01m | current |
| 2024-01-01 → 2024-12-31 | original | USD 335k | current |
| 2025-01-01 → 2025-12-31 | original | USD 450k | current |
| 2026-01-01 → 2026-12-31 | original | USD 841k | current |
| 2027-01-01 → 2027-12-31 | original | USD 59k | current |
Transactions
| Date | Type | Value | To | Note | Record |
|---|---|---|---|---|---|
| 2023-04-30 | Incoming funds | USD 46k | Output 3.1.2. National Adaptation | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.1.2. National Adaptation | ||
| 2023-04-30 | Incoming funds | USD 244k | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-04-30 | Incoming funds | USD 488k | Output 3.3.1. Private sector mechanism | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2023-04-30 | Incoming funds | USD 106k | Output 3.2.4 NAP policy developed | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.2.4 NAP policy developed | ||
| 2023-04-30 | Incoming funds | USD 60k | Output 3.4.3.Finance strategy formulated | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.4.3.Finance strategy formulated | ||
| 2023-04-30 | Incoming funds | USD 113k | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-04-30 | Incoming funds | USD 140k | Output 3.2.3. NAP developed & validated | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2023-04-30 | Incoming funds | USD 139k | Output 3.1.3 Lessons learned | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.1.3 Lessons learned | ||
| 2023-04-30 | Incoming funds | USD 169k | Output 3.1.1. Institutional capacity | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2023-04-30 | Incoming funds | USD 218k | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-04-30 | Incoming funds | USD 112k | Project Management Costs | ||
| 2023-04-30 | Expenditure | USD 0 | Project Management Costs | ||
| 2023-04-30 | Incoming funds | USD 181k | Output 3.2.2. Alternative strategies | ||
| 2023-04-30 | Expenditure | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2023-05-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2023-05-31 | Expenditure | USD 35k | Output 3.3.1. Private sector mechanism | ||
| 2023-05-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-05-31 | Expenditure | USD 15k | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-06-30 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2023-06-30 | Expenditure | USD 146k | Output 3.3.1. Private sector mechanism | ||
| 2023-06-30 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-06-30 | Expenditure | USD 3,940 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-06-30 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2023-06-30 | Expenditure | USD 12k | Output 3.2.3. NAP developed & validated | ||
| 2023-07-31 | Incoming funds | USD -23k | Output 3.2.3. NAP developed & validated | ||
| 2023-07-31 | Expenditure | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2023-07-31 | Incoming funds | USD 58k | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-07-31 | Expenditure | USD 31k | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-07-31 | Incoming funds | USD -9,300 | Output 3.2.2. Alternative strategies | ||
| 2023-07-31 | Expenditure | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2023-07-31 | Incoming funds | USD 26k | Output 3.4.3.Finance strategy formulated | ||
| 2023-07-31 | Expenditure | USD 0 | Output 3.4.3.Finance strategy formulated | ||
| 2023-07-31 | Incoming funds | USD -33k | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-07-31 | Expenditure | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-07-31 | Incoming funds | USD -14k | Output 3.1.3 Lessons learned | ||
| 2023-07-31 | Expenditure | USD 0 | Output 3.1.3 Lessons learned | ||
| 2023-07-31 | Incoming funds | USD -32k | Output 3.2.4 NAP policy developed | ||
| 2023-07-31 | Expenditure | USD 0 | Output 3.2.4 NAP policy developed | ||
| 2023-07-31 | Incoming funds | USD -63k | Project Management Costs | ||
| 2023-07-31 | Expenditure | USD 0 | Project Management Costs | ||
| 2023-07-31 | Incoming funds | USD 65k | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-07-31 | Expenditure | USD 17k | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-07-31 | Incoming funds | USD 30k | Output 3.1.1. Institutional capacity | ||
| 2023-07-31 | Expenditure | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2023-07-31 | Incoming funds | USD 21k | Output 3.1.2. National Adaptation | ||
| 2023-07-31 | Expenditure | USD 0 | Output 3.1.2. National Adaptation | ||
| 2023-07-31 | Incoming funds | USD -26k | Output 3.3.1. Private sector mechanism | ||
| 2023-07-31 | Expenditure | USD 5,317 | Output 3.3.1. Private sector mechanism | ||
| 2023-08-31 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-08-31 | Expenditure | USD 11k | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-08-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-08-31 | Expenditure | USD 447 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-08-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2023-08-31 | Expenditure | USD 683 | Output 3.3.1. Private sector mechanism | ||
| 2023-08-31 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2023-08-31 | Expenditure | USD 2,362 | Output 3.2.2. Alternative strategies | ||
| 2023-08-31 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2023-08-31 | Expenditure | USD 25 | Output 3.2.3. NAP developed & validated | ||
| 2023-09-30 | Incoming funds | USD -2,137 | Output 3.3.1. Private sector mechanism | ||
| 2023-09-30 | Expenditure | USD 68 | Output 3.3.1. Private sector mechanism | ||
| 2023-09-30 | Incoming funds | USD 42k | Project Management Costs | ||
| 2023-09-30 | Expenditure | USD 0 | Project Management Costs | ||
| 2023-09-30 | Incoming funds | USD 2,105 | Output 3.1.1. Institutional capacity | ||
| 2023-09-30 | Expenditure | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2023-09-30 | Incoming funds | USD 4,300 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-09-30 | Expenditure | USD 9,413 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-09-30 | Incoming funds | USD 800 | Output 3.1.2. National Adaptation | ||
| 2023-09-30 | Expenditure | USD 0 | Output 3.1.2. National Adaptation | ||
| 2023-09-30 | Incoming funds | USD -41k | Output 3.2.2. Alternative strategies | ||
| 2023-09-30 | Expenditure | USD -19 | Output 3.2.2. Alternative strategies | ||
| 2023-09-30 | Incoming funds | USD -58k | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-09-30 | Expenditure | USD 8,518 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-09-30 | Incoming funds | USD 10k | Output 3.1.3 Lessons learned | ||
| 2023-09-30 | Expenditure | USD 0 | Output 3.1.3 Lessons learned | ||
| 2023-09-30 | Incoming funds | USD 15k | Output 3.2.4 NAP policy developed | ||
| 2023-09-30 | Expenditure | USD 0 | Output 3.2.4 NAP policy developed | ||
| 2023-09-30 | Incoming funds | USD 35k | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-09-30 | Expenditure | USD 4,629 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-09-30 | Incoming funds | USD -5,750 | Output 3.4.3.Finance strategy formulated | ||
| 2023-09-30 | Expenditure | USD 0 | Output 3.4.3.Finance strategy formulated | ||
| 2023-09-30 | Incoming funds | USD -2,539 | Output 3.2.3. NAP developed & validated | ||
| 2023-09-30 | Expenditure | USD 25 | Output 3.2.3. NAP developed & validated | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.1.2. National Adaptation | ||
| 2023-10-31 | Expenditure | USD 25k | Output 3.1.2. National Adaptation | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.2.4 NAP policy developed | ||
| 2023-10-31 | Expenditure | USD 69k | Output 3.2.4 NAP policy developed | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-10-31 | Expenditure | USD 29k | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2023-10-31 | Expenditure | USD 64k | Output 3.3.1. Private sector mechanism | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2023-10-31 | Expenditure | USD 64k | Output 3.2.3. NAP developed & validated | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-10-31 | Expenditure | USD 13k | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.4.3.Finance strategy formulated | ||
| 2023-10-31 | Expenditure | USD 59k | Output 3.4.3.Finance strategy formulated | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2023-10-31 | Expenditure | USD 78k | Output 3.2.2. Alternative strategies | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.1.3 Lessons learned | ||
| 2023-10-31 | Expenditure | USD 72k | Output 3.1.3 Lessons learned | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-10-31 | Expenditure | USD 69k | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-10-31 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2023-10-31 | Expenditure | USD 127k | Output 3.1.1. Institutional capacity | ||
| 2023-11-30 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2023-11-30 | Expenditure | USD 25 | Output 3.2.3. NAP developed & validated | ||
| 2023-11-30 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2023-11-30 | Expenditure | USD 13k | Output 3.3.1. Private sector mechanism | ||
| 2023-11-30 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-11-30 | Expenditure | USD 11k | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-11-30 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2023-11-30 | Expenditure | USD 9,521 | Output 3.1.1. Institutional capacity | ||
| 2023-11-30 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2023-11-30 | Expenditure | USD -10 | Output 3.2.2. Alternative strategies | ||
| 2023-11-30 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-11-30 | Expenditure | USD 2,282 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-11-30 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-11-30 | Expenditure | USD 11 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-12-31 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2023-12-31 | Expenditure | USD 2,399 | Output 3.1.1. Institutional capacity | ||
| 2023-12-31 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-12-31 | Expenditure | USD 90 | Output 3.2.1. Knowledge gaps addressed | ||
| 2023-12-31 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-12-31 | Expenditure | USD 653 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2023-12-31 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2023-12-31 | Expenditure | USD -2 | Output 3.2.2. Alternative strategies | ||
| 2023-12-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-12-31 | Expenditure | USD 111 | Output 3.4.1. Prioritised mainstreamed | ||
| 2023-12-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2023-12-31 | Expenditure | USD -3,188 | Output 3.3.1. Private sector mechanism | ||
| 2023-12-31 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2023-12-31 | Expenditure | USD 32 | Output 3.2.3. NAP developed & validated | ||
| 2024-01-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2024-01-31 | Expenditure | USD 31k | Project Management Costs | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2024-01-31 | Expenditure | USD 180k | Output 3.3.1. Private sector mechanism | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-01-31 | Expenditure | USD 34k | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2024-01-31 | Expenditure | USD 27k | Output 3.1.1. Institutional capacity | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-01-31 | Expenditure | USD 70k | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.1.3 Lessons learned | ||
| 2024-01-31 | Expenditure | USD 19k | Output 3.1.3 Lessons learned | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.1.2. National Adaptation | ||
| 2024-01-31 | Expenditure | USD 5,644 | Output 3.1.2. National Adaptation | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2024-01-31 | Expenditure | USD 3,781 | Output 3.2.2. Alternative strategies | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-01-31 | Expenditure | USD 62k | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-01-31 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2024-01-31 | Expenditure | USD 15k | Output 3.2.3. NAP developed & validated | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.1.2. National Adaptation | ||
| 2024-02-29 | Expenditure | USD -2,833 | Output 3.1.2. National Adaptation | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.1.3 Lessons learned | ||
| 2024-02-29 | Expenditure | USD -1,990 | Output 3.1.3 Lessons learned | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2024-02-29 | Expenditure | USD 4,345 | Output 3.1.1. Institutional capacity | ||
| 2024-02-29 | Incoming funds | USD 0 | Project Management Costs | ||
| 2024-02-29 | Expenditure | USD -26 | Project Management Costs | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-02-29 | Expenditure | USD 89 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2024-02-29 | Expenditure | USD 4,521 | Output 3.2.3. NAP developed & validated | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2024-02-29 | Expenditure | USD 8,704 | Output 3.2.2. Alternative strategies | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2024-02-29 | Expenditure | USD 170 | Output 3.3.1. Private sector mechanism | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-02-29 | Expenditure | USD 845 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-02-29 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-02-29 | Expenditure | USD -4,615 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-03-31 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2024-03-31 | Expenditure | USD 25 | Output 3.2.3. NAP developed & validated | ||
| 2024-03-31 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2024-03-31 | Expenditure | USD 2 | Output 3.2.2. Alternative strategies | ||
| 2024-03-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2024-03-31 | Expenditure | USD 20 | Project Management Costs | ||
| 2024-03-31 | Incoming funds | USD 0 | Output 3.1.2. National Adaptation | ||
| 2024-03-31 | Expenditure | USD 21k | Output 3.1.2. National Adaptation | ||
| 2024-03-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2024-03-31 | Expenditure | USD 5,811 | Output 3.3.1. Private sector mechanism | ||
| 2024-03-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-03-31 | Expenditure | USD 5,539 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-03-31 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-03-31 | Expenditure | USD 52k | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-03-31 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-03-31 | Expenditure | USD 134 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-03-31 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2024-03-31 | Expenditure | USD 36 | Output 3.1.1. Institutional capacity | ||
| 2024-04-30 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-04-30 | Expenditure | USD -2 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-04-30 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-04-30 | Expenditure | USD 16 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-04-30 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-04-30 | Expenditure | USD 56 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-04-30 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2024-04-30 | Expenditure | USD 25 | Output 3.2.3. NAP developed & validated | ||
| 2024-04-30 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2024-04-30 | Expenditure | USD 192 | Output 3.3.1. Private sector mechanism | ||
| 2024-04-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2024-04-30 | Expenditure | USD -24 | Project Management Costs | ||
| 2024-04-30 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2024-04-30 | Expenditure | USD -2,458 | Output 3.1.1. Institutional capacity | ||
| 2024-04-30 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2024-04-30 | Expenditure | USD -8 | Output 3.2.2. Alternative strategies | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-05-31 | Expenditure | USD -29k | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.2.4 NAP policy developed | ||
| 2024-05-31 | Expenditure | USD -69k | Output 3.2.4 NAP policy developed | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2024-05-31 | Expenditure | USD -63k | Output 3.2.3. NAP developed & validated | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2024-05-31 | Expenditure | USD -78k | Output 3.2.2. Alternative strategies | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2024-05-31 | Expenditure | USD -63k | Output 3.3.1. Private sector mechanism | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-05-31 | Expenditure | USD -13k | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.1.3 Lessons learned | ||
| 2024-05-31 | Expenditure | USD -72k | Output 3.1.3 Lessons learned | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-05-31 | Expenditure | USD -69k | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.4.3.Finance strategy formulated | ||
| 2024-05-31 | Expenditure | USD -59k | Output 3.4.3.Finance strategy formulated | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2024-05-31 | Expenditure | USD -127k | Output 3.1.1. Institutional capacity | ||
| 2024-05-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2024-05-31 | Expenditure | USD -31 | Project Management Costs | ||
| 2024-05-31 | Incoming funds | USD 0 | Output 3.1.2. National Adaptation | ||
| 2024-05-31 | Expenditure | USD -25k | Output 3.1.2. National Adaptation | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-06-30 | Expenditure | USD 10k | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.1.2. National Adaptation | ||
| 2024-06-30 | Expenditure | USD 25k | Output 3.1.2. National Adaptation | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-06-30 | Expenditure | USD 8,970 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.4.3.Finance strategy formulated | ||
| 2024-06-30 | Expenditure | USD 21k | Output 3.4.3.Finance strategy formulated | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2024-06-30 | Expenditure | USD 65k | Output 3.3.1. Private sector mechanism | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2024-06-30 | Expenditure | USD 80k | Output 3.2.2. Alternative strategies | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2024-06-30 | Expenditure | USD 128k | Output 3.1.1. Institutional capacity | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-06-30 | Expenditure | USD 4,124 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-06-30 | Incoming funds | USD 0 | Project Management Costs | ||
| 2024-06-30 | Expenditure | USD -18k | Project Management Costs | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.1.3 Lessons learned | ||
| 2024-06-30 | Expenditure | USD 20k | Output 3.1.3 Lessons learned | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.2.4 NAP policy developed | ||
| 2024-06-30 | Expenditure | USD 70k | Output 3.2.4 NAP policy developed | ||
| 2024-06-30 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2024-06-30 | Expenditure | USD 15k | Output 3.2.3. NAP developed & validated | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-07-31 | Expenditure | USD 23 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2024-07-31 | Expenditure | USD 45 | Output 3.2.3. NAP developed & validated | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2024-07-31 | Expenditure | USD 10 | Output 3.1.1. Institutional capacity | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2024-07-31 | Expenditure | USD 106 | Output 3.3.1. Private sector mechanism | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.2.2. Alternative strategies | ||
| 2024-07-31 | Expenditure | USD 38 | Output 3.2.2. Alternative strategies | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.1.3 Lessons learned | ||
| 2024-07-31 | Expenditure | USD 16 | Output 3.1.3 Lessons learned | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-07-31 | Expenditure | USD 41 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.1.2. National Adaptation | ||
| 2024-07-31 | Expenditure | USD -3 | Output 3.1.2. National Adaptation | ||
| 2024-07-31 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-07-31 | Expenditure | USD 37 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-08-31 | Incoming funds | USD 0 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-08-31 | Expenditure | USD 7,396 | Output 3.2.1. Knowledge gaps addressed | ||
| 2024-08-31 | Incoming funds | USD 0 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-08-31 | Expenditure | USD 44 | Output 3.4.2. Pipeline of adaptation pri | ||
| 2024-08-31 | Incoming funds | USD 0 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-08-31 | Expenditure | USD 77 | Output 3.4.1. Prioritised mainstreamed | ||
| 2024-08-31 | Incoming funds | USD 0 | Output 3.3.1. Private sector mechanism | ||
| 2024-08-31 | Expenditure | USD -46 | Output 3.3.1. Private sector mechanism | ||
| 2024-08-31 | Incoming funds | USD 0 | Output 3.1.3 Lessons learned | ||
| 2024-08-31 | Expenditure | USD 5,829 | Output 3.1.3 Lessons learned | ||
| 2024-08-31 | Incoming funds | USD 0 | Project Management Costs | ||
| 2024-08-31 | Expenditure | USD 164 | Project Management Costs | ||
| 2024-08-31 | Incoming funds | USD 0 | Output 3.1.1. Institutional capacity | ||
| 2024-08-31 | Expenditure | USD 5,924 | Output 3.1.1. Institutional capacity | ||
| 2024-08-31 | Incoming funds | USD 0 | Output 3.2.3. NAP developed & validated | ||
| 2024-08-31 | Expenditure | USD 5,107 | Output 3.2.3. NAP developed & validated | ||
| 2024-08-31 | Incoming funds | USD 0 | Output 3.1.2. National Adaptation | ||
| 2024-08-31 | Expenditure | USD 5,828 | Output 3.1.2. National Adaptation | ||
| 2026-08-31 | Expenditure | USD 65 | Output 3.3.1. Private sector mechanism | removed |
Showing 300 of 764. The API returns all of them.
Struck-through rows were in the previous version, last seen 2026-10-02 02:28 UTC, and are not in the current file.